Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.6 L+₹1,298.50 (0.49%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.6 L+₹1,325 (0.50%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.6 L
EMD Value
₹5,300
Closing Date
23 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Development of Dangal wrestling Ground at Ward no.2 panchayat Upper Talwara Block Pouni Dist. Reasi under Capex(APDP) for the year of 2026-27.
2026_RDPR_324772_2
e-NIT No. 197 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
120 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹5,300
28 Sept 2026
15 Sept 2026
24 Sept 2026
15 Sept 2026
23 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 40.06 | Cum | 5,733.6 | ₹2,29,688.02 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 55.38 | Sqm | 286.35 | ₹15,858.06 |
| 3 | Construction of CIB (Include concrete/Brick pedestal of size 3' x 2'. Platering ,painting all complete job as per direction of Engineer-in-charge | 1 | No. | 3,000 | ₹3,000 |
| 4Carriage of material from source to site of work by MT/AT including loading, unloading and stacking complete. | |||||
| 4.01 | Cement 5 KM by MT. | 11.02 | MT | 178.43 | ₹1,966.3 |
| 4.02 | Sand 6.0KM by MT. | 22 | Cum | 216.4 | ₹4,760.8 |
| 4.03 | Aggregate 6.0KM by MT. | 45 | Cum | 216.14 | ₹9,726.3 |
stage.html
html • 0.02 MB
finance_1095867.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_1095867.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .