Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1Accepted-AOC | ₹1 | 1 | Accepted-AOC ok |
| 2 | 2₹2+₹1 (100.0%)Rejected-AOC 146 SULABHPURAM COLONY OPP COLONY VILL AGRA TEH AGRA DISTT AGRA 2022R8349 | AGRA | AGRA | ₹2+₹1 (100.0%) | 2 | Rejected-AOC ok |
| 3 | Not Admitted-Fee/PreQual/Technical 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sh. Kumarji Lal Contractor L1 | VATAVARAN TECHNO L2 |
|---|---|---|---|---|---|
| 1.00 | Operation and maintenance of water supply scheme 32MLD water treatment plant at Badli for Nuh Nalhar
Medical College Nuh Town and Surrounding 17 No.
Villages and Farrukh Nagar. Pataudi, Haily Mandi alongwith 11 No. villages District Gurugram along with civil structures, all mechanical and electrical components, inlet channel size 1200 mm NP3 585 Mtr. and 100 mm i/d to 900 mm i/d DI Pipeline. Time period of Operation and Maintenance 36 Months from date of commencement..
1st year........................... | 1 | Job | 1,01,21,895 ₹1,01,21,895 Lowest | 1,60,00,000 ₹1,60,00,000 |
| 2.00 | Operation and maintenance of water supply scheme 32MLD water treatment plant at Badli for Nuh Nalhar
Medical College Nuh Town and Surrounding 17 No.
Villages and Farrukh Nagar. Pataudi, Haily Mandi alongwith 11 No. villages District Gurugram along with civil structures, all mechanical and electrical components, inlet channel size 1200 mm NP3 585 Mtr. and 100 mm i/d to 900 mm i/d DI Pipeline. Time period of Operation and Maintenance 36 Months from date of commencement..
2nd year........................... | 1 | Job | 1,04,25,552 ₹1,04,25,552 Lowest | 1,20,00,000 ₹1,20,00,000 |
| 3.00 | Operation and maintenance of water supply scheme 32MLD water treatment plant at Badli for Nuh Nalhar
Medical College Nuh Town and Surrounding 17 No.
Villages and Farrukh Nagar. Pataudi, Haily Mandi alongwith 11 No. villages District Gurugram along with civil structures, all mechanical and electrical components, inlet channel size 1200 mm NP3 585 Mtr. and 100 mm i/d to 900 mm i/d DI Pipeline. Time period of Operation and Maintenance 36 Months from date of commencement..
3rd year........................... | 1 | Job | 1,07,38,318 ₹1,07,38,318 Lowest | 1,10,00,000 ₹1,10,00,000 |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
3 Jul 2025, 5:00 pmClosed
NITIN MODI
Gurgaon PHED
Operation and maintenance of water supply scheme 32 MLD water treatment plant at Badli for Nuh Nalhar Medical College Nuh Town and Surrounding 17 No. Villages and Farrukh Nagar. Pataudi, Haily Mandi along with 11 No. villages District Gurugram along
2025_HRY_452140_1
202506C2E02C DFAE 4A10 9C2F 814CF776B2CF557PUH
Open Tender
Civil Works
Works
1095 days
Farukh Nagar
2 documents required · 2 mandatory
₹15,000
Yes
₹7.0 L
Yes
26 Aug 2025
12 Jun 2025
4 Jul 2025
12 Jun 2025
3 Jul 2025
12 Jun 2025
Amount
Operation and maintenance of water supply scheme 32MLD water treatment plant at Badli for Nuh Nalhar Medical College Nuh Town and Surrounding 17 No. Villages and Farrukh Nagar. Pataudi, Haily Mandi alongwith 11 No. villages District Gurugram along with civil structures, all mechanical and electrical components, inlet channel size 1200 mm NP3 585 Mtr. and 100 mm i/d to 900 mm i/d DI Pipeline. Time period of Operation and Maintenance 36 Months from date of commencement.. 1st year...........................
Operation and maintenance of water supply scheme 32MLD water treatment plant at Badli for Nuh Nalhar Medical College Nuh Town and Surrounding 17 No. Villages and Farrukh Nagar. Pataudi, Haily Mandi alongwith 11 No. villages District Gurugram along with civil structures, all mechanical and electrical components, inlet channel size 1200 mm NP3 585 Mtr. and 100 mm i/d to 900 mm i/d DI Pipeline. Time period of Operation and Maintenance 36 Months from date of commencement.. 2nd year...........................
Operation and maintenance of water supply scheme 32MLD water treatment plant at Badli for Nuh Nalhar Medical College Nuh Town and Surrounding 17 No. Villages and Farrukh Nagar. Pataudi, Haily Mandi alongwith 11 No. villages District Gurugram along with civil structures, all mechanical and electrical components, inlet channel size 1200 mm NP3 585 Mtr. and 100 mm i/d to 900 mm i/d DI Pipeline. Time period of Operation and Maintenance 36 Months from date of commencement.. 3rd year...........................
VATAVARAN TECHNO (BID ID -1288727)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.27 MB
Tenderdocument.pdf
Tender Documents • 0.42 MB
Tenderdocument_2.pdf
Tender Documents • 3.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .