Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance SIMPLEX COLONY MATWAI PO SHAHPUR WAIDHAN DISTT SINGRAULI M P 486892 | SINGRAULI | MADHYA PRADESH | 486892 | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹6 LAdmitted-Finance LAXMI MARKET JAYANT ALAKHRAJ BHAVAN NEAR MAMTA MOTOR BHUSA MORE PO JAYANT DIST SINGRAULI MP 486889 | SINGRAULI | MADHYA PRADESH | 486889 | ₹6 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical BUS STAND BEENA SONEBHADRA U P 231220 | SONBHADRA | UTTAR PRADESH | 231220 | - | - | Rejected-Technical technically disqualified |
| Sl No | Description | Qty | Unit | M/s S.S.Yadav L1 | M/S. UMASHANKAR PANDEY L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling and removing of 12"/10" dia M S pipe line including transportation, cutting and stacking etc. as per instruction of Engineer In Charge (Stacking in 500Mtr range as per instruction of Engg Incharge) (All consumable are provided by contractor except DA and Oxygen) | 2,500 | Mtr. | 25 ₹62,500 | 60 ₹1.5 L |
| 2.00 | Laying and jointing of 12"/10" dia M S pipe line (Old or new) including transportation, cutting and welding etc. as per instruction of Engineer In Charge (All consumable are provided by contractor except DA and Oxygen) | 3,000 | Mtr. | 120 ₹3.6 L | 150 ₹4.5 L |
| 3.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹7.7 L
EMD Value
₹9,700
Closing Date
15 Dec 2025, 5:00 pmClosed
GM(ENM), DCH
PO-KHADIA, DISTRICT-SONEBHADRA, UP- 231222
Laying and dismantling of pipeline in Turra coal seam (Central and East entry) on as and when required basis in other than monsoon of Dudhichua Project
2025_NCL_348561_1
DCH/EnM/Tender/FLD/25-26/035
Open Tender
Miscellaneous Works
243 days
DUDHICHUA, NCL
Please refer tender documents.
4 documents required · 4 mandatory
₹9,700
12 Feb 2026
4 Dec 2025
16 Dec 2025
4 Dec 2025
15 Dec 2025
5 Dec 2025
4 Dec 2025 - 8 Dec 2025
Dismantling and removing of 12"/10" dia M S pipe line including transportation, cutting and stacking etc. as per instruction of Engineer In Charge (Stacking in 500Mtr range as per instruction of Engg Incharge) (All consumable are provided by contractor except DA and Oxygen)
Laying and jointing of 12"/10" dia M S pipe line (Old or new) including transportation, cutting and welding etc. as per instruction of Engineer In Charge (All consumable are provided by contractor except DA and Oxygen)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_361281.xls
BOQ • 0.26 MB
LOB035.pdf
Tender Documents • 0.11 MB
Download all tender documents and submit your bid