Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹56.4 L
EMD Value
₹57,000
Closing Date
27 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Infra Public Utilittes works at Manamadurai Block in Sivagangai District - Package No. 39
2022_RDTN_243283_1
39_Pack_AGAMT II 21-22/MNM
Open Tender
Civil Works
Item Rate
90 days
SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹57,000
13 Aug 2022
22 Jul 2022
27 Jul 2022
22 Jul 2022
27 Jul 2022
22 Jul 2022
90 days
Amount
CONSTRUCTION OF GIRLS TOILET AT P.U. ELE SCHOOL IN MANGULAM VILLAGE IN MANGULAM PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including all charges etc complete
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Supply and Fixing of Oriya Type Indian Water Closet 580mm x 440mm with "P" or "S" Trap
Supply and Fixing of European Water Closet with "P" or "S" rap withDouble Flapped Seat and Seat Cover with Brass Hinges and 10 litre capacity PVC Low Level Flusing Tank with all internal fittings
Supply and Fixing of PVC Storage tank 500 Ltr including all charges etc complete with water supply
Sub Estimate for Incinator
Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Sub total
CONSTRUCTION OF TEACHERS TOILET AT P.U. ELE SCHOOL IN MANGULAM VILLAGE IN MANGULAM PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Reinforced Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting with Exterior emulsion paint two coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting Two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
CONSTRUCTION OF TEACHERS TOILET AT P.U. ELE SCHOOL IN CHITHALAGUNDU VILLAGE IN MANGULAM PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting with Exterior emulsion paint two coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting Two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
CONSTRUCTION OF GIRLS TOILET AT P.U. ELE SCHOOL IN PANICKANENDAL VILLAGE IN MANGULAM PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Supply and Fixing of Oriya Type Indian Water Closet 580mm x 440mm with "P" or "S" Trap
Supply and Fixing of European Water Closet with "P" or "S" rap withDouble Flapped Seat and Seat Cover with Brass Hinges and 10 litre capacity PVC Low Level Flusing Tank with all internal fittings
Supply and Fixing of PVC Storage tank 500 Ltr including all charges etc complete with water supply
Sub Estimate for Incinator
Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
CONSTRUCTION OF PUBLIC DISTRIBUTION SHOP BUILDING @ UDAYANPATTI VILLAGE IN MUTHANENTHAL PANCHAYAT.
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cess pool
Supply Filling in foundation and basement with crushed stone sand including cost and conveyance of all materials to site and all labour charges etc complete
Supply Filling in foundation and basement With Gravel including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Grade 1
For SS Ground floor
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Column below g.l.
RCC floor slab
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Below G.L.
Above G.L.
Plastering with cement mortar 1:3 mix to20mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Granolethic floor finish with cement concrete 1:2:4 mix using 10-12mm ISS chips including cost and conveyance of all materials and all labourcharges etc, complete.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and all labour charges etc complete.
Supplying & fixing with cuddapah slabs including cost and all labour charges etc complete.
Supplying and fabrication of the following steel doors , window,Ventilators and counter including cost and conveyance and all charges etc complete.
Steel Door -D1
PVC Door D2
Window
Ventilator V
Rolling Shutter RS-1
Rolling Shutter RS
Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W. switch box with 5amps F.T. switch in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wireconnection of 14 SWG wire for cocealed Light point/fan point (5 points per coil) [ SD No. 24 ]
Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with 150×100×113mmTW switch box for 5A - 3 pin- non inter locking CS plug Including pin top with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for concealed PVC Plug Point [SD NO 37 ]
Supply and fixing of 16 Amps DPIC switch of 500 V with fuse and neutral(side handle ) on suitable T.W.box with earth connection only.[SD no.142]
Supplying and fixing of water tight Bulk head fitting with guard (Philips/bajaj/crompton/Klite) suitable for incandescent lamp and 60W bulb . [ SI 85 ]
Supplying and fixing of CFL bulb
Supplying and fixing of Ceiling FAN
Service wire
Service Pipe
Supplying and fixing in position Indian closet (9oriya type) of size 580 X 400 mm white glazed earthern ware of approved quality and brand with "p" of "S" trap conforming to BIS with sand cushion and forming flooring alround the closet using 40 mm broken , brick jelly in lime concrete 1:2:5 (One Lime, Two Sand, and Five nrick jelly) 100 mm thick and finishing the top to the require slope and including giving necessary connection to CI soil pipes (including the cost of 100mm dia CI pipe for a length of 600mm) by dismantling brick masory wall / reinforced cement concrete roof / floor slab and making good the dismantled portion to the original condition with leakages etc., complete compleying with standard
Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on
Supplying and fixing in position 15mm dia brass CP screw down tap / Pillar tap (heavy duty) of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary. (Taps should be got approved by the Executive Engineer before use on the works
Supplying, laying and jointing UPVC pipes of approved quality and best variety conforming to BIS of the following dia including cutting, threading and fixing PVC specials using UPVC adhesives (but excluding cost of such specials) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work / cement concrete and plastering neatly wherever necessary with necessary scaffolding charges upto 4 metre height above ground level, etc., complete complying with standard specifications
25mm dia UPVC pipe
20mm dia UPVC pipe
Supplying and fixing UPVC specials including labour charges etc. complete.
25mm dia
Elbow
25x20mm Reducer
20 mm dia
Elbow
20x15mm Reducer
Supplying and fixing in position best quality PVC soil / waste pipes of various dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation will be measured and paid separately in the cases where the pipe lines are proposed to laid below ground level
110mm dia PVC soil / waste pipe
75mm dia PVC soil / waste pipe
Supplying and fixing in position PVC Specials of the following dia and types of approved quality conforming to BIS and providing leak proof joints including fixing to the walls and giving connection to the PVC soil stacks, dismantling the masonry or RCC works and re-complete complying with standard specification. (The PVC Special should be got approved by the Executive Engineer before use on works)
110 MM Dia
Elbow
75 MM Dia
Elbow
Supplying, laying and jointing glazed stone ware pipes of the following dia of approved quality with spigot and socket ends and fixing them in dry condition using spun yarn and cement including petty masonry shoring and strutting wherever found necessary and laying the pipe line in the alignment at the specified gradient and testing with necessary tools and plants, etc., and re-filling the trench with excavated earth and levelling the ground etc., complete
CONSTRUCTION OF PUBLIC DISTRIBUTION SHOP BUILDING @ SEIKALATHUR VILLAGE AND PANCHAYAT.
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Supply Filling in foundation and basement with crushed stone sand including cost and conveyance of all materials to site and all labour charges etc complete
Supply Filling in foundation and basement With Gravel including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Grade 1
For SS Ground floor
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Column below g.l.
RCC floor slab
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Below G.L.
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Granolethic floor finish with cement concrete 1:2:4 mix using 10-12mm ISS chips including cost and conveyance of all materials and all labourcharges etc, complete.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and all labour charges etc complete.
Supplying and fabrication of the following steel doors , window,Ventilators and counter including cost and conveyance and all charges etc complete.
Steel Door -D1
Window
Window w-1
Supply of European water closet with p or s trap 10 lts
Supply of wash hand basin 1 nos
Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W. switch box with 5amps F.T. switch in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wireconnection of 14 SWG wire for cocealed Light point/fan point (5 points per coil) [ SD No. 24 ]
Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with 150×100×113mmTW switch box for 5A - 3 pin- non inter locking CS plug Including pin top with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for concealed PVC Plug Point [SD NO 37 ]
Supply and fixing of 16 Amps DPIC switch of 500 V with fuse and neutral(side handle ) on suitable T.W.box with earth connection only.[SD no.142]
Supplying and fixing of water tight Bulk head fitting with guard (Philips/bajaj/crompton/Klite) suitable for incandescent lamp and 60W bulb . [ SI 85 ]
Supplying and fixing of CFL bulb
Supplying and fixing of Ceiling FAN
Service wire
Service Pipe
Sub total
CONSTRUCTION OF GIRLS TOILET AT P.U. ELE SCHOOL IN KALKURICHI VILLAGE AND PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including all charges etc complete
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Supply and Fixing of Oriya Type Indian Water Closet 580mm x 440mm with "P" or "S" Trap
Supply and Fixing of European Water Closet with "P" or "S" rap withDouble Flapped Seat and Seat Cover with Brass Hinges and 10 litre capacity PVC Low Level Flusing Tank with all internal fittings
Supply and Fixing of PVC Storage tank 500 Ltr including all charges etc complete with water supply
Sub Estimate for Incinator
Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
CONSTRUCTION OF GIRLS TOILET AT P.U. ELE SCHOOL IN GANGAIAMMAN NAGAR VILLAGE IN KALKURICHI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including all charges etc complete
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Supply and Fixing of Oriya Type Indian Water Closet 580mm x 440mm with "P" or "S" Trap
Supply and Fixing of European Water Closet with "P" or "S" rap withDouble Flapped Seat and Seat Cover with Brass Hinges and 10 litre capacity PVC Low Level Flusing Tank with all internal fittings
Supply and Fixing of PVC Storage tank 500 Ltr including all charges etc complete with water supply
Sub Estimate for Incinator
Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
CONSTRUCTION OF CYCLE STAND AT VEDHIYARENTHAL GOVT HIGH SCHOOL IN KEELAPASALAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Cement concrete 1:1:5:3 (One cement two sand and four jelly) using 20mm H..G. jelly for all R.C.C. items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing but providing fixtures like fanclamps in the R.C.C. floro or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams etc., complete
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete
Supplying& fixing of Gi Pipe 65mm dia pipe for purlings in GRT GI Sheet roofing including all labour charges etc complete
Supplying &fixing of Hollow pipe Truss of size 0.60x0.40x4mm for GI Sheet roofing including all labour charges etc complete
Supplying &fixing of Hollow Pipe of size 0.50x0.25x3mm for GI Sheet roofing including all labour charges etc complete
Supplying and fixing of GRT Sheet 1.6mm thick Roofing sheet including all labour charges etc complete
Painting with Plastic Emulsion paint two coats with including cost of all materials and labour charges etc., complete as per standard secification.
CONSTRUCTION OF TEACHERS TOILET AT P.U ELE SCHOOL IN VEDHIYARENDHAL VILLAGE IN KEELAPASALAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting with Exterior emulsion paint two coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting Two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
CONSTRUCTION OF TEACHERS TOILET AT P.U ELE SCHOOL IN SANGAMANGALAM VILLAGE IN KEELAPASALAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting with Exterior emulsion paint two coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting Two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
CONSTRUCTION OF KITCHEN SHED BUILDING AT P.U ELE. SCHOOL IN A.NEDUNKULAM VILLAGE IN MELAPASALAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost).
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
centering
centering
centering
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Supply Steel door fully covered with CR sheet 18 Gauge Single Leaf door 1.00 x 2.10m of Steel door fully covered with CR sheet 18 Gauge Single Leaf door 0.90 x 2.10m
Steel Windows with Double Leaves Shutters. Consider the windows of size = 1.20 m x 1.30
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm size jelly 25mm thick
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Weathering coarse using b.Jelly concrete inculding cost and conveyance of all materials to site and labour charges for curing etc
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting with Exterior emulsion paint two coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting Two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
CONSTRUCTION OF TEACHERS TOILET AT P.U ELE SCHOOL IN A.NEDNKULAM VILLAGE IN MELAPASALAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting with Exterior emulsion paint two coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting Two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
CONSTRUCTION OF TEACHERS TOILET AT P.U ELE SCHOOL IN ARIMANDAPAM VILLAGE IN MELAPASALAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Providing centering and soffits including cost and conveyance of country wood and all labour charges etc., complete.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Plastering with Cement Mortar 1:3 (one cement and three sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Dadooing walls with Glazed Tiles including all labour charges etc complete
Distempering two coat including cost of fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting with Exterior emulsion paint two coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting Two coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MRADHAKRISHNAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .