Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.9 LAdmitted-Finance VILLAGE THOLANG P O MALANG TEH KEYLONG DISTT LAHAUL SPITI H P 175132 | LAHUL AND SPITI | HIMACHAL PRADESH | 175132 | -26.55% | ₹12.9 L | L1 | Admitted-Finance |
| 2 | L2₹14.4 LAdmitted-Finance | -17.85% | ₹14.4 L | L2 | Admitted-Finance |
| 3 | L3₹15.3 LAdmitted-Finance | -12.70% | ₹15.3 L | L3 | Admitted-Finance |
| 4 | L4₹17.3 LAdmitted-Finance | -1.50% | ₹17.3 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical The Bidder has been non responsive |
Tender Value
₹17.6 L
EMD Value
₹35,120
Closing Date
25 May 2026, 4:00 pmClosed
Er. Mohd Qasim
Executive Engineer PWD R and B Division Billawar
Please refer in BOQ
2026_PWDJK_310228_4
e-NIT No 18 of 2026-27 dated 18-05-2026
Open Tender
Civil Works
270 days
Billawar
Please refer Tender documents
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division Billawar
₹35,120
3 Jun 2026
18 May 2026
25 May 2026
18 May 2026
25 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1mtr. | ||||||
| 1.1 | All kinds of soil. | 30.56 | CUM | 479.3 | ₹14,647.41 | 35.06 |
| 1.2 | Ordinary. | 5.39 | CUM | 924.8 | ₹4,984.67 | 12.04 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.A) All Kind of soil. | 28.32 | Cum | 592.9 | ₹16,790.93 | - |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | ||||||
| 3.1 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 7.55 | cum | 5,202.9 | ₹39,281.9 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering,shuttering, finishing and reinforcement. All work upto plinth level.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.8 | Cum | 7,788.4 | ₹29,595.92 | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) with 20% boulders. | 32.82 | Cum | 4,774.46 | ₹1,56,697.78 | - |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :A)Cement mortar 1:6( 1 cement : 6 coarse sand) | 20.61 | CUM | 7,571.55 | ₹1,56,049.65 | - |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 20.61 | CUM | 1,455.65 | ₹30,000.95 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_1003806.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid