| Sl No | Description | Qty | Unit | UTHRA CONSTRUCTION COMPANY L1 | RAJESHKANNAN T L3 | SHRIDURGA CONTRACTORS L2 |
|---|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of Soil except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial lead of 10m etc., and lift of 2m etc., complete | 8 | M3 | 201.49 ₹1,611.9 Lowest | 210 ₹1,680 | 205 ₹1,640 |
| 2.01 | Supplying and filling in foundation and basement with river sand in layers of 15 cm thick well rammed and consolidation including watering complying with Std specification etc.,
MMC DATA P-26 SL-4 | 1 | M3 | 1,665.47 ₹1,665.47 Lowest | 1,710 ₹1,710 | 1,700 ₹1,700 |
| 3.01 | Plain Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm gauge hard broken granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc., complete
MMC DATA P-28 SL-10 | 1 | M3 | 5,160.07 ₹5,160.07 Lowest | 5,270 ₹5,270 | 5,265 ₹5,265 |
| 4.01 | Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc., Complete( RCC Column footing plinth beam and lintel side) | 18 | M2 | 451.13 ₹8,120.4 Lowest | 465 ₹8,370 | 460 ₹8,280 |
| 5.01 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc., complete and also including fixing fanclamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. MMC Data P No-32 Sl No-15 | 5 | M3 | 8,803.06 ₹44,015.28 Lowest | 8,990 ₹44,950 | 8,980 ₹44,900 |
| 6.01 | Supply erecting STEEL CENTERING for Sides and Soffis inc Supports and Strutting for Plain Surface Such as Reinforced Cement Concrete Slaps Rectangular Beams tee or el beams Lintels, bed blocks Staircase in all Floors of any height (the retrived Materials should be taken back by the Contractor) the Payment for Centering Shall be given the Concrete is laid(Bottom only) | 7 | M2 | 1,000.44 ₹7,003.1 Lowest | 1,025 ₹7,175 | 1,020 ₹7,140 |
| 7.01 | Plastering with cement mortar 1:3 (One Cement, Three Sand) 20mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications. | 4 | M2 | 556.57 ₹2,226.29 Lowest | 570 ₹2,280 | 565 ₹2,260 |
| 8.01 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 300 | Kg | 90.06 ₹27,018.6 Lowest | 92 ₹27,600 | 92 ₹27,600 |
| 9.01 | Cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc, complete | 2 | m3 | 8,165.51 ₹16,331.01 Lowest | 8,335 ₹16,670 | 8,300 ₹16,600 |
| 10.01 | Add GST18% | 1 | GST | 20,367.38 ₹20,367.38 Lowest | 20,827 ₹20,827 | 20,769 ₹20,769 |
Tender Value
₹1.4 L
EMD Value
₹1,362
Closing Date
28 Aug 2024, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of road cross culvert samanthana nagar 1st cross street in ward 20
2024_MAWS_473182_1
E2 / Est.No. 269 / 23-24 (2nd Call)
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹1,362
16 Oct 2025
15 Aug 2024
28 Aug 2024
15 Aug 2024
28 Aug 2024
15 Aug 2024
Amount
Earth work excavation in all kinds of Soil except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial lead of 10m etc., and lift of 2m etc., complete
Supplying and filling in foundation and basement with river sand in layers of 15 cm thick well rammed and consolidation including watering complying with Std specification etc., MMC DATA P-26 SL-4
Plain Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm gauge hard broken granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc., complete MMC DATA P-28 SL-10
Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc., Complete( RCC Column footing plinth beam and lintel side)
Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc., complete and also including fixing fanclamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. MMC Data P No-32 Sl No-15
Supply erecting STEEL CENTERING for Sides and Soffis inc Supports and Strutting for Plain Surface Such as Reinforced Cement Concrete Slaps Rectangular Beams tee or el beams Lintels, bed blocks Staircase in all Floors of any height (the retrived Materials should be taken back by the Contractor) the Payment for Centering Shall be given the Concrete is laid(Bottom only)
Plastering with cement mortar 1:3 (One Cement, Three Sand) 20mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc, complete
Add GST18%
SHRIDURGA CONTRACTORS (BID ID -1121614)
RAJESHKANNAN T (BID ID -1121606)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .