Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.1 L
EMD Value
₹11,150
Closing Date
21 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Developments Officer (VP)
Union Office Kallal
Deepening,Desilting and Reconstruction of Sluice (2nos) at Keelapoongudi Kurukatti Kanmoi at Keelapoongudi Village in Keelapoongudi Panchayat
2023_RDTN_361258_1
Desilting/Keelapoongudi
Open Tender
Civil Works - Others
Item Rate
180 days
Union Office Kallal
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,150
Yes
21 Aug 2023
19 Aug 2023
21 Aug 2023
19 Aug 2023
21 Aug 2023
19 Aug 2023
Amount
Deepening,Desilting and ReConstruction of Sluice(2nos) at Keelapoongudi Kurukatti Kanmoi at Keelapoongudi Village in Keelapoongudi Panchayat
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Construction of Sluice
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Dismantling without daminging the near by streches if any clearing away and Carefully stacking materials useful for use for any thickness of plain cement Concrete complying with Standard specfification and as directed by the engineer in chear
Dismantling without daminging the near by streches if any clearing away and Carefully stacking materials useful for use for any thickness of plain cement Concrete complying with Standard specfification and as directed by the engineer in chear
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Supply and Laying,Jointing and Fixing in Position of RCC Hume Pipes of NP3 Class off 900mm Dia with Suitable collar including labour charges
Supply and Fixing cut stone roughly Dressed to Size all CM1:3 including labour charges
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Fabricating and Supply of Country wood plug size plug Size 40x40 cm
Refilling the Excavated Earth in all Leads
Construction of Retaining Wall
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A JOSEPH
stage.html
html • 0.02 MB
finance_430587.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .