| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 LAdmitted-Finance | ₹4.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | C L Engineering Concern L1 | M/s Prasanta Karmakar L2 |
|---|---|---|---|---|---|
| 1.00Item description | |||||
| 1.01 | Cleaning of Lancashire boiler | 2 | set | 49,500 ₹99,000 | 50,000 ₹1 L |
| 1.02 | Overhauling of feed check valve including machining of valve seats and refabrication of valve spindle | 2 | set | 6,200 ₹12,400 | 6,400 ₹12,800 |
| 1.03 | Overhauling of Main Steam stop valve including thorough dismantling and refabrication of valve spindle and bush.Machining of valve main seat and base seat for making it leakproof | 2 | set | 12,500 ₹25,000 | 12,500 ₹25,000 |
| 1.04 | Overhauling of Gauge Column Cocks and replacement of inner spares and refitting to boiler with new gauge glass, rubber cones and rings | 2 | set | 6,700 ₹13,400 | 6,600 ₹13,200 |
| 1.05 | Overhauling of Blow down valve including high pressure test of the valve to withstand pressure of 2 times of boiler working pressure | 2 | set | 5,500 ₹11,000 | 5,600 ₹11,200 |
| 1.06 | The Bottom Manhole Studs to be replaced with new one | 2 | set | 3,500 ₹7,000 | 3,500 ₹7,000 |
| 1.07 | All the Adamson Ring joints of the boiler are to be caulked | 2 | set | 6,000 ₹12,000 | 6,500 ₹13,000 |
| 1.08 | Positions of reduced thickness to be built up by electric arc welding with pre post heat treatment and dressed smooth to original shape and thickness | 2 | set | 26,500 ₹53,000 | 27,000 ₹54,000 |
| 1.09 | Supply and fitting of new IBR quality fusible plugs (2 nos.) in original manner with IBR test certificate and approval from Boiler inspector | 2 | set | 8,400 ₹16,800 | 8,500 ₹17,000 |
Updated dates
Tender Value
₹5.0 L
EMD Value
₹6,400
Closing Date
18 Mar 2026, 4:00 pmClosed
General Manager Satgram-Sripur Area
Office of the General Manager, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Certification of Lancashire Boiler No WBL 4490 and WBL 4491 including cleaning, dismantling, repairing and Hydraulic Test at Ningah Colliery under Satgram-Sripur Area
2026_ECL_355476_1
ECL/SSA/GM/E M/E-NIT/2025-26/149 dt 02.03.2026
Open Tender
Miscellaneous Works
7 days
Ningah Colliery under SSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,400
23 Mar 2026
5 Mar 2026
20 Mar 2026
5 Mar 2026
18 Mar 2026
5 Mar 2026
5 Mar 2026 - 9 Mar 2026
Item description
Cleaning of Lancashire boiler
Overhauling of feed check valve including machining of valve seats and refabrication of valve spindle
Overhauling of Main Steam stop valve including thorough dismantling and refabrication of valve spindle and bush.Machining of valve main seat and base seat for making it leakproof
Overhauling of Gauge Column Cocks and replacement of inner spares and refitting to boiler with new gauge glass, rubber cones and rings
Overhauling of Blow down valve including high pressure test of the valve to withstand pressure of 2 times of boiler working pressure
The Bottom Manhole Studs to be replaced with new one
All the Adamson Ring joints of the boiler are to be caulked
Positions of reduced thickness to be built up by electric arc welding with pre post heat treatment and dressed smooth to original shape and thickness
Supply and fitting of new IBR quality fusible plugs (2 nos.) in original manner with IBR test certificate and approval from Boiler inspector
Cutting out of old adaptors 2 nos, fabrication of two new adaptors from HT bar and then welding the same in the boiler
Staggered and isolated pitting observed at 3 to 6 o clock position of the boiler front end plate, near mud hole during inspection. The position where the thickness gauging was carried are to be built up by electric arc welding with pre post heat treatment and dressed smooth to original shape and thickness
Complete preparation for hydraulic test by blanking of all the mounting pads of the boiler and fitting of 1 inch wheel valve
Pressure test of the boiler at 1.5 times of the working pressure in presence of Dy Director of Boilers, WB.After successful testing and certification, the boiler is to be commissioned for firing
Profit
Total impact of GST for the purpose of CTC
Statutory boiler dry and hydraulic Inspection fees and arrangement of inspection by Dy Director of boilers
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 0.78 MB
BOQ_368318.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid