Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹19.5 L+₹1,663.55 (0.09%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rajakannan L1 | V.Maheswaran L2 |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavation and depositing on bank with initial leads of 10m and lifts of 2m In hard stiff clay, stiff black cotton soil, hard red earth,shale murrams, gravel stoney earth and earth muds with 50% fair sized boulders and hard gravelly soils as per SS 20 B | 47.43 | M3 | 263.5 ₹12,497.81 Lowest | 275 ₹13,043.25 |
| 1.02 | Collection and supply of Conveyed Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 29.25 | M3 | 233.5 ₹6,829.88 Lowest | 243 ₹7,107.75 |
| 1.03 | Plain Cement concrete in mix 1:4:8 using 40 mm HBG metal including cost and conveyance of all materials and all labour charges - 10 m3 | 13.8 | M3 | 5,568.4 ₹76,843.92 | 5,568 ₹76,838.4 Lowest |
| 1.04 | Brick work in c.m 1:5 mix using country bricks ground moulded of size 23x11x7 cu.cm including cost & conveyance of all materials to site and all labour charges etc., complete. | 29.53 | M3 | 6,136.8 ₹1,81,219.7 Lowest | 6,137 ₹1,81,225.61 |
| 1.05 | Supplying and erecting centering for column footing plinth beam, Grade beam including strutting etc., complete complying with std. Specifications and as directed. BGL | 71.91 | m2 | 547.5 ₹39,370.73 Lowest | 548 ₹39,406.68 |
| 1.06 | Supplying and erecting centering for column footing plinth beam, Grade beam including strutting etc., complete complying with std. Specifications and as directed. AGL | 160.48 | m2 | 1,095 ₹1,75,725.6 Lowest | 1,095 ₹1,75,725.6 Lowest |
| 1.07 | Supplying ,fabricating and placing in position of MS/RTS Rods and all RCC works including cost of GI binding wire etc.,complete. | 3,800 | m3 | 91.85 ₹3,49,030 Lowest | 92 ₹3,49,600 |
| 1.08 | R.C.C 1:1;2:3 using20 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification | 33.32 | Kgs | 9,458.06 ₹3,15,142.56 | 9,458 ₹3,15,140.56 Lowest |
| 1.09 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 58.5 | m2 | 183.3 ₹10,723.05 | 183 ₹10,705.5 Lowest |
| 1.10 | Cost and supply of Ceramix tiles 30x30x6mm cm 1:2 mix inculding all cost and convenyance all labour charges all etc. | 65.61 | m2 | 1,069.8 ₹70,189.58 Lowest | 1,070 ₹70,202.7 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
13 Nov 2025, 3:00 pmClosed
Block Development Officer (VP)
Panchayat Union Office, Periyakulam
Construction of Mini Community Hall at Kattunaickar Street (ST Households) in Endapuli at Endapuli Panchayat of Periyakulam Block under 6TH SFC FRA (OMDGF) - 2023 - 2024
2025_RDTN_621463_1
1/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Periyakulam
As per tender documents
4 documents required · 4 mandatory
₹0
₹20,000
18 Nov 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tendernotice_2.pdf
PDF • 0.70 MB
BOQ_743094.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .