Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | ₹4.1 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹4.2 L+₹10,553.93 (2.58%)Accepted-Finance NOT SPECIFIED IN THE DOCUMENT | ₹4.2 L+₹10,553.93 (2.58%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹4.5 L+₹39,514.71 (9.65%)Accepted-Finance | ₹4.5 L+₹39,514.71 (9.65%) | L3 | Accepted-Finance Accepted |
| 4 | L4₹4.5 L+₹40,565.10 (9.90%)Accepted-Finance | ₹4.5 L+₹40,565.10 (9.90%) | L4 | Accepted-Finance Accepted |
| 5 | L5₹4.6 L+₹52,769.65 (12.9%)Accepted-Finance 122 SAMHARIYA ASOPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | ₹4.6 L+₹52,769.65 (12.9%) | L5 | Accepted-Finance Accepted |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
25 May 2026, 6:00 pmClosed
EO
Municipal Board Sangaria
Flooring work in Mahatma Gandhi Government School No 02 408828 Ward No 10 Municipal Board Sangaria
2026_DLB_558687_2
1334 date 13-05-2026
Open Tender
Civil Works
Percentage
30 days
sangaria
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO/MDRISL
₹10,000
Yes
10 Jun 2026
13 May 2026
26 May 2026
13 May 2026
25 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 99 | cum | 445 | ₹44,055 |
| 2 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 33.75 | cum | 2,955 | ₹99,731.25 |
| 3 | Providing and fixing of precast concrete interlocking tiles of desired shape of M 30 grade manufactured from fully computerized automatic stationery hydraulic vibrio pressed machine and fully computerized automatic batching plant of class A1/A2 as per BS 6717:2001. The CC interlocking paving blocks be laid on average 50mm. thick bed of coarse sand and the joint is to be filled with fine sand. Laying procedure on compacted sub-base as defined. Complete job is to be executed as per the instruction of Engineer in-charge. The rates to be inclusive of all lead & Lifts etc. complete as per specifications. Tensile splitting strength, abrasion and braking load etc. as per BS 6717:2001, Grey cement 80mm thick | 450 | sqm | 792 | ₹3,56,400 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Aggrement_Corrigendum.pdf
Tender Documents • 3.73 MB
LabourCessOrder.pdf
Tender Documents • 0.52 MB
BOQ_994630.xls
BOQ • 0.28 MB
newAgreement2016.PDF
Tender Documents • 2.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .