Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 5 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹4.4 L
EMD Value
₹22,231
Closing Date
20 Mar 2026, 3:00 pmClosed
CHIEF ENGINEER
NNM
In Ward 06, Mohkampur, construction of road by drain and CC by upgrading Daksh Prajapati Marg to SBS Inter College and subsidiary lanes.
2026_NNMEE_1123981_55
1089/SNV-91T /2026
Open Tender
Civil Works
Fixed-rate
60 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
NAGAR AYUKT NAGAR NIGAM
₹22,231
16 Apr 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling reinforce cement concrete or reinforce brick work including staking of matrial as directed by the Engineer-in-charge within a distance of 60 meter (200 feet) | 8 | Cum | 1,000 | ₹8,000 |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). | 6.55 | Cum | 400 | ₹2,620 |
| 3 | Disposal of Malba from site upto 8 km. | 14.55 | Cum | 230.1 | ₹3,347.96 |
| 4 | Earth work filling including 12 k.m. lead | 41.02 | Cum | 307.5 | ₹12,613.65 |
| 5 | Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work. | 10.5 | Cum | 2,930 | ₹30,765 |
| 6 | M-150 brick work in 1:4 one cement and four course sand mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work. | 22.22 | Cum | 4,600 | ₹1,02,212 |
| 7 | 12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. | 104.5 | Sqm | 160 | ₹16,720 |
| 8 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 4.1 | Cum | 5,650 | ₹23,165 |
| 9 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. | 0.79 | Cum | 7,300 | ₹5,767 |
| 10 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 0.62 | Qtl | 8,728 | ₹5,412.67 |
stage.html
html • 0.05 MB
techsummary_2096776.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
55.pdf
Additional Documents • 0.16 MB
BOQ_2096776.xls
BOQ • 0.26 MB
NNMT1.pdf
Tender Documents • 6.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .