Executive Enginner Nyoma Division
Office of the Executive Engineer RnB Nyoma
Completion for balance work in construction of inspection hut at Analy Under state sector
2026_PWD_19374_1
85of RnB Nyoma
Open Tender
Civil Works - Buildings
Percentage
365 days
Nyoma Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
office of the Executive Enginer Rnb Nyoma
₹1.7 L
17 Aug 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
29 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 269.03 | Cum | 278.09 | ₹74,814.55 |
| 2 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size | 7.19 | Cum | 11,102.31 | ₹79,825.61 |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 36.25 | cum | 4,010.9 | ₹1,45,395.13 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and above plinth level | 719 | kg | 109.33 | ₹78,608.27 |
| 5 | Providing and fixing stainless steel (Grade 304) railing made of Hollow
tubes channels, plates etc. including welding ,grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete ,including fixing the railing with necessary accessories and stainless steel dash fasteners, stainless steel bolts etc. of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). | 200 | kg | 767.81 | ₹1,53,562 |
| 6 | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal size) | 89.48 | cum | 14,111.48 | ₹12,62,695.23 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 40.88 | sqm | 738.64 | ₹30,195.6 |
| 8 | Wooden planking, tongued and grooved in flooring including fixing with iron screws complete: 12 mm thick. Second class teak wood | 125.98 | sqm | 2,838.98 | ₹3,57,654.7 |
| 9 | Marble stone flooring with 18mm thick marble stone as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement:4 coarse sand) laid and jointed with grey cement slurry including rubbing and polishing complete with: Udaipur green marble | 44.5 | sqm | 2,165.54 | ₹96,366.53 |
| 10 | Rough cast plaster upto 10 m height above ground level with a mixture of sandand gravel or crushed stone from 6 mm to 10 mm nominal size, dashed over and including the fresh plaster in two layers, under layer 12 mm cement plaster 1:4 (1cement : 4 coarse sand) and top layer 10 mm cement plaster 1:3 (1 cement : 3fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.Ordinary cement finish using ordinary cement | 403.57 | sqm | 771.28 | ₹3,11,265.47 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_45999.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].