Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-Finance NO 1 PALLAKINATHU STREET AVANIYAPURAM MADURAI 12 | MADURAI | MADURAI | TAMIL NADU | L1 | Accepted-Finance L1 | |
| 2 | L2₹11.3 L+₹18,909.50 (1.69%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹12.0 L+₹80,163.30 (7.18%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹12.0 L+₹83,582.94 (7.49%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹13.1 L+₹1.9 L (17.3%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | A KALIPPAN L3 | HRITHIC CONSTRUCTIONS L2 | SHAKTHI CONSTRUCTION L5 | S.HARI BALAKRISHNAN L6 | N.MOHANRAM L1 | SAIGURU COMMUNICATIONS L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | 102 | Cum | 130 ₹13,260 | 100 ₹10,200 | 100 ₹10,200 | 90 ₹9,180 | 250 ₹25,500 | 60 ₹6,120 Lowest |
| 2.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete. | 14 | Cum | 6,000 ₹84,000 | 4,500 ₹63,000 Lowest | 5,000 ₹70,000 | 5,454 ₹76,356 | 4,900 ₹68,600 | 5,000 ₹70,000 |
| 3.00 | RCC 1:1.5:3 using ( M20 ) 12-20mm (machine crushed) metal for raft foundation without formwork including cost of all materials,water charges, labour lead, litf, etc., complete. | 27 | Cum | 6,500 ₹1,75,500 | 7,000 ₹1,89,000 | 8,500 ₹2,29,500 | 9,009 ₹2,43,243 | 5,900 ₹1,59,300 Lowest | 6,500 ₹1,75,500 |
| 4.00 | RCC 1:1.5:3 using 12 to 20mm including cost of all materials, form work, centering, curing, all labour charges, water charges , lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete. | 6 | Cum | 8,000 ₹48,000 | 8,000 ₹48,000 | 12,000 ₹72,000 | 9,999 ₹59,994 | 9,900 ₹59,400 | 6,500 ₹39,000 Lowest |
| 5.00 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. | 2,700 | Kg | 70 ₹1,89,000 | 70 ₹1,89,000 | 80 ₹2,16,000 | 90 ₹2,43,000 | 50 ₹1,35,000 Lowest | 100 ₹2,70,000 |
| 6.00 | Brickwork in CM 1:3 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" for bath, fol, brick on edge, partition wall, superstructure including cost of labour materials, curing, lead,water charges, lift, etc., complete. | 29 | Cum | 8,500 ₹2,46,500 | 7,000 ₹2,03,000 | 7,000 ₹2,03,000 | 9,000 ₹2,61,000 | 8,900 ₹2,58,100 | 6,500 ₹1,88,500 Lowest |
| 7.00 | Labour charges for transporting from casting yard to curing tank,curing tank cable duct , aligning and fixing of RCC pre cast cover slab as directed by the site engineer including all labour lead lifts etc complete | 210 | Nos | 100 ₹21,000 | 50 ₹10,500 Lowest | 80 ₹16,800 | 270 ₹56,700 | 60 ₹12,600 | 50 ₹10,500 Lowest |
| 8.00 | Supply and Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete | 700 | kg | 90 ₹63,000 Lowest | 100 ₹70,000 | 120 ₹84,000 | 126 ₹88,200 | 95 ₹66,500 | 100 ₹70,000 |
| 9.00 | Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, water charges, labour, lead, litf, etc, complete. | 258 | Sqm | 200 ₹51,600 Lowest | 200 ₹51,600 Lowest | 250 ₹64,500 | 270 ₹69,660 | 300 ₹77,400 | 280 ₹72,240 |
| 10.00 | Painting the outside walls with two coats of ''ULTIMA" paint over a white cement primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete. | 258 | Sqm | 300 ₹77,400 | 200 ₹51,600 | 200 ₹51,600 | 360 ₹92,880 | 150 ₹38,700 | 50 ₹12,900 Lowest |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
15 Sept 2026, 12:00 pmClosed
SE/GCC/MDU
Office of SE/GCC/MDU
Construction of cable duct for 11 KV feeder outgoing source to the proposed panangadi 110/11 KV
2026_EB_699398_1
SE/GCC/MDU 015/2026-27
Open Tender
Civil Works - Others
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,000
25 Sept 2026
29 Aug 2026
16 Sept 2026
29 Aug 2026
15 Sept 2026
29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | 102 | Cum | - | - |
| 2 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete. | 14 | Cum | - | - |
| 3 | RCC 1:1.5:3 using ( M20 ) 12-20mm (machine crushed) metal for raft foundation without formwork including cost of all materials,water charges, labour lead, litf, etc., complete. | 27 | Cum | - | - |
| 4 | RCC 1:1.5:3 using 12 to 20mm including cost of all materials, form work, centering, curing, all labour charges, water charges , lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete. | 6 | Cum | - | - |
| 5 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. | 2,700 | Kg | - | - |
| 6 | Brickwork in CM 1:3 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" for bath, fol, brick on edge, partition wall, superstructure including cost of labour materials, curing, lead,water charges, lift, etc., complete. | 29 | Cum | - | - |
| 7 | Labour charges for transporting from casting yard to curing tank,curing tank cable duct , aligning and fixing of RCC pre cast cover slab as directed by the site engineer including all labour lead lifts etc complete | 210 | Nos | - | - |
| 8 | Supply and Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete | 700 | kg | - | - |
| 9 | Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, water charges, labour, lead, litf, etc, complete. | 258 | Sqm | - | - |
| 10 | Painting the outside walls with two coats of ''ULTIMA" paint over a white cement primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete. | 258 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_840785.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .