| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.7 LAdmitted-Finance | ₹5.7 L | L2 | Admitted-Finance |
| 3 | L3₹5.8 LAdmitted-Finance | ₹5.8 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical MSME Certificate not as per NIT,Registration certificate not validand not submitted Origina Certified copy of documents in Division Office as per NIT Condtions |
| Sl No | Description | Qty | Unit | PRASANTA KUMAR BURMA L3 | BADAL CHAKRABORTY L1 | BIBEKANANDA PATRA L2 |
|---|---|---|---|---|---|---|
| 1.00Sub-Head : Dismantling and Demolishing | ||||||
| 1.01Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | ||||||
| 1.02 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4 | One Cubic Metre | 2,400 ₹9,600 | 1,200 ₹4,800 | 2,000 ₹8,000 |
| 2.00Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. | ||||||
| 2.01 | In cement mortar | 9 | One Cubic Metre | 2,000 ₹18,000 | 1,000 ₹9,000 | 1,700 ₹15,300 |
| 3.00Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): | ||||||
| 3.01 | From brick work in cement mortar | 1.6 | 1000 nos | 6,500 ₹10,400 | 2,000 ₹3,200 | 5,000 ₹8,000 |
| 4.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 6 | One Cubic Metre | 250 ₹1,500 | 250 ₹1,500 | 173 ₹1,038 |
| 5.00Sub-Head : Earth Work | ||||||
| 5.01Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
Tender Value
₹5.7 L
EMD Value
₹11,400
Closing Date
4 Apr 2026, 3:00 pmClosed
Nodal Officer (Tender)
3rd floor DSB Unit 9 BBSR 22
Construction of damaged compound wall of TE Building, Meramundali.
2026_BSNL_272654_1
67/CE(C)/2025-26/BCD/CTC
Open Tender
Civil Works
60 days
TE Meramunduli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Accounts Officer (Cash) BSNL O/oPGMTD Cuttack
₹11,400
Yes
9 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
23 Mar 2026 - 4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Sub-Head : Dismantling and Demolishing | ||||||
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | - | - | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | One Cubic Metre | - | - | BI01010001010000000000000515BI0100001114 |
| 2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. | ||||||
| 2.01 | In cement mortar | - | One Cubic Metre | - | - | BI01010001010000000000000515BI0100001116 |
| 3Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): | ||||||
| 3.01 | From brick work in cement mortar | - | 1000 nos | - | - | BI01010001010000000000000515BI0100001118 |
| 4Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | ||||||
| 5Sub-Head : Earth Work | ||||||
| 5.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
technical_318165.pdf
techsummary_318165.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tender67.pdf
Tender Documents • 1.76 MB
BOQ_318165.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid