Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.3 L
EMD Value
₹8,620
Closing Date
7 Feb 2020, 6:00 pmClosed
XEN R AND B DIVISION UDHAMPUR
XEN R AND B DIVISION UDHAMPUR
BOQ
2020_PWDJK_91583_3
ENIT No. 102 of 2019-20 Dated 30-01-2020
Open Tender
Civil Works
Item Rate
45 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN R AND B DIVISION UDHAMPUR
₹8,620
Yes
12 Feb 2020
31 Jan 2020
8 Feb 2020
31 Jan 2020
7 Feb 2020
31 Jan 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width & for shafts, wells, cesspits & the like not exceeding 10 sqm on plan, depth upto 1.5 m including disposal of excavated earth with all leads & lift complete, disposed earth is to be levelled & neatly dressed in all kind of soil
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:5:10 (1 cement : 5 coarse sand : 10 graded stone agg. 40 mm nominal size) Crushed.incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed with 20% plums incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Centering & shuttering incl. strutting , propping etc. and removal of form work for:-
Foundations, footings, bases of columns etc.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone agg.) but excl. the cost of nosing of steps etc. 50 mm thick with 20 mm nominal size stone aggregate incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Dumping stone behind R/ wall including cost of stones in horizontal or level. incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Filling available excavated earth (excl. rock) in trenches , plinth , sides of foundations etc in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead up to 50 m & lift up to 1.5 m.
Providing and laying non-pressure NP3 class (Light duty) 600 mm dia RCC H.P with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement :2 fine sand ) including testing of joints ,Cost of pipes etc complete ( Recovery rate of 8'-0" length pipe with collars @ Rs.3750+ Taxes each) if supplied by the department. incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
YUDHVIR SINGH
jag mohan singh govt. contractor
Rakesh Singh Jamwal
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .