| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | ₹2.0 L | L1 | Accepted-Finance Ist Lowest bidder |
| 2 | L2₹2.0 L+₹1,780 (0.89%)Accepted-Finance | ₹2.0 L+₹1,780 (0.89%) | L2 | Accepted-Finance IInd Lowest bidder |
| 3 | L3₹2.4 L+₹41,930 (21.0%)Accepted-Finance | ₹2.4 L+₹41,930 (21.0%) | L3 | Accepted-Finance IIIrd Lowest bidder |
| 4 | L4₹2.8 L+₹76,109 (38.1%)Accepted-Finance | ₹2.8 L+₹76,109 (38.1%) | L4 | Accepted-Finance IV Lowest bidder |
| 5 | L5₹2.8 L+₹80,380 (40.3%)Accepted-Finance | ₹2.8 L+₹80,380 (40.3%) | L5 | Accepted-Finance V Lowest bidder |
| Sl No | Description | Qty | Unit | SURENDRA KUMAR CONTRACTOR L1 | M/s Ayushi Enterprises L4 | M/S SONU KUMAR CONTRACTOR L2 | SAINI ASSOCIATES L5 | RAJ ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Detail of Work | ||||||||
| 1.01 | Safety cartage of PCC /SP 55 Poles from ESC, SRE/J.E. Store to the site of work at various sites including loading & unloading at both ends (Distance 0 to 50 K.M.) | 45 | No. | 1,400 ₹63,000 | 1,390 ₹62,550 | 1,000 ₹45,000 Lowest | 1,400 ₹63,000 | 1,200 ₹54,000 |
| 1.02 | Safety cartage of other lines material (Except PCC Poles) from ESC, SRE/J.E. Store to the site of work at various sites including loading & unloading at both ends (Distance 0 to 50 K.M.) | 1 | Ton. | 1,500 ₹1,500 Lowest | 2,000 ₹2,000 | 1,500 ₹1,500 Lowest | 2,000 ₹2,000 | 1,500 ₹1,500 Lowest |
| 1.03 | Safety cartage of 63/25 KVA T/F from ESC, SRE, to the site of work at various sites including loading & unloading at both ends (Distance approx. 50 K.M.) | 3 | No. | 3,000 ₹9,000 | 2,600 ₹7,800 | 3,000 ₹9,000 | 2,800 ₹8,400 | 2,500 ₹7,500 Lowest |
| 1.04 | Laying of LT PVC cable 3.5x150 sq. mm. from T/F to D/P with complete fitting as per respo specification. | 40 | Mtr. | 40 ₹1,600 | 25 ₹1,000 | 20 ₹800 Lowest | 25 ₹1,000 | 24 ₹960 |
| 1.05 | Safely installation of 63/25KV T/F on the plinth with proper alignment and Complete fitting including making connection and commissioning. | 3 | No. | 1,500 ₹4,500 Lowest | 2,600 ₹7,800 | 5,000 ₹15,000 | 2,800 ₹8,400 | 2,500 ₹7,500 |
| 1.06 | Laying charges of 11 kv XLPE cable. | 80 | Mtr. | 110 ₹8,800 | 78 ₹6,240 | 60 ₹4,800 Lowest | 80 ₹6,400 | 70 ₹5,600 |
| 1.07 | Making of 11 KV XLPE Heat shrinkable od/ indoor jointing kits. | 4 | No. | 1,000 ₹4,000 | 1,000 ₹4,000 | 2,200 ₹8,800 | 1,000 ₹4,000 | 800 ₹3,200 Lowest |
| 1.08 | Safely installation of 11kv Fuse set with proper alignment and Complete fitting including making connection and commissioning. | 1 | No. | 600 ₹600 Lowest | 1,225 ₹1,225 | 1,600 ₹1,600 | 1,250 ₹1,250 | 1,200 ₹1,200 |
| 1.09 | Safely installation of CT PT unit on the plinth with proper alignment and Complete fitting including making connection and commissioning. | 1 | No. | 2,000 ₹2,000 | 1,225 ₹1,225 | 2,000 ₹2,000 | 1,250 ₹1,250 | 1,200 ₹1,200 Lowest |
Tender Value
₹2.4 L
EMD Value
₹2,500
Closing Date
16 Jun 2026, 12:00 pmClosed
Superintending Engineer
EDC I Saharanpur
Full deposit work in the area of EDD Deoband
2026_PVVNL_1156381_1
22/W/EDC-I/SRE/2026-27
Open Tender
Electrical Works
Lump-sum
45 days
Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
SE EDC I SRE
₹2,500
Yes
14 Aug 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detail of Work | |||||
| 1.01 | Safety cartage of PCC /SP 55 Poles from ESC, SRE/J.E. Store to the site of work at various sites including loading & unloading at both ends (Distance 0 to 50 K.M.) | 45 | No. | - | - |
| 1.02 | Safety cartage of other lines material (Except PCC Poles) from ESC, SRE/J.E. Store to the site of work at various sites including loading & unloading at both ends (Distance 0 to 50 K.M.) | 1 | Ton. | - | - |
| 1.03 | Safety cartage of 63/25 KVA T/F from ESC, SRE, to the site of work at various sites including loading & unloading at both ends (Distance approx. 50 K.M.) | 3 | No. | - | - |
| 1.04 | Laying of LT PVC cable 3.5x150 sq. mm. from T/F to D/P with complete fitting as per respo specification. | 40 | Mtr. | - | - |
| 1.05 | Safely installation of 63/25KV T/F on the plinth with proper alignment and Complete fitting including making connection and commissioning. | 3 | No. | - | - |
| 1.06 | Laying charges of 11 kv XLPE cable. | 80 | Mtr. | - | - |
| 1.07 | Making of 11 KV XLPE Heat shrinkable od/ indoor jointing kits. | 4 | No. | - | - |
| 1.08 | Safely installation of 11kv Fuse set with proper alignment and Complete fitting including making connection and commissioning. | 1 | No. | - | - |
| 1.09 | Safely installation of CT PT unit on the plinth with proper alignment and Complete fitting including making connection and commissioning. | 1 | No. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
22w26-27.pdf
Tender Documents • 0.86 MB
BOQ_2166796.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .