| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹83,609.96Admitted-Finance | -22.50% | ₹83,609.96 | L1 | Admitted-Finance |
| 2 | L2₹86,307.05+₹2,697.10 (3.23%)Admitted-Finance | -20.00% | ₹86,307.05+₹2,697.10 (3.23%) | L2 | Admitted-Finance |
| 3 | L3₹91,161.83+₹7,551.87 (9.03%)Admitted-Finance | -15.50% | ₹91,161.83+₹7,551.87 (9.03%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹1.1 L
EMD Value
₹2,160
Closing Date
17 Aug 2026, 6:00 pmClosed
DFO Pir-Panjal Forest Division Budgam
Office of the Divisional Forest Officer Pir-Panjal Forest Division Budgam, Kashmir, Jammu and Kashmir
Construction of Boundary Pillars (Mainline - 16 Nos) at Paripathri Forest, Raithan Range Pir Panjal Forest Division, Budgam under the scheme of UT CAPEX. Year 2026-27
2026_FD_320020_1
e-NIT NO 03 OF 2026-27(Pir-Panjal Forest Division)
Open Tender
Civil Works
Percentage
30 days
Budgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Centralized Pooling Account No. 0110010200001102
₹2,160
21 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation in trenches foundation or drains (not exceeding 1.5 mt. in width as well as 10 sqmts on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 mts & lead of 50 mts. Including getting out the excavated soil and disposal of suplus excavated soil as directed. | |||||
| 2Providing & Laying of dry stone soiling including ramming, dresssing etc. Complete in Foundations and floors, including head load. | |||||
| 3 | Providing & laying in position cement concrete (1cement, 4 coarse sand, 8 graded stone aggregate 40 mm nominal size) mix of specified grade excluding cost of centering & shuttering. All work upto plinth level | - | CUM | 1 | - |
| 4Providing & laying cement concrete 1:3:6 mix using 1cement, 3 coarse sand, 6 graded stone aggregate 40 mm nominal size of specified grade excluding cost of centering & shuttering. All work upto plinth, Pillar, Plug/Coping. | |||||
| 5Reinforced cement concrete work in walls (any thickness) including attached pilasters, butteresses, plinth and string courses, fillets, columns, pillars, piers,abutments,posts & struts upto floor 5 level in 1:1 1/2:3 upto five level including curing but excluding the cost of centring, shatring , finishing and reinforcement. | |||||
| 6Centering and shuttering including strutting, propping etc and removal of form work for.Walls, Column pillars, abatement posts & struts. | |||||
| 7Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and bending all complete (TMT Bars) | |||||
| 8 | 12 mm Cement Plaster of mix 1:4 (1 Cement: 4 Coarse Sand) sides of pillar. | 1 | SQM | - | - |
| 9 | Finishing walls with textured exterior paint of required shade on new work (Two or more coats applied @ 3.28 litre/10Sqm. Over and including base coat of water proofing cement paint applied @ 2.20 Kg/10Sqm including making of prescribed Departmental LOGO on all boundary pillars with writing of geo cordinates (Exterior finishing) | - | SQM | 1 | - |
| 10Carriage of materials by Mechanical Transport up to dumping site of work | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1062066.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .