| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | K SELVAMANI L1 | K Parameswaran L2 |
|---|---|---|---|---|---|
| 1.00Construction of Bathing Ghate in Thenpennai River at S. Mettupalayam Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation | 58.21 | cum | 258.5 ₹15,047.54 Lowest | 275 ₹16,007.75 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 17.1 | cum | 5,502.67 ₹94,095.67 Lowest | 5,700 ₹97,470 |
| 1.03 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, StairCase Waist Slablanding slab landing beam Canopy etc in all floors with all cross Bracings using mild steel sheets of size 90cm x 60cm and 10BG stiffened withmild steel angles of size 25mmx3mm for boarding laid over country wood joists of size 10cmx6.50cm spaced at about 90cm centre to centre and supported by Casurina props of 10cm to 13cm dia spaced at 75cm centre etc, complete and as directed. | 122.11 | sqm | 533.31 ₹65,122.02 Lowest | 550 ₹67,160.5 |
| 1.04 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 7.85 | cum | 9,074.98 ₹71,238.56 Lowest | 9,300 ₹73,005 |
| 1.05 | Supplying and Fabrication of Steel including cost conveyance of Steel , Binding wire and labour charges for cutting ,bending ,tieing in position as required | 0.3 | mt | 87,860.53 ₹26,358.16 Lowest | 89,500 ₹26,850 |
| 1.06 | Cement Concrete 1 : 3 : 6 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 55.08 | cum | 5,772.83 ₹3,17,967.32 Lowest | 5,900 ₹3,24,972 |
| 1.07 | Cement Concrete 1 : 2 : 4 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 10.82 | cum | 6,313.98 ₹68,317.3 Lowest | 6,500 ₹70,330 |
| 1.08 | Provision for Name board and Photographic charges charges | 1 | no | 490 ₹490 Lowest | 500 ₹500 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
24 Aug 2026, 3:00 pmClosed
BDO BP
BDO Office Kandamangalam
General Fund (BP) / 2026-2027
2026_RDTN_693024_1
General Fund (BP) / 2026-27
Open Tender
Civil Works
Works
90 days
Kandamangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,000
Yes
24 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Bathing Ghate in Thenpennai River at S. Mettupalayam Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation | 58.21 | cum | 263.78 | ₹15,354.63 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 17.1 | cum | 5,614.97 | ₹96,015.99 |
| 1.03 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, StairCase Waist Slablanding slab landing beam Canopy etc in all floors with all cross Bracings using mild steel sheets of size 90cm x 60cm and 10BG stiffened withmild steel angles of size 25mmx3mm for boarding laid over country wood joists of size 10cmx6.50cm spaced at about 90cm centre to centre and supported by Casurina props of 10cm to 13cm dia spaced at 75cm centre etc, complete and as directed. | 122.11 | sqm | 544.19 | ₹66,451.04 |
| 1.04 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 7.85 | cum | 9,260.18 | ₹72,692.41 |
| 1.05 | Supplying and Fabrication of Steel including cost conveyance of Steel , Binding wire and labour charges for cutting ,bending ,tieing in position as required | 0.3 | mt | 89,653.6 | ₹26,896.08 |
| 1.06 | Cement Concrete 1 : 3 : 6 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 55.08 | cum | 5,890.64 | ₹3,24,456.45 |
| 1.07 | Cement Concrete 1 : 2 : 4 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 10.82 | cum | 6,442.84 | ₹69,711.53 |
| 1.08 | Provision for Name board and Photographic charges charges | 1 | no | 500 | ₹500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_833266.xls
BOQ • 0.29 MB
Tender.pdf
Additional Documents • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].