Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹3,133.41 (1.57%)Admitted-Finance R O BHARDA KALAN P O TEH AKHNOOR PIN 181201 DISTT JAMMU J K | JAMMU | JAMMU AND KASHMIR | 181201 | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹4,253.78 (2.13%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
12 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
OFFICE OF EXECUTIVE ENGINEER REW JAMMU
Construction Of Lane Tile work mohalla sahib Bandgi Ashram Main Road To Madan lal House Ward No 05 PYT Bharda Kalan Block Akhnoor Under DDC Budget For the Year 2026- 27 (PYT LEVEL)
2026_RDPR_318377_5
e-NIT No. 304 REWJ of 2026-27 dated 29-07-2026
Open Tender
Civil Works - Others
Item Rate
JAMMU
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹4,000
2 Sept 2026
29 Jul 2026
13 Aug 2026
29 Jul 2026
12 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Laying of Cement concrete 1:5:10 ( 1 cement:5 coase sand : 10 graded stone aggregate of 40mm) ofspecified grade including curing but excluding cost of centering and shuttering all works upto plinth level. | 8.5 | m3 | 4,826.5 | ₹41,025.25 |
| 2 | Providing and Laying of Cement concrete 1:3:6( 1 cement:3 coase sand : 6 graded stone aggregate of 20mm) ofspecified grade including curing but excluding cost of centering and shuttering all works upto plinth level. | 3.5 | m3 | 5,733.6 | ₹20,067.6 |
| 3 | Providing and Laying in Position cement Concrete of specified grade including curing but excluding the cost of centering,shuttering, finishing and reinforcement. All work upto plinth level with 1:1.5:3 ( 1 cement:1.5 Coarse aggregate : 3 graded stone aggregate of 20mm nominal size. | 1.01 | m3 | 7,788.4 | ₹7,866.28 |
| 4 | Steel Reinforcement for RCC work including straightening,cutting,bending,placing in position and binding all complete upto plinth level Thermo - Mechanically Tested Bars of grade Fe 500D or more | 52 | kg | 123.2 | ₹6,406.4 |
| 5 | Providing and laying Damp Proof Course 40mm thick with Cement concrete 1:2:4 (1 Cement 2: Coarse sand : 4 Graded stone 12.5mm nominal size )and curing complete | 5.57 | m2 | 346.7 | ₹1,931.12 |
| 6 | Providing and laying 60mm Thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick conpacted bed of fine sand, filling the joints with coarse sand etc all complete as per direction of Engineer -in-incharge. | 130.52 | m3 | 816.15 | ₹1,06,523.9 |
| 7 | Centering and shuttering including strutting,propping etc. and removal of formwork for Foundations, footings,bases for columns. | 6.97 | sqm | 286 | ₹1,993.42 |
| 8 | Slab | 5.57 | sqm | 718 | ₹3,999.26 |
| 9 | Edges | 15.24 | rm | 262 | ₹3,992.88 |
| 10 | Carriage of Key Construction material from source to site of work by mechanical means of transport of sand aggregate average 7 km laid by MT. | 20.25 | m3 | 232.06 | ₹4,699.22 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1048600.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .