Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹55.3 L+₹3.1 L (5.84%)Admitted-Fee/PreQual/Technical/Finance R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹57.5 L+₹5.2 L (9.91%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹97.9 L
EMD Value
₹2.0 L
Closing Date
28 Jul 2026, 4:00 pmClosed
AS PER THE NIT
AS PER THE NIT
Repair and renovation of Hanuman Mandir Ghat and allied Works on Heritage Pattern at Amira Kadal Srinagar.
2026_PWDJK_317174_1
NIT NO 49/RNB/RAJ OF 2026-27 DATED 21/07/2026
Open Tender
Civil Works
Percentage
210 days
SRINAGAR
AS PER THE NIT
2 documents required · 2 mandatory
₹1,600
Yes
AS PER THE NIT
₹2.0 L
Yes
5 Aug 2026
21 Jul 2026
29 Jul 2026
22 Jul 2026
28 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) | 43.39 | Cum | - | - |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 2.27 | Cum | - | - |
| 3 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 9.51 | Cum | - | - |
| 4 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. | 124.01 | Cum | - | - |
| 5 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 59.47 | Cum | - | - |
| 6 | P/L stone soling (Hand packed) in trenches incl. ramming, dressing watering etc. incl. all leads, lifts and carriage upto site of work complete. | 24.63 | Cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) incl. cost and carriage of materials involved complete. | 16.26 | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)incl. cost and carriage of all materials involved complete. | 20.3 | Cum | - | - |
| 9 | Providing and laying chisel dressed Devri Stone of size 300x200 mm face
with 150 mm depth in cement mortar 1: 6 (1 cement : 6 coarse sand) upto
plinth level including curing. One face dressed Fine chisel dressed | 161.71 | Sqm | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl cost and carriage of materials involved complete. | 2.87 | Cum | - | - |
stage.html
html • 0.03 MB
finance_1038210.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1038210.xls
BOQ • 0.24 MB
Addendum.pdf
PDF • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .