Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹25,053
Closing Date
20 Apr 2026, 3:00 pmClosed
Municipal Commissioner
Nagar Nigam Firozabad
Road construction work by RCC drain and interlocking relaying from Pradeep Chak to Deshraj house in Ward No. 19 Shiv Nagar Colony.
2025_DOLBU_1093722_290
11/PWD/2025-26
Open Tender
Civil Works
Percentage
30 days
Firozabad
Road construction work by RCC drain and interlocking relaying from Pradeep Chak to Deshraj house in Ward No. 19 Shiv Nagar Colony.
2 documents required · 2 mandatory
₹354
Municipal Commissioner
₹25,053
Yes
5 May 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of B.O.E soling/Inter locking tiles Including Stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of EI/C (Labour only) (PWD SOR 2022-23, Chepter-20, Serial No.19 Item No. New) | - | Sqm | - | - |
| 2 | Earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate) | - | Sqm | - | - |
| 3 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse Fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1) | - | cum | - | - |
| 4 | Grandular Sub-base with well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis) | - | cum | - | - |
| 5 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:4 (1 cement : 1.5 coarse sand : 4 graded stone aggregate 20 mm nominal size) . | - | cum | - | - |
| 6 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWDSOR 2022-23 Chapter No-05 Item No. 5.2spec. No. 5.2.2) | - | cum | - | - |
| 7 | Relaying of old 80 mm thick i-Shaped & zig-zag shaped inter locking tiles including 30 mm thick local sand base levelling and dressing of surface required level and slope, filling joints with local sand all complete.(As per Analysis of Rate) | - | Sqm | - | - |
| 8 | Supply & Laying Precast Concrete blocks (interlocking tiles) of paving of thickness 80 mm (compressive strength not be less than 30 Mpa ) including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work as specified in IS 15658:2006 . (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) | - | Sqm | - | - |
| 9 | Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work. (PWD SOR 2022-23 Chapter No-05 Item No. 4.1 spec. No. 4.1) | - | Cum | - | - |
| 10 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No. 8 spec. No. 5.1) | - | Cum | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_2121280.xls
BOQ • 0.35 MB
TD.pdf
Additional Documents • 2.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .