Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.6 LAccepted-AOC 2974 URBAN ESTATE JIND 126102 | JIND | JIND | HARYANA | 126102 | L1 | Accepted-AOC you are L1 | |
| 2 | L2₹35.1 L+₹15,104 (0.43%)Rejected-Finance HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | L2 | Rejected-Finance you are L2 |
Tender Value
₹30.9 L
EMD Value
₹61,800
Closing Date
1 Feb 2021, 6:00 pmClosed
Executive Engineer, PHE Division No.1, Karnal
Executive Engineer, PHE Division No.1, Karnal, opposite Nehru Palace, Old Subzi Mandi, Karnal
Supply Erection testing commissioning 250 KVA transformerand 200 KVA DG Set and construction of DG platform shed for DG set elec mech. instr. work required from transformer and DG set to HT LT room of MPS and STP for running and O and M 12 months
2021_HRY_157524_1
Supply erection test of transformer in vil. kachwa
Open Tender
Civil Works
Works
455 days
Karnal
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹61,800
24 Feb 2021
25 Jan 2021
2 Feb 2021
25 Jan 2021
1 Feb 2021
25 Jan 2021
Amount
Supply, Erection, Testing & Commissioning of 1 NO. copper wound ester oil filled Transformer of 250KVA on load tap changer or suitable capacity on higher side (at 2 MLD STP in village Kachhwa), with servo stabilizer of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels along with for each Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 10 years thereafter
Supply, Erection, Testing & Commissioning of 1 Nos. Silent DG Set of 200 KVA or suitable capacity on higher side (at STP) capacity each with Acoustic Canopy, AMF Panel and Copper Earthing of suitable rate with change over switch & synchronizing panel (CPCB norms compliance), Shed for DG set and any other contingent thereto complete in all respect as per DNIT including Operation & Maintenance during 1year of defect liability period after 3 months of satisfactory trial run and 10 years thereafter.
Bidder Name
Amount
PARAMJEET CONTRACTOR(GSTN-NA)
Himmat Singh Contractor(GSTN-NA)
Himmat Singh Contractor
Himmat Singh Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .