| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.3 L+₹15,359.66 (4.91%)Rejected-Finance 0 STATION ROAD PARICHHA PARICHHA NEAR BANK OF INDIA JHANSI UTTAR PRADESH 284305 | JHANSI | UTTAR PRADESH | 284305 | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.3 L+₹21,623.19 (6.91%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S Kamlesh Kumar Singh L1 | M/S SINGH CONSTRUCTION L2 | Pradeep Kumar Singh L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in making Ramp/approach road/diversion including carriage of earth by means of transport and all labour, T&P required to complete the job with proper manual ramming and compaction to prepare earthen surface for immediate transportation use of road. | 343 | Cum | 70 ₹24,010 Lowest | 85.5 ₹29,326.5 | 80 ₹27,440 |
| 2.00 | Demolishing Lime concrete Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge. | 5.29 | Cum | 700 ₹3,703 Lowest | 720 ₹3,808.8 | 740 ₹3,914.6 |
| 3.00 | Demolishing brick work in lime mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge. | 18.81 | Cum | 500 ₹9,405 Lowest | 530 ₹9,969.3 | 500 ₹9,405 Lowest |
| 4.00 | Supplying, Laying and fixing of RCC pipe NP3 (1000 mm) in position in alignment excluding excavation back filling and cost of materials. | 10 | R.M | 5,000 ₹50,000 Lowest | 5,150 ₹51,500 | 5,000 ₹50,000 Lowest |
| 5.00 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site. | 42 | HR | 50 ₹2,100 Lowest | 243.35 ₹10,220.7 | 240 ₹10,080 |
| 6.00 | Laying Reinforced Cement Concrete (M25 A20) in foundation, wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete. | 2.79 | Cum | 8,000 ₹22,320 | 7,715 ₹21,524.85 Lowest | 8,000 ₹22,320 |
| 7.00 | Bending, Binding, Cutting and Placing in reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT. | 0.35 | MT | 90,000 ₹31,500 | 71,500 ₹25,025 Lowest | 75,050 ₹26,267.5 |
| 8.00 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. | 25.68 | Sqm | 800 ₹20,544 Lowest | 885 ₹22,726.8 | 820 ₹21,057.6 |
| 9.00 | Providing & Fixing 75 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing. | 1.2 | R.M | 500 ₹600 Lowest | 1,365 ₹1,638 | 1,200 ₹1,440 |
| 10.00 | Providing & Fixing Bitumen Joint filer Board For Expansion Joints. | 2.1 | Sqm | 405 ₹850.5 | 358.75 ₹753.38 | 340 ₹714 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,420
Closing Date
26 Nov 2025, 1:00 pmClosed
Executive Engineer
Executive Engineer, Sharda Sahayak Division-28, Haidergarh, Barabanki.
Repairing of Damage VRB at Km. 10.865 on Daulatpur Dy.
2025_UPIDC_1092601_1
04/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
30 days
Haidergarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹7,420
29 May 2026
21 Nov 2025
26 Nov 2025
21 Nov 2025
26 Nov 2025
21 Nov 2025
Amount
Earth Work in making Ramp/approach road/diversion including carriage of earth by means of transport and all labour, T&P required to complete the job with proper manual ramming and compaction to prepare earthen surface for immediate transportation use of road.
Demolishing Lime concrete Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge.
Demolishing brick work in lime mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge.
Supplying, Laying and fixing of RCC pipe NP3 (1000 mm) in position in alignment excluding excavation back filling and cost of materials.
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.
Laying Reinforced Cement Concrete (M25 A20) in foundation, wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete.
Bending, Binding, Cutting and Placing in reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.
Providing & Fixing 75 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing.
Providing & Fixing Bitumen Joint filer Board For Expansion Joints.
Class 150 Brick work in 1:3 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.
12.5 mm thick cement plaster in 1:2 cement morter includin all cost off labour, material, T&P etc complete.
ONE PRIMING COAT AND TWO COAT OF OIL DISTEMPER ON NEW WORK INCLD SUPPLY OF ALL MATERIAL, LABOUR AND T & P ETC. REQUIRED FOR PROPER COMPLETION OF WORK.
Laying Plain Cement Concrete (M-15) in foundation, in bed slab 1:2:4 with stone grit including cost of material, labour, T&p etc, complete.
Earth work in restoring canal section or drain section and dismentalling of diversion after construction of pacca work including all initial lead and lift, all labour and T&P with proper dressing to profile per Cum.
STONE WHEEL GUARD 1:2:4 RATIO SIZE 1.00X0.23X0.23M
M/S SINGH CONSTRUCTION (BID ID -5692132)
Pradeep Kumar Singh (BID ID -5702849)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BID04LOT01.pdf
Tender Documents • 1.49 MB
BOQ_2007402.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .