| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.3 LAccepted-AOC | ₹13.3 L | 1 | Accepted-AOC Low |
| 2 | 2₹14.2 L+₹85,146.92 (6.38%)Rejected-AOC | ₹14.2 L+₹85,146.92 (6.38%) | 2 | Rejected-AOC High |
| Sl No | Description | Qty | Unit | SUDHAN CONSTRUCTION L1 | Paari construction L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring and strutting and balling out water wherever necessary refilling the sides of foundation with excavated earth in layers of not more complete complying with standard specification | 932 | M3 | 275.65 ₹2,56,905.8 Lowest | 285 ₹2,65,620 |
| 2.00 | Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification. | 932 | M3 | 47.91 ₹44,652.12 Lowest | 60 ₹55,920 |
| 3.00 | Supply and fixing of 90 mm PN-8 HDPE PIPES - PE 100 AS PER IS 4984/2016 from approved company and including cost and conveyance of materials and all etc complete complying with std specifications. (WD-M0207) | 2,300 | Rm | 317.89 ₹7,31,147 Lowest | 330 ₹7,59,000 |
| 4.00 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications.(WD-W0430) 90 mm PN-8 | 2,300 | Rm | 20.96 ₹48,208 Lowest | 25 ₹57,500 |
| 5.00 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers.(WD-W0618) | 192 | Nos | 203.98 ₹39,164.16 Lowest | 210 ₹40,320 |
| 6.00 | Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. | 2,300 | Rm | 93.32 ₹2,14,636 Lowest | 105 ₹2,41,500 |
Tender Value
₹15.4 L
EMD Value
₹30,800
Closing Date
22 May 2026, 3:00 pmClosed
Executive Officer
Kolathupalayam Town Panchayat
Extension of Pipe Line From D.Kumarapalyam Sump to NeelamburNagar in Kolathupalayam Town Panchayat
2026_DTP_676993_1
55/2025/A1-1
Open Tender
Pipe Laying Works
Works
Kolathupalayam Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹30,800
Yes
15 Aug 2026
14 May 2026
22 May 2026
14 May 2026
22 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring and strutting and balling out water wherever necessary refilling the sides of foundation with excavated earth in layers of not more complete complying with standard specification | 932 | M3 | - | - |
| 2 | Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification. | 932 | M3 | - | - |
| 3 | Supply and fixing of 90 mm PN-8 HDPE PIPES - PE 100 AS PER IS 4984/2016 from approved company and including cost and conveyance of materials and all etc complete complying with std specifications. (WD-M0207) | 2,300 | Rm | - | - |
| 4 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications.(WD-W0430) 90 mm PN-8 | 2,300 | Rm | - | - |
| 5 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers.(WD-W0618) | 192 | Nos | - | - |
| 6 | Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. | 2,300 | Rm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.28 MB
BOQ_813451.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .