| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 CrAccepted-AOC C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹8.3 Cr Quoted ₹7.0 Cr | L1 | Accepted-AOC L1, Contract value including 18 percent GST |
| 2 | L2₹7.0 Cr+₹3.2 L (0.46%)Rejected-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹7.0 Cr+₹3.2 L (0.46%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.1 Cr+₹13.4 L (1.92%)Rejected-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.1 Cr+₹13.4 L (1.92%) | L3 | Rejected-AOC L3 |
| 4 | L4₹7.4 Cr+₹37.0 L (5.29%)Rejected-AOC | ₹7.4 Cr+₹37.0 L (5.29%) | L4 | Rejected-AOC L4 |
| 5 | L5₹7.5 Cr+₹52.8 L (7.55%)Rejected-AOC NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹7.5 Cr+₹52.8 L (7.55%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L3 | M/s Kaiser Construction Engineers and Contractor L4 | Shri Krishna Construction Projects Pvt Ltd L1 | ASHUTOSH KUMAR VERMA L6 | M/S UNITE ENTERPRISES L5 | ARVIND KUMAR SINGH L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in ordinary soil, excavation to be in the form of regular pits . Including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by Engineer-in- charge | 14,175 | Cum | 61.2 ₹8,67,510 | 60 ₹8,50,500 | 40 ₹5,67,000 Lowest | 60 ₹8,50,500 | 64.58 ₹9,15,421.5 | 50 ₹7,08,750 |
| 2.00 | Providing & Laying of Nylon crates (size 1.00Mx1.00Mx1.00M) with mesh size 20cmx20cm and weight not less then 300 gram at site filled with New PP/EC Bags with earth/ sand including all cost of material, labour and T&P etc | 14,097 | Nos | 643.88 ₹90,76,776.36 | 665 ₹93,74,505 | 500 ₹70,48,500 Lowest | 680 ₹95,85,960 | 679.48 ₹95,78,629.56 | 625 ₹88,10,625 |
| 3.00 | Providing and Laying GI Wire Crate 8 SWG GI wire size 1.0x1.0x1.0 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material ,labour,and T&P etc Complete | 3,588 | Nos | 3,006.45 ₹1,07,87,142.6 | 3,100 ₹1,11,22,800 | 3,000 ₹1,07,64,000 Lowest | 3,180 ₹1,14,09,840 | 3,172.69 ₹1,13,83,611.72 | 3,000 ₹1,07,64,000 Lowest |
| 4.00 | Providing and Laying GI Wire Crate 8 SWG GI wire size 3.00x1.50x1.00 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material ,labour,and T&P etc Complete | 3,662 | Nos | 12,112.46 ₹4,43,55,828.52 | 12,500 ₹4,57,75,000 | 12,300 ₹4,50,42,600 | 12,824 ₹4,69,61,488 | 12,782.21 ₹4,68,08,453.02 | 12,000 ₹4,39,44,000 Lowest |
| 5.00 | Supply ,Laying & Packing of cut/split stone 20 kg to 40 kg in spur/ stud including royality , Labour & T&P etc. Complete of work . | 2,407 | Cum | 2,565.56 ₹61,75,302.92 | 2,700 ₹64,98,900 | 2,700 ₹64,98,900 | 2,716 ₹65,37,412 | 2,707.42 ₹65,16,759.94 | 2,500 ₹60,17,500 Lowest |
Tender Value
₹8.4 Cr
EMD Value
₹16.8 L
Closing Date
12 Mar 2026, 3:00 pmClosed
Superintending Engineer Drainage Circle Gzb
Superintending Engineer Drainage Circle Gzb
Flood protection works near village Jagos situated on the left bank of Yamuna river in district Baghpat.
2026_UPIDC_1122007_1
07/SE/2025-26
Open Tender
Civil Works
Item Rate
90 days
baghpat
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹16.8 L
Meerut
14 Apr 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
10 Mar 2026
Earth work in cutting in ordinary soil, excavation to be in the form of regular pits . Including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by Engineer-in- charge
Providing & Laying of Nylon crates (size 1.00Mx1.00Mx1.00M) with mesh size 20cmx20cm and weight not less then 300 gram at site filled with New PP/EC Bags with earth/ sand including all cost of material, labour and T&P etc
Providing and Laying GI Wire Crate 8 SWG GI wire size 1.0x1.0x1.0 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material ,labour,and T&P etc Complete
Providing and Laying GI Wire Crate 8 SWG GI wire size 3.00x1.50x1.00 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material ,labour,and T&P etc Complete
Supply ,Laying & Packing of cut/split stone 20 kg to 40 kg in spur/ stud including royality , Labour & T&P etc. Complete of work .
stage.html
html • 0.06 MB
technical_2088684.pdf
techsummary_2088684.pdf
finance_2088684.pdf
BOQ Comparative Chart
xlsx
finsummary_2088684.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BookletalldivWork.pdf
Tender Documents • 2.48 MB
BOQ_2088684.xls
BOQ • 0.27 MB
CorrigendumDateandForm112.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .