Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹61.0 L+₹8.6 L (16.4%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹65.0 L+₹12.6 L (23.9%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹66.7 L+₹14.3 L (27.2%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹69.3 L+₹16.9 L (32.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹99.1 L
EMD Value
₹2.0 L
Closing Date
6 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO Marwah
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_328929_3
14 of 2026-27
Open Tender
Agricultural or Forestry
Percentage
120 days
29D
SBD
2 documents required · 2 mandatory
₹1,500
DFO Marwah
₹2.0 L
7 Nov 2026
22 Oct 2026
7 Nov 2026
22 Oct 2026
6 Nov 2026
23 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & fixing of Barbed wire fencing with wooden Posts (minimum height = 6' & minimum mid-girth = 14'') with 4 Strand & 2 Criss-Cross BABW in Earthen Pits & Cement Concrete Block for every 10TH Post and various works as per the detailed estimate.
Note: i) Wooden fence posts shall be extracted and prepared in personal supervision of concerned BO (to be cross verified by RFO) . ii) The contractor shall be solely responsible for the conversion and all other operations required for the extraction and preparation of wooden fence posts duly fashioned of the prescribed dimensions. The contractor shall also be responsible for the collection and removal of lops, tops and timber lying within a radius of 3 km from the closure establishment site for extraction and transportation of wooden fence posts, as part of the work, without any additional financial liability to the Department.If any unauthorized felling of un-enumerated trees is found, action under Sec. 26 of Indian Forest Act, 1927 would be initiated. The Black Annealed Barbed wire with standard specification conforming to product code BA-BW, allied materials like “U” nails etc. and its mechanical carriage including loading, unloading and stacking charges will be managed/procured himself by the contractor. iii) A proper testing certificate with regard to the material i.e Barbed Wire etc. has to be produced by the contractor before the execution of work. A proper Measurement Book of the work has to be prepared against which work done payment is to be made to the contractor. | 75,000 | rft | 68.32 | ₹51,24,000 |
| 2 | Planting of Poly raised Conifer saplings/ Medicinal plants along the contours as well as on the flat surface in Staggered pitss of size 45cm x 45cm x 45cm within the available blanks including carriage/lifting of plants from different nurseries of Marwah Forest Division by mechanical transport within a maximum lead of 100 Kms and headload carriage including loading and unloading upto site of work with all operations. (Note: Plant material shall be supplied departmentally) | 45,000 | No | 29.34 | ₹13,20,300 |
| 3 | Planting of Naked root saplings of Fruit/Fodder species along the contours as well as on the flat surface in Staggered pits of size 45cm x 45cm x 45cm within the available blanks including carriage/lifting of plants from different nurseries of Marwah Forest Division by mechanical transport within a maximum lead of 100 Kms and headload carriage including loading and unloading upto site of work with all operations. (Note: Plant material shall be supplied departmentally) | 43,000 | No | 23.17 | ₹9,96,310 |
| 4 | Afforestation works by means of Patch sowing of conifer seeds @ 30 seeds/Patch in 45cm × 45cm × 15cm patches including cost and carriage of seeds. | 1,30,000 | No | 6.99 | ₹9,08,700 |
| 5 | Afforestation works by means of Dibbling of Aesculeus, Walnut & Oak seeds including cost and carriage of seeds | 22,500 | No | 7.18 | ₹1,61,550 |
| 6 | Afforestation works by means of Augmentation of grass slips | 1,78,250 | No | 6.35 | ₹11,31,887.5 |
| 7 | DRSM work- Excavation of foundation for DRSM Structures.Collection of stones from different sites and their dumping .Carriage of stones from dumping site to work site through head load.Fashioning and dressing of stones using hammers.Construction of structures along the gullies /sliding zones.Numbering of structures by using paint propoerly complete in all respect.(Rates as per Forest Schedule Rate 2017) | 240 | cum | 1,099 | ₹2,63,760 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_1114580.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .