Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹9,300
Closing Date
2 Oct 2026, 2:00 pm5d left
SE M1
NCTPS II
Carrying out the facilitation works to attending Boiler tube rectification work, Arc filling of eroded tubes
2026_EB_705616_1
NCTPS_II_UI_Spec_95_26_27
Open Tender
Maintenance Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,300
Yes
18 Sept 2026
18 Sept 2026
3 Oct 2026
18 Sept 2026
2 Oct 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for air cleaning and water washing the boiler tube puncture area to facilitate boiler tube rectification works. | 4 | times | - | - |
| 2 | Assistance and inspection for Boiler Hydraulic test when the unit is in standby condition. This work comprises of assistance for hydraulic test and inspection of Boiler at pressurized condition in boiler I st pass, Inter pass, II nd pass and Economiser hopper area and allied valve operations etc., | 4 | times | - | - |
| 3 | Charges for transportation, Assembling and dismantling of Temporary maintenance platform / Sky climer for shut down maintenance works.a) Transportation of 1set of Temporary maintenance platform/ Sky climber along with ropes, hoist, power cable etc. from pocket store. | 12 | nos | - | - |
| 4 | b) Opening/Closing of manhole doors, leading & lifting of platform to 11 mtr & transporting of ropes to 88 mtrs and providing temporary platform in 11 mtr level assembling of Sky climber inside the boiler. | 4 | nos | - | - |
| 5 | c) Assembling / dismantling of Sky climber and removal of Temporary Maintenance platform / For one No. in 11 mtr inside the boiler: | 12 | nos | - | - |
| 6 | Charges for shifting the sky climber inside the furnace for access of platen super-heater coils. | 32 | nos | - | - |
| 7 | Charges for operation of sky climber as per the requirements to assist various overhauling works such as Boiler cleaning, tube thickness survey etc., during the maintenance work period. | 48 | nos | - | - |
| 8 | Strengthening of existing joints: This work involves identification of less eroded existing joints, transportation of tools & plants and consumables, Grinding less eroded joints and strengthening the joints by welding with IBR welder. | 60 | joint | - | - |
| 9 | Arc filling: Charges to IBR welder for Arc filling of area 25 x 150 M2 by 3 layer. | 100 | nos | - | - |
| 10 | Charges for fin welding:Charges for fin welding by cleaning, surface preparation and welding. | 480 | m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_848093.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .