Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | ₹5.9 L | L1 | Accepted-AOC l1 |
| 2 | L2₹5.9 LRejected-Finance | ₹5.9 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | DEVA CHRISTIN RAJA L1 | S.Ramasubramanian L2 |
|---|---|---|---|---|---|
| 1.00Construction of Drainage at Govindhaperi Panchayat Office street South to North in Govindhaperi Panchayat. ,Kadayam Panchayat Union Under 15th CFC (D.Pt ) - 2025 - 2026 | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 84.94 | cum | 197 ₹16,733.18 | 200 ₹16,988 |
| 3.00 | Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete. | 25.66 | cum | 5,376 ₹1.4 L | 5,400 ₹1.4 L |
| 4.00 | Centering charges for all concrete works including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete. | 214.37 | Sqm | 547.5 ₹1.2 L | 550 ₹1.2 L |
| 5.00 | Cement concrete 1:3:6 mix using 20m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete. | 31.56 | cum | 6,128 ₹1.9 L | 6,150 ₹1.9 L |
| 6.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 130.32 | Kg | 91.5 ₹11,924.28 | 93 ₹12,119.76 |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | 0.79 | cum | 8,985 ₹7,098.15 | 8,986 ₹7,098.94 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 56.85 | Sqm | 280 ₹15,918 | 285 ₹16,202.25 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 90,070 ₹90,070 | 90,535 ₹90,535 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
14 Feb 2026, 4:30 pmClosed
BDO(B.Pt), Kadayam.
BDO(B.Pt), Kadayam.
Construction of Drainage at Govindhaperi Panchayat Office street South to North in Govindhaperi Panchayat.
2026_RDTN_653490_2
BDKDM/279/2025-A2 DATE 05-02-2026
Open Tender
Civil Works - Buildings
KADAYAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
24 Feb 2026
9 Feb 2026
14 Feb 2026
9 Feb 2026
14 Feb 2026
9 Feb 2026
Construction of Drainage at Govindhaperi Panchayat Office street South to North in Govindhaperi Panchayat. ,Kadayam Panchayat Union Under 15th CFC (D.Pt ) - 2025 - 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Centering charges for all concrete works including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Cement concrete 1:3:6 mix using 20m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_783679.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_783679.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid