Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.1 LAccepted-AOC | L1 | Accepted-AOC Lowest amount Quoted tenderer | |
| 2 | L2₹39.4 L+₹1.3 L (3.47%)Rejected-AOC | L2 | Rejected-AOC Highest amount Quoted tenderer | |
| 3 | L3₹40.1 L+₹2.0 L (5.35%)Rejected-AOC | L3 | Rejected-AOC Highest amount Quoted tenderer | |
| 4 | L4₹40.5 L+₹2.4 L (6.42%)Rejected-AOC | L4 | Rejected-AOC Highest amount Quoted tenderer | |
| 5 | L5₹40.9 L+₹2.8 L (7.47%)Rejected-AOC KOMBURANKADU KARUPPUREDDIYUR POST SALEM DISTRICT | SALEM | SALEM | TAMIL NADU | L5 | Rejected-AOC Highest amount Quoted tenderer |
| Sl No | Description | Qty | Unit | V KRISHNAMOORTHY L3 | Thulasi L6 | KCP PRAKASH CONSTRUCTIONS L1 | SSM INFRA CONSTRUCTION L7 | SAMPATH R L8 | DHAKSHNAMOORTHY L9 | S.MAGALINGAM L2 | K.ANBU L10 | SELVAM & CO L5 | A.PALANIVEL L4 | KRISHNAMOORTHY L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete | ||||||||||||||
| 2.00 | Km 0/0 - 0/797 | 860.76 | Cum | 6 ₹5,164.56 | 6 ₹5,164.56 | 5.25 ₹4,518.99 | 5.7 ₹4,906.33 | 5 ₹4,303.8 Lowest | 6.35 ₹5,465.83 | 5 ₹4,303.8 Lowest | 6.35 ₹5,465.83 | 6 ₹5,164.56 | 6.36 ₹5,474.43 | 7 ₹6,025.32 |
| 3.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher | ||||||||||||||
| 4.00 | Km 0/0 - 0/797 | 298.74 | Cum | 2,099 ₹6,27,055.26 | 2,160 ₹6,45,278.4 | 2,013.9 ₹6,01,632.49 | 2,221.4 ₹6,63,621.04 | 2,400 ₹7,16,976 | 2,440 ₹7,28,925.6 | 2,061 ₹6,15,703.14 | 2,550 ₹7,61,787 | 2,150 ₹6,42,291 | 1,600 ₹4,77,984 Lowest | 2,550 ₹7,61,787 |
| 5.00Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||||||||
| 6.00 | Km 0/0 - 0/797 | 2,987.38 | Sqm | 74 ₹2,21,066.12 | 76 ₹2,27,040.88 | 70.95 ₹2,11,954.61 Lowest | 78.37 ₹2,34,120.97 | 85 ₹2,53,927.3 | 86.1 ₹2,57,213.42 | 73 ₹2,18,078.74 | 95 ₹2,83,801.1 | 85 ₹2,53,927.3 | 80 ₹2,38,990.4 | 87 ₹2,59,902.06 |
| 7.00Providing and laying Bituminous Macadam with Central Hot Mix Plant 20-30T capacity, using crushed aggregates of grading as per table 500.4 premixed with bituminous binder , transported to site upto lead of 1000m laid over a previously prepared surface Plastic waste | ||||||||||||||
| 8.00 | Km 0/0 - 0/797 | 149.37 | Cum | 7,509 ₹11,21,619.33 | 7,727 ₹11,54,181.99 | 7,202.25 ₹10,75,800.08 Lowest | 7,945 ₹11,86,744.65 | 8,730 ₹13,04,000.1 | 8,730 ₹13,04,000.1 | 7,371 ₹11,01,006.27 | 8,730 ₹13,04,000.1 | 7,682 ₹11,47,460.34 | 7,750 ₹11,57,617.5 | 8,850 ₹13,21,924.5 |
| 9.00Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||||||||
| 10.00 | Km 0/0 - 0/797 | 3,020 | Sqm | 17 ₹51,340 | 18 ₹54,360 | 16.5 ₹49,830 Lowest | 18.3 ₹55,266 | 20 ₹60,400 | 20.1 ₹60,702 | 17 ₹51,340 | 35 ₹1,05,700 | 18 ₹54,360 | 20 ₹60,400 | 25 ₹75,500 |
Tender Value
₹47.7 L
EMD Value
₹47,800
Closing Date
27 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(VP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Strengthening of Viralur to Devanur Road at Viralur Panchayat in (Km 0/0-0-797) Madhuranthagam Block under (Unauthorised Layout Regularization Development Charges) Fund for the year 2025-26
2026_RDTN_661710_1
Rc.No.4027/2025/A3 Ad(Pt) Dated 19.01.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Viralur to Devanur Road
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹47,800
Yes
16 Mar 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete | - | - | - | - |
| 2 | Km 0/0 - 0/797 | 860.76 | Cum | 6.36 | ₹5,474.43 |
| 3 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher | - | - | - | - |
| 4 | Km 0/0 - 0/797 | 298.74 | Cum | 2,441.17 | ₹7,29,275.13 |
| 5 | Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | - | - | - | - |
| 6 | Km 0/0 - 0/797 | 2,987.38 | Sqm | 86.13 | ₹2,57,303.04 |
| 7 | Providing and laying Bituminous Macadam with Central Hot Mix Plant 20-30T capacity, using crushed aggregates of grading as per table 500.4 premixed with bituminous binder , transported to site upto lead of 1000m laid over a previously prepared surface Plastic waste | - | - | - | - |
| 8 | Km 0/0 - 0/797 | 149.37 | Cum | 8,730.86 | ₹13,04,128.56 |
| 9 | Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | - | - | - | - |
| 10 | Km 0/0 - 0/797 | 3,020 | Sqm | 20.11 | ₹60,732.2 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Technicalbid.pdf
Tender Documents • 0.43 MB
PriceBID.pdf
Additional Documents • 0.32 MB
BOQ_794266.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .