Loading…
Loading…
Tender Value
₹3.4 Cr
EMD Value
₹8.0 L
Closing Date
23 Oct 2026, 11:00 am
Pravin Kumar
CE RGTPP Khedar Hisar
BMC of Boiler, FAN, RAPH, DUCTING and ESP
2026_HBC_550163_1
2026A7E010E0 6C16 49EE BBB6 FA7BF60E82D2712PGC
Open Tender
Civil Works
Works
820 days
KHEDAR
As per PQR of NIT
2 documents required · 2 mandatory
₹1,180
₹8.0 L
Yes
25 Sept 2026
25 Sept 2026
27 Oct 2026
25 Sept 2026
23 Oct 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | For Scope of work under Part-A, for First Year :
Lump Sum Monthly Charges for both Units-I&II for Main Scope of work under Part-A (i.e. work of Boiler Pressure Parts, Boiler Rotary Parts & Common Activities as Per Scope of Work) | 12 | Months | - | - |
| 1.01 | For Scope of work under Part-B, for First Year (from 1.02 to 1.85) | - | - | - | - |
| 1.02 | Mobilization & attending the boiler tube leakage / preventive maintenance of pressure parts tubes in boiler but excluding Platen Super Heater area, Divisional Super Heater area, Platen Re Heater area, Finish Reheater area, steam cooled SH spacer tubes and liquid cooled positioning tubes. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. HP joints.
Note:-
(i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints.
(ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage.
(i) Minor scaffolding (i.e. up to using 5 nos. jalies for height of 1 mtr from base will be in scope of contractor & no separate payment will be made.
(ii) Attending tube leakages in radiant re-heater area from outside of furnace shall also be covered under this head. | 14 | Each | - | - |
| 1.03 | Mobilization & attending the boiler tube leakage / preventive maintenance of Platen Re Heater area. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. HP joints.
Note:-
(i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints.
(ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage.
(iii) Removal and re-installation of flexible connectors shall also be in the scope of contractor.
(iv) Scaffolding as per site requirement for attending the tube leakages in above mentioned area will be in scope of contractor & no separate payment will be made. | 4 | Each | - | - |
| 1.04 | Mobilization & attending the boiler tube leakage / preventive maintenance of Final Re Heater area. It includes cutting, welding, fit-up, grinding and replacement of tube of all sizes and thickness involving up-to 10 nos. joints.
Note:-
(i) 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints.
(ii) Through inspection for identification of failed tubes & inspection of adjoining area in vicinity of failed tube(s) will be in the scope of work of contractor. To identify and attend the tubes found damaged & eroded tubes due to secondary damage.
(iii) Removal and re-installation of flexible connectors shall also be in the scope of contractor.
(iv) Scaffolding as per site requirement for attending the tube leakages in above mentioned area will be in scope of contractor & no separate payment will be made.
(v) Stress relieving, Pre & Post Heat treatment of joints as per procedure shall be in the scope of contractor. | 4 | Each | - | - |
| 1.05 | Erection of boiler maintenance platform/ sky-climber/jhoola for attending tube leakages in Divisional SH panels, Platen SH panels, Panel RH tubes (if attended from inside the first pass of furnace), SH steam cooled spacer tubes and liquid cooled positioning tubes involving up-to 10 nos. HP joints. 3 Nos. Metal Built-ups each having length up-to 100 mm will be considered as one joint and each window type joint will be considered as equivalent to 3 normal joints. | 2 | Each | - | - |
| 1.06 | Attending tube leakages in pent house portions, connecting tubes of all pendant SH and RH panels, radiant roof tubes, any other miscellaneous pipeline as well as removal and re-fixing of hand hole caps of headers | 2 | Each | - | - |
| 1.07 | Radiography of up-to 10 nos. HP joints. Engagement of a qualified Level-II NDT expert who could interpret RT films correctly along with RT source/camera of appropriate strength shall also be in the scope of the contractor. NDT expert shall submit a detailed report clearly mentioning whether the welding joint is satisfactory or not. | 8 | Each visit | - | - |
| 1.08 | Carrying out Radiography of HP joints in addition to 10 nos. joints mentioned at Sr. No. 6 above. | 50 | Each joint | - | - |
| 1.09 | Carrying out HP joint in addition to 10 nos. joints mentioned at Sr. No. 1, 2, 3, 4 & 5 to above in boiler. It includes cutting, welding, fit-up, grinding and welding of one no. joint of tube of all sizes and any thickness of boiler in area covered under Sr. No. 1, 2, 3, 4 & 5 above. | 50 | Each joint | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_629933.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .