Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -30.65% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹5,104.77 (3.79%)Admitted-Finance | -28.02% | ₹1.4 L+₹5,104.77 (3.79%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹10,947.11 (8.13%)Admitted-Finance | -25.01% | ₹1.5 L+₹10,947.11 (8.13%) | L3 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
11 Sept 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
AS PER NIT
2026_RDPR_323299_27
e-Nit 44 of REW Ramban(2nd call)
Open Tender
Civil Works
Percentage
RAMBAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹3,920
Yes
17 Sept 2026
3 Sept 2026
12 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earh work in excavation by Mechanical means ( Hydraulic excavatar ) over areas (Exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan ) including . disposal of excavated earth, lead upto 50 mtr.and lift upto 1.50 mtr, disposed earth to be levelled and neatly dressed. | 176.22 | cum | 187.3 | ₹33,006.01 |
| 2 | Providing and laying of river /nallah bed material with compaction incl supplying and all completed job | 25 | cum | 1,023.55 | ₹25,588.75 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 4.95 | cum | 5,733.6 | ₹28,381.32 |
| 4 | Dry Random Rubble Masonary with hard stone in foundation and plinth Using Nallah stone with out bond stone | 22.28 | cum | 2,793.8 | ₹62,245.86 |
| 7 | Centering and shuttering incl.strutting and propping etc. | 11.53 | sqm | 286.35 | ₹3,301.62 |
| 8 | Carriage of cement | 1.07 | mt | 607.04 | ₹649.53 |
| 9 | Carriage of sand | 2.23 | cum | 2,293.9 | ₹5,115.4 |
| 10 | Carriage of aggregate | 4.34 | cum | 1,099.34 | ₹4,771.14 |
| 11 | Carriage of stones | 40.13 | cum | 698.68 | ₹28,038.03 |
| 12 | CIB of granite | 1 | No | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_1087694.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .