Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | -25.23% | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 L+₹30,652.89 (6.99%)Admitted-Finance | -20.00% | ₹4.7 L+₹30,652.89 (6.99%) | L2 | Admitted-Finance |
| 3 | L3₹4.8 L+₹46,477.52 (10.6%)Admitted-Finance | -17.30% | ₹4.8 L+₹46,477.52 (10.6%) | L3 | Admitted-Finance |
| 4 | L4₹5.0 L+₹59,957.76 (13.7%)Admitted-Finance | -15.00% | ₹5.0 L+₹59,957.76 (13.7%) | L4 | Admitted-Finance |
| 5 | L5₹5.6 L+₹1.2 L (27.1%)Admitted-Finance | -5.00% | ₹5.6 L+₹1.2 L (27.1%) | L5 | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹11,720
Closing Date
7 Aug 2026, 4:00 pmClosed
Executive Engineer
Mini Sectt Bandipore
Construction of protection work on War Khul at RD 500 mtr part-I
2026_IFC_318896_1
E-NIT No 05 of 2026-2027
Open Tender
Civil Works
Percentage
25 days
Bandipore
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
Executive Engineer
₹11,720
Yes
13 Aug 2026
1 Aug 2026
8 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 112.66 | Cum | 187.3 | ₹21,101.22 |
| 0.0 | Hand-packing stones in wire-crates; excluding cost of crates and stones. | 197.71 | Cum | 371.15 | ₹73,380.07 |
| 0.0 | Dumping stone excluding cost of stones. In Horizontal on level | 58.17 | Cum | 237.9 | ₹13,838.64 |
| 0.0 | Supply of nallah stones (boulders) | 255.88 | Cum | 700 | ₹1,79,116 |
| 0.0 | Supply of black annealed wire crates mesh 4"x4" mesh made of 4 mm dia BA wire machine woven both ends bent | 8,601.12 | sft | 21 | ₹1,80,623.52 |
| 0.0 | Cost of B.A Wire incld. Carriage | 50.4 | Kg | 85 | ₹4,284 |
| 0.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 2.55 | Cum | 218.4 | ₹556.92 |
| 0.0 | Carriage of materials from source to road site of work by mechanical transport incld. Loading unloading and stacking: Wire crates for an av lead of 09 km | 1.81 | MT | 702.38 | ₹1,271.31 |
| 0.0 | Carriage of materials from road site to site of work by manual labour incld. Loading unloading and stacking for an av lead of 150 mtr. Wire crates | 1.81 | MT | 286.24 | ₹518.09 |
| 0.0 | Nallah boulders for an av lead of 300 mtrs | 255.88 | Cum | 435.39 | ₹1,11,407.59 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1053421.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .