Tender Value
₹44.6 L
EMD Value
₹4.6 L
Closing Date
23 Jun 2026, 12:00 pm
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
BAROLI AHEER AGRA
CONSTRUCTION OF CHECKDAM AT , VILLAGE SEMARI, BLOCK CHAUMUNHA, DISTT MATHURA, KOSI ARTCLE DRAIN
2026_UPMID_1157254_1
tender no 02 semari checkdam mathura
Open Tender
Civil Works - Others
90 days
CHAUMUNHA
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹2,354
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
₹4.6 L
Yes
5 Jun 2026
5 Jun 2026
23 Jun 2026
5 Jun 2026
23 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.1 | Earthwork excavation in Ordinary soil including lead 45.0 m and lift 1.5m 40% of E/W (IDS5.1B+5.6A)(100+8)+ | 1,694.99 | m³ | - | - | BI01010001010000000000000515BI0100001112 |
| 1.2 | As above but lift 1.5m to bed level 60% of E/W
(IDS 5.1B+5.6 Cx5+5.6A+6gb) | 2,542.49 | m³ | 137 | ₹3,48,321.13 | BI01010001010000000000000515BI0100001113 |
| 2 | Earth Work in excavation in Foundation in ordinary saturated soil. With 5.5 lifts & 45.0 m lead
(IDS 5.1B+5.6Cx21+5.6Ax1+5.6G(B) | 489.26 | m³ | 162 | ₹79,260.12 | BI01010001010000000000000515BI0100001118 |
| 3 | Removal of slush in nalabed before excavation of saturated soil.(IDS 5.1B+5.6Cx10+5.6Ax1+5.6G (A) | 112.58 | m³ | 166 | ₹18,688.28 | BI01010001010000000000000515BI0100001122 |
| 4 | C.C.in 1:3:6 Cement, Sand and 25 to 50 mm Stone ballast including the cost of materials labours and etc. required for proper completion of work.( From Ananlysis) | 318.65 | m³ | 5,615 | ₹17,89,219.75 | BI01010001010000000000000515BI0100001123 |
| 5 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. ( From Ananlysis) | 134.41 | m³ | 5,159 | ₹6,93,421.19 | - |
| 6 | R.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.( From Ananlysis) | 107.39 | m³ | 5,272 | ₹5,66,160.08 | - |
| 7 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for proper completion of work.( From Ananlysis) | 76.19 | m³ | 6,039 | ₹4,60,111.41 | BI01010001010000000000000515BI0100001125 |
| 8 | Raised struck pointing in 1:3 Cement sand mortar including the cost of material labour etc.to required for proper completion of work. | 132.39 | m² | 160 | ₹21,182.4 | - |
| 9 | 1:4 Cement, Sand Mortar plaster on stone masonery of checkdam. | 89.89 | m² | 235 | ₹21,124.15 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_2168514.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid