Loading…
Loading…
Tender Value
₹26.5 L
EMD Value
₹2.6 L
Closing Date
22 Jul 2026, 10:00 am
EO SHIVRAJPUR
OFC NP SHIVRAJPUR KAPUR NAGAR
WARD No.07 BHUTESHWAR TEMPLE
2026_DOLBU_1163225_1
134/NPS/Vandan/2026-27
Open Tender
Civil Works
180 days
SIVRAJPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,186
EO
₹2.6 L
24 Jun 2026
24 Jun 2026
22 Jul 2026
24 Jun 2026
22 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick cleaning work and manually/ straightening by mechanical reinforcement from means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer- in- charge. | - | Cum | - | - |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer- in- Charge: all kind of Soil | 1 | Sqm | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level :1: 1.5: 3 (1 cement: 1.5 coarse sand( zone- III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural fotting, beam collumn | 1 | Sqm | 1 | ₹1 |
| 4 | Brick work with common burnt clay F.P.S.( non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1: 4 (1 cement: 4 coarse sand) | - | Cum | 1 | - |
| 5 | 15 mm cement plaster on rough side of sigle or half brick wall of mix: 1: 4 (1 cement: 4 coarse sand) | - | Sqm | 1 | - |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: 1: 1.5: 3 (1 cement: 1.5 coarse sand( zone- !!!) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | - | - |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe- 500D or more. | - | kg | 1 | - |
| 9 | Centering and shutering including struting, proping etc and removal of form form Suspenedfloor, roof, landing, balconies and acess platform beam | 1 | Sqm | - | - |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | - | Sqm | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_2180608.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid