| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-Finance | ₹13.8 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹14.7 LAccepted-Finance 7 33J 11F GANESH NAGAR WEST M SAVERIAR PURAM MUTHIAHPURAM TUTICORIN 628 005 | TUTICORIN | TAMIL NADU | 628005 | ₹14.7 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | A.SEKAR CONTRACTOR | SRI GOKUL ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth. | 110.46 | M3 | 13,255.2 ₹15,641.14 | 11,377.38 ₹13,425.31 |
| 2.00 | Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of labour, lead, lift, etc. complete. | 31.56 | M3 | 2,524.8 ₹2,979.26 | 1,704.24 ₹2,011 |
| 3.00 | Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete | 27.01 | M3 | 1,80,967 ₹2.1 L | 1,73,944.4 ₹2.1 L |
| 4.00 | R.R Masonry in C.M.1:5 including cost of all materials, labour, lead, lift, curing, etc. complete. | 116.03 | M3 | 8,12,210 ₹9.6 L | 7,92,484.9 ₹9.4 L |
| 5.00 | Pointing the RR Masonry wall with C.M 1:5, including cost of all materials, labour, lead, lift, curing, etc. complete. | 352.35 | M2 | 1,40,940 ₹1.7 L | 1,27,550.7 ₹1.5 L |
| 6.00 | Providing RCC 1:1.5:3 using OP/ PP Cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing etc., complete – excluding cost of reinforcement and form work. | 12.9 | M3 | 1,43,190 ₹1.7 L | 1,41,255 ₹1.7 L |
| 7.00 | Supplying & Providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc., complete. | 973.5 | Kg | 1,46,025 ₹1.7 L | 1,01,244 ₹1.2 L |
| 8.00 | Providing Shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift tools, etc., complete. | 43.8 | M2 | 28,470 ₹33,594.60 | 26,367.6 ₹31,113.77 |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
5 Jan 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Repair and Rectification Works to the Drain along 263 S Road from PCH 1 West side to 263 S Road Culvert area at TTPS
2025_EB_631755_1
CE SE C TTPS Spec.No. 354 25 26
Open Tender
Civil Works - Others
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,000
Yes
7 Jan 2026
12 Dec 2025
6 Jan 2026
12 Dec 2025
5 Jan 2026
12 Dec 2025
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth.
Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of labour, lead, lift, etc. complete.
Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete
R.R Masonry in C.M.1:5 including cost of all materials, labour, lead, lift, curing, etc. complete.
Pointing the RR Masonry wall with C.M 1:5, including cost of all materials, labour, lead, lift, curing, etc. complete.
Providing RCC 1:1.5:3 using OP/ PP Cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing etc., complete – excluding cost of reinforcement and form work.
Supplying & Providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc., complete.
Providing Shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift tools, etc., complete.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_755607.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid