Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹2.5 L
Closing Date
2 Sept 2026, 10:30 pm4d left
Karnataka Power Corporation Limited
VIJAYANAND SHAVI
9449596545
RTPS D-Meter survey & replacement of eroded Boiler Tubes during overhaul and associated works of Units 2 to 4 Boilers of RTPS (OH-3)
KPCL/2026-27/PS/WORK_INDENT4720
KPCL/2026-27/PS/WORK_INDENT4720
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Executive Engineer BM1 Office RTPS Raichur
4 documents required · 0 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The intending bidder should have satisfactorily completed, as a prime contractor, at least one similar work such as D-meter survey and replacement of eroded Boiler Tubes during Overhaul/Periodical Special assistance works of value not less than Rs. 82 Lakhs in the last five years (i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-2026) in any Thermal Power Stations of 210 MW and above capacity Units. As a proof of this, the bidder should upload Work Done Certificates (limiting to three), with cumulative value not less than Rs. 82 Lakhs, issued by competent authority. (Work done of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial year 2026-27).
The intending bidder, in his name should have achieved a minimum financial turnover of Rs. 327 Lakhs in at least two financial years during the last five years (i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-2026). As a proof of this, the bidder shall upload the certified copy of Profit & Loss Account or Turn over Certificate duly certified by the Chartered Accountant. (Financial turnover of previous years shall be given weightage of 10% per year to bring them to the present price level of financial year 2026-27).
The intending bidder should be an authorized Special Class Boiler Repairer. As a proof of this, bidder shall upload the Valid Certificate issued by competent authority of Govt of Karnataka State. (If the Certificate is from any other state, same shall be endorsed by the competent authority of Govt of Karnataka State).
₹4,090
₹2.5 L
25 Aug 2026
25 Aug 2026
3 Sept 2026
29 Aug 2026
27 Aug 2026
RTPS DMeter survey & replacement of eroded Boiler Tubes during overhaul and associated works of Units 2 to 4 Boilers of RTPS (OH-3)
Cleaning and assisting in D Meter survey/NDT of Water wall tubes/bends around soot blowers, burner panels, corner tubes & rear arch tubes/bends in first pass of Boilers- 1 to 4. (Per Boiler) ---- BIDD...
Cleaning and assisting in D Meter survey/NDT of tubes and bends in the roof tubes area of Boiler- 1 to 4.(Per Boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Cleaning and assisting in D Meter survey/NDT of nipple welds of all the headers and links in pent house of Boiler- 1 to 4.(Per Boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of eroded tubes/bends of Water wall tubes/bends around soot blowers of boiler 1-4. (Per Joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of eroded tubes/bends of Water wall tubes/bends around burner panel, corner tubes and near S-Panel of boiler 1-4.(Per joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of eroded tubes/bends of Water wall rear arch, Screen & hanger tubes of boiler 1-4. (Per joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of eroded tubes/bends of Platen superheater, reheater coil and steam cooled spacer tubes/bends of boiler 1-4. (Per joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of Tubes/bends cut for RLA study test in Unit-1- 4 boilers (Per joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Fin welding of water wall tubes around soot blowers, around burner panel and corner tubes, rear arch tubes and water wall membrane. ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Reinforcement of eroded old welded joints of tubes in 1st pass of the furnace.(Per joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Pad (Protection shield) welding over water wall tubes around wall blowers area and burner corners (RMT/boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Assisting in carrying out D meter survey/NDT of PLSH, Steam cooled spacer tubes, Reheat front and rear coil tubes and bends and Water wall hanger tubes in horizontal pass of boilers 1 to 4. (Per Boil...
Assisting in carrying out D meter survey/NDT of Water wall tubes at furnace bottom of boilers 1 to 4 (Per Boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Assisting for carrying out RLA study of Unit-1 - 4 boiler pressure parts including critical pipings (per day) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Assisting in D meter survey/NDT of LTSH upper bank & lower bank coils/bends, LTSH terminal and Eco Hanger tubes in second pass of Boilers-1 to 4. ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUM...
Assisting in D meter survey/NDT of Economiser upper & lower bank coils / bends and eco terminal tubes in second pass of Boilers -1 to 4 ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Assisting in D meter survey/NDT of Steam cooled wall front, rear, side & access door bends in second pass of Boilers of Unit-1 to 4 (per Boiler). ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUM...
Assisting in D meter survey/NDT of Water wall screen /SH hanger tubes and FSH coils in second pass of Boilers -1 to 4 ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of SHH8 to SHH9 LTSH supply tubes/bends eroded in second pass of boilers (unit 1&2 only)(Per Joint). ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of ECO. hanger & LTSH terminal tubes eroded in second pass of boilers of Unit 1-4. (per Joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of SH hanger tubes & Final SH tubes/bends eroded in Horizontal pass of Boiler of Unit 1-4. (per Joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Lifting / lowering of LTSH upper/LTSH lower / Economiser upper / Economiser lower / Economiser lower bank bunch of two coils and repositioning the same ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID...
Replacement of LTSH upper /LTSH lower / Economiser upper /Economiser lower bank assembly tubes (per Joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of tubes/bends of Steam Cooled wall (front, rear and side walls) (per joint). ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Reinforcement of eroded weld joints of the tubes/stubs in second pass. ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Inspection/rectification of cassette baffles provided over the bends in LTSH upper/lower & Economiser upper/lower bank of boilers - 1 to 4 (per boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH TH...
Removal / Replacement of the damaged/eroded cassette baffles of LTSH and ECO coils. ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Inspection/ Rectification/Replacement of damaged/eroded shroudings over the bends/tubes in LTSH terminal /Supply tubes, ECO hanger tubes LTSH coils/ ECO coils/stubs. ---- BIDDERS ARE REQUESTED TO GO T...
Replacement of damaged/eroded shroudings over the bends/tubes in Water wall screen/SH hanger tubes and steam cooled wall & spacers tubes. ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Repairs to skin casing in the rear arch enclosure covering the rear arch tubes and economiser hopper area.(per RMT) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Erection of scaffolding and working platform at below lower bank of economiser coils for Assisting in carrying out D-meter survey of eco inlet header tube and bends and inspection of header stubs ---...
Transporting of Sky climber Motors, platforms,Wire ropes etc. Erection of sky climbers inside the furnace, Dismantling & Transporting to stores after the completion of work. (4 Nos./Boiler). ---- BIDD...
Operation of sky climbers inside the furnace(round the clock per day operating per set). 20 days per unit, maximum of 4 sets of sky climbers per day ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID ...
Shifting of sky climber inside the furnace (03 shiftings anticipated per unit). ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Water washing of furnance water wall and burner panels.(LS per boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
De-scaling of furnace water wall and burner panels.(LS per boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Cleaning/clearing of ash acumulated over goose neck area below reheater coils and SH coils: (LS/ Boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Hydraulic test of Pressure parts system of boiler. ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Cleaning/collecting of ash/waste materials over the boiler roof deck seal.(Lumpsum/boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Cleaning/collecting of ash in the pent house and drum enclosure.(Lumpsum/boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Cleaning/removal of ash accumulated in rear arch enclosure and in furnace bottom 'S' panel enclosure. (L.S. per Blr.) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Cleaning of ash over LTSH & ECO Terminal tubes and LTSH , ECO upper/lower bank coils and ECO Hopper . (L.S. per Blr.) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Cleaning/removal of ash over the buck stay beams, wind box top and bottom, boiler floors and Opening/ Closing of all access door & peep hole doors.(L.S.per Blr.) ---- BIDDERS ARE REQUESTED TO GO TH...
Clearing/removal of wool mattress/cotton waste/scrap materials over boiler floors.(per day) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Welding of scallopped bar plates at furnace bottom (Per No.). ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Checking of alignment of RH & Platen SH coil assembly (Per boiler) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Re-alignment of RH & Platen SH coils with Spacer tube (Per coil) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of HP/ LP drain pipes/ tubes, Soot blowing lines, ACW lines and sampling lines in boiler area : Tubes OD upto 80 mm (Per Joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Replacement of HP/ LP drain pipes/ tubes, Soot blowing lines, ACW lines and sampling lines in boiler area : Tubes OD above 80mm. (Per Joint) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Rectification of leakages at peep hole doors in Ist pass of boiler (Per No.) ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Supply and usage of consumables as per the List detailed in Annexure-V ---- BIDDERS ARE REQUESTED TO GO THROUGH THE BID DOCUMENT
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
05 OH-3 Pressure Parts bid document 2026-27.pdf
Tender Document • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].