| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance 1A 20 EAST SEERANAGAPALAYAM ROAD SALEM 63607 | 63607 | ₹1.2 Cr | L1 | Accepted-Finance Lowest quoted |
| 2 | L2₹1.3 Cr+₹6.1 L (4.96%)Rejected-Finance | ₹1.3 Cr+₹6.1 L (4.96%) | L2 | Rejected-Finance Highest quoted |
| Sl No | Description | Qty | Unit | M/s. T.KOLANDAIVELU AND CO L2 | VRV CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 727 | m3 | 137 ₹99,599 | 130 ₹94,510 Lowest |
| 1.10 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 659 | m3 | 2,337 ₹15,40,083 | 2,226 ₹14,66,934 Lowest |
| 1.20 | Charges for Cutting the BT Surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen iterms etc, complete. as per the direction of the departmental officers | 5,902 | m2 | 112 ₹6,61,024 | 107 ₹6,31,514 Lowest |
| 1.30 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 21 | m3 | 4,573 ₹96,033 | 4,355 ₹91,455 Lowest |
| 1.40 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 7,270 | m2 | 87 ₹6,32,490 | 83.2 ₹6,04,864 Lowest |
| 1.50 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 7,270 | m2 | 19 ₹1,38,130 | 18.2 ₹1,32,314 Lowest |
| 1.60 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 9,335 | m2 | 28 ₹2,61,380 | 26.6 ₹2,48,311 Lowest |
| 1.70 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 364 | m3 | 10,882 ₹39,61,048 | 10,364 ₹37,72,496 Lowest |
| 1.80 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 499 | m3 | 11,227 ₹56,02,273 | 10,692 ₹53,35,308 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
17 Oct 2025, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem.
Restoration of Damaged BT Road in Division No. 1, 21, 22 , 23 of Suramangalam Ward Office. (Package-1)
2025_MAWS_612592_1
E4-Est No 96-R-2024-2025
Open Tender
Civil Works
Lump-sum
45 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.5 L
SALEM CITY MUNICIPAL CORPORATION
24 Oct 2025
9 Oct 2025
17 Oct 2025
9 Oct 2025
17 Oct 2025
9 Oct 2025
13 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .