| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.4 L+₹9,006.58 (1.24%)Admitted-Fee/PreQual/Technical/Finance | ₹7.4 L+₹9,006.58 (1.24%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.5 L+₹20,217.74 (2.78%)Admitted-Fee/PreQual/Technical/Finance | ₹7.5 L+₹20,217.74 (2.78%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.7 L+₹46,960.65 (6.46%)Admitted-Fee/PreQual/Technical/Finance | ₹7.7 L+₹46,960.65 (6.46%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.9 L+₹59,375.26 (8.16%)Admitted-Fee/PreQual/Technical/Finance SF NO 348 5 TIRUPUR TO UDUMALAI ROAD GUDIMANGALAM | TIRUPPUR | TAMIL NADU | 638051 | ₹7.9 L+₹59,375.26 (8.16%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | K Sivajiganesan L1 | MAASI CONSTRUCTIONS L2 | S.Ravichandran L4 | karthik L5 | Rajkumarrao L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Pressed Tiles & Weathering Course (Unique Code W-0037,Page 30,SOR 2025-26 Vol 1 | 175 | M3 | 15 ₹2,625 Lowest | 92 ₹16,100 | 47.7 ₹8,347.5 | 47.7 ₹8,347.5 | 46.74 ₹8,179.5 |
| 2.00 | Clean removal of cement plaster from walls (Unique Code W-0104,Page 34,SOR 2025-26 Vol 1) | 138.06 | M2 | 4 ₹552.24 Lowest | 58.25 ₹8,041.96 | 8.7 ₹1,201.12 | 8.7 ₹1,201.12 | 8.6 ₹1,187.31 |
| 3.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 7 | M3 | 150 ₹1,050 Lowest | 1,177 ₹8,239 | 213.3 ₹1,493.1 | 213.3 ₹1,493.1 | 208.05 ₹1,456.35 |
| 4.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 1 | M3 | 1,500 ₹1,500 Lowest | 8,851 ₹8,851 | 2,086.7 ₹2,086.7 | 2,086.7 ₹2,086.7 | 2,043.74 ₹2,043.74 |
| 5.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | 4,300 ₹4,300 Lowest | 12,763 ₹12,763 | 5,881.3 ₹5,881.3 | 5,881.3 ₹5,881.3 | 5,667.32 ₹5,667.32 |
| 6.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 6 | M3 | 7,600 ₹45,609.12 | 8,811 ₹52,876.57 | 7,464.3 ₹44,794.76 | 7,800 ₹46,809.36 | 7,269.26 ₹43,624.28 Lowest |
| 7.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 0.5 | M3 | 7,500 ₹3,753.75 | 21,464 ₹10,742.73 | 7,815.1 ₹3,911.46 | 7,815.1 ₹3,911.46 | 7,406.84 ₹3,707.12 Lowest |
| 8.00 | Weathering Course with Concrete Broken Brick (S.I.No.278) & ( P & D) Data 54.Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers etc., complete.-10 cum | 13 | M3 | 3,800 ₹49,400 Lowest | 4,634 ₹60,242 | 3,995 ₹51,935 | 3,995 ₹51,935 | 3,912.85 ₹50,867.05 |
| 9.00 | Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 12 mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete | 160 | M2 | 1,200 ₹1,92,000 | 410.14 ₹65,622.4 Lowest | 1,335 ₹2,13,600 | 1,400 ₹2,24,000 | 1,243.17 ₹1,98,907.2 |
| 10.00 | Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement | 11.99 | M2 | 1,000 ₹11,995 Lowest | 1,654 ₹19,839.73 | 1,063.3 ₹12,754.28 | 1,063.3 ₹12,754.28 | 1,035.61 ₹12,422.14 |
Tender Value
₹9.8 L
EMD Value
₹9,800
Closing Date
5 Aug 2026, 3:00 pmClosed
The Commissioner,Thanjavur city municipal corporat
The Commissioner,Thanjavur city municipal corporation
REPAIR AND MAINTANCE OF COMPUTER LAB,TOILET AT KARANTHAI CORPORATION MIDDLE SCHOOL IN WARD NO 05
2026_MAWS_685916_1
5983_1/2026/MCE5
Open Tender
Civil Works - Others
Item Rate
Thanjavur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,800
11 Sept 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Pressed Tiles & Weathering Course (Unique Code W-0037,Page 30,SOR 2025-26 Vol 1 | 175 | M3 | - | - |
| 2 | Clean removal of cement plaster from walls (Unique Code W-0104,Page 34,SOR 2025-26 Vol 1) | 138.06 | M2 | - | - |
| 3 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 7 | M3 | - | - |
| 4 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 1 | M3 | - | - |
| 5 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | - | - |
| 6 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 6 | M3 | - | - |
| 7 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 0.5 | M3 | - | - |
| 8 | Weathering Course with Concrete Broken Brick (S.I.No.278) & ( P & D) Data 54.Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers etc., complete.-10 cum | 13 | M3 | - | - |
| 9 | Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 12 mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete | 160 | M2 | - | - |
| 10 | Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement | 12 | M2 | - | - |
stage.html
html • 0.02 MB
finance_824515.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_824515.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .