Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹14.5 LAccepted-AOC 35 17 A 21 MADI LANE BACK SIDE SALEM CAMP METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | L 1 | Accepted-AOC L 1 | |
| 2 | L 2₹14.8 L+₹29,754 (2.06%)Rejected-Finance NO 2 322 MELA STREET EPPODUMVENDRAN 628 712 TUTICORIN DISTRICT | EPPODUMVENDRAN | TUTICORIN | TAMIL NADU | 628712 | L 2 | Rejected-Finance L 2 | |
| 3 | L 3₹14.8 L+₹37,570 (2.60%)Rejected-Finance 1 20 E 17 KOILPILLAI NAGAR III RD STREET TUTICORIN 628 006 | TUTICORIN | TUTICORIN | TAMIL NADU | 628006 | L 3 | Rejected-Finance L 3 | |
| 4 | L 4₹16.8 L+₹2.3 L (16.1%)Rejected-Finance | L 4 | Rejected-Finance L 4 | |
| 5 | L 5₹20.2 L+₹5.8 L (40.0%)Rejected-Finance 39 3 PERUMALPUARM TUTICORIN 628003 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628003 | L 5 | Rejected-Finance L 5 |
Tender Value
Refer Docs
EMD Value
₹42,144
Closing Date
7 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
Chief Engineer, Civil Engineering Department, VOC Port Authority, Tuticorin - 628004.
Cleaning the Over Head Tank, Under Ground Reservoir, Ground Level Reservoir in beach water tank and oyster water tank complex and water tanks in the Public buildings and Residential quarters at harbour estate for a period of two years
2022_VOCPT_120396_1
08CE/RCM BMR/2022-23
Open Tender
Civil Works - Water Works
Works
730 days
VOC Port Authority
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹42,144
19 Aug 2022
27 Jun 2022
8 Jul 2022
27 Jun 2022
7 Jul 2022
27 Jun 2022
Amount
Cleaning the Over head tank (OHT) @ Beach Water Tank of capacity 1,25,000 Gallon and OHT @ Oyster Tank of capacity 80,000 Gallon at a total height of 29m each and Cleaning the Under Ground Reservoir (UGR) @ Beach Water tank of capacity 1,25,000 Gallon and UGR @ Oyster Tank of capacity 1,25,000 Gallon and Cleaning the Ground Level Reservoir (GLR) @ Beach water tank of capacity 3 x 2,20,000 gallon capacity & GLR @ Oyster tank of capacity 2 x 2,20,000 gallon. The cost including dewatering the tank using pump, cleaning materials like bleaching powder, washing soda,broom sticks and all other tools & plants, one coat of white wash for an area of about 2,050 Sqm. in the interior walls of OHT's, UGR's & GLR's of both Beach water tank & Oyster water tank usingshell lime etc., complete to the satisfaction and as directed by the departmental officers. Note : Cleaning of the said water tanks should be done at an interval of Four Months.
Cleaning the Water Tanks in Port buildings such as Admin. Block 10,000Lit. Capacity - 2 Nos., School Buildings 2,000 Lit. capacity - 2 Nos. and in Guest House,MMD, CDC, Stores, Maintenance Sub Division, Electrical Sub Division, New Information Centre,New Shopping Complex etc., 1,000 Lit. - 9 Nos., and Cleaning the service ramp collection pot at Auto yard - 2 Nos., and over all Over head tanks - 66 Nos., The cost including dewatering the tank, cleaning materials like bleaching powder, washing soda, broom sticks and all other tools & plants, etc., complete to the satisfaction and as directed by the departmental officers. Note : Cleaning of the said water tanks should be done at an interval of Two Months.
Cleaning the Over head tank (OHT) of capacity 1,000 Lit. Masonry / PVC water tanks - 772 Nos. in the Residential Quarters from Type - I to Type -VII, CISF Quarters for a period of Two years. The cost including dewatering the tank, labour, cleaning materials like bleaching powder, washing soda, broom sticks and all other tools & plants, Painting the last date of cleaning in the wall surface with Synthetic Enamel paint as "Cleaned on ..............." for verification etc., complete to the satisfaction and as directed by the departmental officers. Note : Cleaning of the said water tanks should be done at an interval of Three Months.
SRI VINAYAGA CONSTRUCTION
SURYA ENTERPRISES
S. KUNJAN
SUBA CONSTRUCTION
stage.html
html • 0.05 MB
techsummary_131292.pdf
PDF • 0.14 MB
finsummary_131292.pdf
PDF • 0.14 MB
LOA.pdf
PDF • 0.71 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .