Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST REASONABLE BID | |
| 2 | L2₹25.6 L+₹87,340 (3.53%)Rejected-Finance WZ 88A JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | NEW DELHI | DELHI | 110064 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹25.8 L+₹1.1 L (4.44%)Rejected-Finance | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹25.9 L+₹1.2 L (4.83%)Rejected-Finance | L4 | Rejected-Finance NOT LOWEST | |
| 5 | L5₹29.3 L+₹4.6 L (18.6%)Rejected-Finance | L5 | Rejected-Finance NOT LOWEST |
Tender Value
₹32.5 L
EMD Value
₹65,000
Closing Date
16 May 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE ARMY JODHPUR
CWE ARMY MULTAN LINE ARMY AREA JODHPUR-342010
REPLACEMENT OF EXISTING ENERGY METERS WITH SMART PREPAID ELECTRIC METERS AT MOUNT ABU MIL STN UNDER AGE (I) UDAIPUR
2023_MES_587999_1
82223/93/E8
Open Tender
Electrical and Maintenance Works
Item Rate
515 days
MOUNT ABU
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
AGE (I) UDAIPUR
₹65,000
Yes
23 Jun 2023
1 Apr 2023
18 May 2023
1 Apr 2023
16 May 2023
10 May 2023
3 Apr 2023 - 20 Apr 2023
Amount
Taking down carefully old conventional electric meter of any size, rating, note down the current reading of meter and handover to MES (E&M stores yard) complete all as specified and as directed by Engineer-in-Charge.
Taking down old unserviceable meter boxes complete all as specified and as directed by Engineer-in-Charge.
Supply, Installation and commissioning of Single Phase Smart Elect Meter having the following specifications: (a) AC Single Phase Two Wire, Tamper Proof, Static Meter of Class 1.0, 240 V, 50 Hz, 10A-60A conforming to IS-16444 and relevant IEC standards with inbuilt 865-867 MHz Radio Frequency communication facility with Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LCD based circuitry. (b) Elect Meter Should support the following data: 15/30 minute instantaneous data for Voltage, Current, Power factor, Power, Cumulative energy and frequency, monthly billing data & antitamper features. Load survey data for 45 days with 30 min integration period for kWh, Voltage, Current, frequency etc. (c) Elect Meter should have connect/disconnect functionality operable from prepaid billing software & shall show balance on display. (d) The Elect meter should support open communication protocol DLMS (Device language message specification) with the software
Supply, Installation commissioning of 3 Phase Smart Elect Meter having the following specifications: (a) AC 3 Phase Two Wire, Tamper Proof, Static Meter of Class 1.0, 240 V, 50 Hz, 10A-60A conforming to IS-16444 and relevant IEC standards with inbuilt 865-867 MHz Radio Frequency communication facility with Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LCD based circuitry. (b) Elect Meter Should support the following data : 15/30 min instantaneous data for Voltage, Current, Power factor, Power, Cumulative energy and frequency, monthly billing data & antitamper features. Load survey data for 45 days with 30 min integration period for kWh, Voltage, Current, frequency etc. (c) Elect Meter should have connect / disconnect functionality operable from prepaid billing software & shall show balance on display . (d) The Elect meter should support open communication protocol DLMS (Device language message specification) with the software
NOTE FOR ITEM NO 3 & 4 (i) The Smart Elect Meter shall be capable to run the meter in both prepaid and post-paid mode (ii) The Smart Elect meters would carry minimum 5 year warranty. (iii) OEM should have own NABL accredited lab for testing Smart Elect meters as per IS 16444 (Latest) and certification shall be provided during sample approval. OEM shall have experience in field of smart prepaid elect meter installation as per IS 16444 (Latest) to any utility and PO/performance certificate copy shall be provided.
Supply, installation, testing and commissioning of IP54 compliant polycarbonate boxes with transparent cover suitable for single phase smart prepaid electric meters to view meter display parameter & with transparent/opaque base.
Supply ,installation, testing & commissioning of RF repeater unit with inbuilt Low Power Radio Frequency (LPRF) communication facility and inbuilt AC power supply complete all as specified and as directed. Note:- The rate quoted by the contractor deemed to be inclusive of all installation and elect supply arrangements for RF repeater unit for smooth and efficient functioning.
Supply, installation, testing & commissioning of Data Concentrator Unit (DCU) with inbuilt AC power supply and power backup facility for min 6 hours compatible for remote Automatic Meter Reading (AMR) solution and capable of communicating with the Low Power Radio Frequency (LPRF) Elect energy Meter with inbuilt LPRF communication facility in working on RF based Mesh network along with the cloud server through GPRS/4G cellular communication. Note:- The rate quoted by the contractor deemed to be inclusive of all installation and elect supply arrangements for DCU unit for smooth and efficient functioning.
Supplying, Fixing, Commissioning, testing and configuration of prepaid/post-paid web (cloud) based software for 217 Nos (Expandable upto 25% of 217 Nos) Elect Smart Meters of any make/brand having the specification as per IS 16444 (Latest) with following modules :- (a) Metering Data Management Module:- The meter data management module would be responsible and capable for collecting the data from the data concentrator unit (DCU) of any make/brand and make the data available to the billing system. The system/software would support elect meter's data entry. The electric meter data management system would capture and provide the following data :- (i) 15/30 minute instantaneous data from all the elect meters for i.e. seven parameters- Cumulative Energy, Instant Power, Current, Voltage, Power factor and Frequency. (ii) Monthly and quarterly billing survey data for cumulative energy and max demand. (b) Communication module: The system should provide communication of energy data and bills via print, email. (i) Meter Master Data : The system would support meter data repository. The system should support meter replacement process. (ii) Excel Export : The system would support export of metering and billing data in excel format
Note :- (a) Software License Charges shall be included for 2 years including DLP. (b) Bidder / OEM will provide necessary sim card / infrastructure for communication and will maintain recurring charges for 2 years for which cost is deemed to be included in the rates quoted by contractor. (c) Software shall be CERT-In ( Indian Computer Emergency Response Team) certified from CERT approved vendors for any cyber security related threat and a certificate along with relevant documents in this regard shall be provided by OEM before approval of the product. (d) It shall also be compatible for any make/brand of Smart Elect meter with valid IS16444 (Latest) BIS Elect meter with cellular or RF meter with RF based mesh networking and OEM shall provide necessary API's(Application Programming Interface) for integration of same with the software. (e) Contractor/OEM shall be responsible for taking necessary clearance from Stn cyber cell before installation/commissioning of software.
Supplying, Fixing, Commissioning and testing of desktop computer having the following specifications complete all as specified and directed by Engr-in-Charge :- (a) 8GB RAM, DDR 4 RAM with Genuine Windows 10 Operating system (Latest) or higher version. (b) Intel Processer with 8th Gen core i5 processor with min speed of 1.3 GHz (c) Hardware storage of min 1TB (d) Screen size of min 15 inches of black in color with full HD display (1920 x 1080), LED backlit display (e) Minimum of 4 USB ports. (f) With one Qwerty keyboard & wireless mouse. (g) UPS of min 1kVA for backup
Supplying, Installation & commissioning of black & white laser printer with Print, Scan & Copy function having USB connection with printing speed of min 40 pages per minute for printing Report complete all as specified and directed by Engr-in-Charge.
Outsourcing of services through OEM for operation, manning and comprehensive maintenance to pre-paid meters at MES premises and all related equipments as mentioned below including the keeping equipments in healthy condition by employing 01 trained semi skilled person in one shift 9 AM to 5 PM or any 8 hours shift as directed by Engr-in-Charge (Except on Sunday & holidays) having knowledge of operation of smart prepaid meter including carrying out all daily maintenance and reports all as directed by GE/Engineer-in-charge and as per Indian electricity rule / engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records, by providing with adequate details comprising of following items & equipments and comprising the pre-paid meters at military station all as specified to the entire satisfaction of GE/Engr-In-Charge.
Note :- (a) Contractor/OEM shall provide necessary training to MES staff during the period of 12 months as an when required. (b) Manning & operation will be applicable for 12 months including defect liability period mentioned against each items respectively from the date of completion of work & it shall include following scope of maintenance and operation:- (i) Single phase Elect Smart meters -115 Nos (ii) Three phase Elect Smart meters -02 Nos (iii) Elect Meter data management connectivity including DCU and RF repeater. (iv) Computer, Printer and all allied accessories. (v) DCU SIM cards. (vi) Provision of stationery, printer cartridge, registers etc all as directed by Engr-in-Charge. All miscellaneous charges shall be included in the scope. No separate charges shall be paid to contractor in this regard during contractual period.
Taking down old unserviceable submain wiring and M&L for sub main wiring with two run of 6.0 Sqmm single core PVC insulated, unsheathed FRLS cable of specified sized with multi stranded copper conductor 1100 volt grade IS-694 drawn through and including non metallic PVC conduit pipe medium grade ISI marked along with fittings and accessories all fixed on surface of wall in casing capping/ concealed wiring and the specified runs of specified size earth continuity conductor of similar type of cable complete all as specified and directed. Note: Two run of 6.0 Sqmm + 1 run of 6.0 Sqmm cable as earth continuity in PVC conduit with accessories shall be measured as one unit.
SANWARIYA ENTERPRISES
M/s SUNIL ENTERPRISES
industrial suppliers
m/s sharma constructions
ABHOG INFRASTRUCTURE PRIVATE LIMITED
HUMERS INFRATECH
naveen enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .