Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.7 Cr
EMD Value
₹17,200
Closing Date
30 Nov 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE(CIVIL)
CIVIL WORKS CIRCLE,OPTCL,BBSR
Improvement to compound wall at 220/33 KV GSS Balimela (Providing Reconstruction of broken part, providing concertina coil, repairing and painting)
2026_OPTCL_146078_6
ETCN 07 of 26-27
Open Tender
Civil Works - Others
Percentage
120 days
Balimela
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SE(CIVIL),CIVIL WORKS CIRCLE,OPTCL
₹17,200
Yes
16 Nov 2026
16 Nov 2026
4 Dec 2026
16 Nov 2026
30 Nov 2026
16 Nov 2026
16 Nov 2026 - 23 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all labour for dismantling brick masonry including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 18.33 | cum | 1,646.62 | ₹30,182.56 |
| 2 | Earthwork in excavation in hard soil on foundation trenches in all kinds of soil including moorum stony earth and earth mixed with boulder except sheet rocks and boulders requiring blasting including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and shuttering , dewatering if required etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge. | 98.32 | cum | 282.89 | ₹27,813.74 |
| 3 | Supplying all labour and T&P for cleaning and grubbing road land etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge. | 1,137.65 | sqm | 9 | ₹10,238.85 |
| 4 | Supplying all labour for removal of cement plaster including racking out joints 12mm deep etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge. | 625.79 | sqm | 58.95 | ₹36,890.32 |
| 5 | Supplying all labour with T&P for filling foundation and plinth with sand including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge. | 1.49 | cum | 557.49 | ₹830.66 |
| 6 | Supplying all labour with T&P for filling foundation and plinth with excavated material including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge. | 9.23 | cum | 155.6 | ₹1,436.19 |
| 7 | Cement concrete with (1:3:6) in foundation and floors using 40 mm ( 1 ½ ‘’) size black hard crusher broken granite stone metal of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. | 1.49 | cum | 5,771.48 | ₹8,599.51 |
| 8 | RCC (1:1.5:3) M20 grade in in following RCC members having a minimum compressive strength 20N/mm2 including centering, shuttering and finishing the exposed surfaces smooth providing grooves or beads where necessary including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects but excluding the cost of M.S. rods or tor steel and binding wires and labour charges for cutting, bending, binding and tying the grills etc complete as per the direction of the Engineer - in – charge. | 1 | cum | - | - |
| 9 | F & P | 5.66 | cum | 7,181.06 | ₹40,644.8 |
| 10 | Col and beam in F & P | 4.08 | cum | 7,181.06 | ₹29,298.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.43 MB
Tendernotice_3.pdf
PDF • 4.50 MB
Tendernotice_4.pdf
PDF • 1.16 MB
Tendernotice_5.pdf
PDF • 1.31 MB
BOQ_620732.xls
BOQ • 0.29 MB
corrigendum.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .