| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 LRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹3.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.3 LRejected-Finance | ₹3.3 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S Kamlesh Kumar Singh L1 | M/S SINGH CONSTRUCTION L2 | Pradeep Kumar Singh L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in making Ramp/approach road/diversion including carriage of earth by means of transport and all labour, T&P required to complete the job with proper manual ramming and compaction to prepare earthen surface for immediate transportation use of road. | 343 | Cum | 70 ₹24,010 | 85.5 ₹29,326.50 | 80 ₹27,440 |
| 2.00 | Demolishing Lime concrete Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge. | 5.29 | Cum | 700 ₹3,703 | 720 ₹3,808.80 | 740 ₹3,914.60 |
| 3.00 | Demolishing brick work in lime mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge. | 18.81 | Cum | 500 ₹9,405 | 530 ₹9,969.30 | 500 ₹9,405 |
| 4.00 | Supplying, Laying and fixing of RCC pipe NP3 (1000 mm) in position in alignment excluding excavation back filling and cost of materials. | 10 | R.M | 5,000 ₹50,000 | 5,150 ₹51,500 | 5,000 ₹50,000 |
| 5.00 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site. | 42 | HR | 50 ₹2,100 | 243.35 ₹10,220.70 | 240 ₹10,080 |
| 6.00 | Laying Reinforced Cement Concrete (M25 A20) in foundation, wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete. | 2.79 | Cum | 8,000 ₹22,320 | 7,715 ₹21,524.85 | 8,000 ₹22,320 |
| 7.00 | Bending, Binding, Cutting and Placing in reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT. | 0.35 | MT | 90,000 ₹31,500 | 71,500 ₹25,025 | 75,050 ₹26,267.50 |
| 8.00 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. | 25.68 | Sqm | 800 ₹20,544 | 885 ₹22,726.80 | 820 ₹21,057.60 |
| 9.00 | Providing & Fixing 75 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing. | 1.2 | R.M | 500 ₹600 | 1,365 ₹1,638 | 1,200 ₹1,440 |
| 10.00 | Providing & Fixing Bitumen Joint filer Board For Expansion Joints. | 2.1 | Sqm | 405 ₹850.50 | 358.75 ₹753.38 | 340 ₹714 |
Tender Value
Refer Docs
EMD Value
₹7,420
Closing Date
26 Nov 2025, 1:00 pmClosed
Executive Engineer
Executive Engineer, Sharda Sahayak Division-28, Haidergarh, Barabanki.
Repairing of Damage VRB at Km. 10.865 on Daulatpur Dy.
2025_UPIDC_1092601_1
04/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Haidergarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹7,420
29 May 2026
21 Nov 2025
26 Nov 2025
21 Nov 2025
26 Nov 2025
21 Nov 2025
Amount
Earth Work in making Ramp/approach road/diversion including carriage of earth by means of transport and all labour, T&P required to complete the job with proper manual ramming and compaction to prepare earthen surface for immediate transportation use of road.
Demolishing Lime concrete Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge.
Demolishing brick work in lime mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in-charge.
Supplying, Laying and fixing of RCC pipe NP3 (1000 mm) in position in alignment excluding excavation back filling and cost of materials.
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.
Laying Reinforced Cement Concrete (M25 A20) in foundation, wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete.
Bending, Binding, Cutting and Placing in reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.
Providing & Fixing 75 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing.
Providing & Fixing Bitumen Joint filer Board For Expansion Joints.
Class 150 Brick work in 1:3 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.
12.5 mm thick cement plaster in 1:2 cement morter includin all cost off labour, material, T&P etc complete.
ONE PRIMING COAT AND TWO COAT OF OIL DISTEMPER ON NEW WORK INCLD SUPPLY OF ALL MATERIAL, LABOUR AND T & P ETC. REQUIRED FOR PROPER COMPLETION OF WORK.
Laying Plain Cement Concrete (M-15) in foundation, in bed slab 1:2:4 with stone grit including cost of material, labour, T&p etc, complete.
Earth work in restoring canal section or drain section and dismentalling of diversion after construction of pacca work including all initial lead and lift, all labour and T&P with proper dressing to profile per Cum.
STONE WHEEL GUARD 1:2:4 RATIO SIZE 1.00X0.23X0.23M
M/S SINGH CONSTRUCTION (BID ID -5692132)
Pradeep Kumar Singh (BID ID -5702849)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BID04LOT01.pdf
Tender Documents • 1.49 MB
BOQ_2007402.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid