Tender Value
₹2.4 Cr
EMD Value
₹3.6 L
Closing Date
5 May 2026, 10:00 pmClosed
Hubli Electricity Supply Company Limited
NAGAPPA C BELAKERI
Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis
HESCOM/2025-26/EL/WORK_INDENT1112
HESCOM/2025-26/EL/WORK_INDENT1112
Open
Electrical
Two Tender Document System(Two Cover)
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
20 documents required · 20 mandatory
The bidder should have executed work of installation and commissioning of minimum of Two No. 5MVA and above higher capacity power transformers of 33/11KV and above voltage class with associated switchgears and ODS on Total Turnkey or Partial turnkey or labour Contract basis in any one of the in the last Five Financial Years. ((i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24) on Total Turnkey/Partial Turnkey Basis/ Labour contract basis /self-execution basis in any State/ Central Govt. Distribution Companies / PSUs.Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV
The Bidder should have achieved in at least Two financial year, a minimum financial turnover of not less than Two Times the amount put to tender in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25).The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection. Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited
The cash at bank, term deposits and availability of fund based credit facilities shall not be less than 30% of the amount put to tender (Rs. 71.42Lakhs)shall be supported by a certificate issued by Nationalized/ scheduled Bank as per the Annexure format attached shall be uploaded.If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office,HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid.ANNEXURE.The conditional credit certificates are liable for rejection.
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving work of installation and commissioning of 5MVA and above higher capacity power transformers 33/11KV and above voltage class of value not less than 50% of the amount put to Tender in of Rs.119.44 lakhs any State/Central Govt./ Distribution Companies/PSUs in the last Five Financial Years(i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24).As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids. The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works & its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses.The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer (Ele).33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
₹5,000
₹3.6 L
5 May 2026
5 Apr 2026
6 May 2026
9 Apr 2026
10 Apr 2026
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '13 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B
Where 'N'=13months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23,2023-24,2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "13 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale in Bhatkal Taluk, Uttar kannada District on Total Turnkey basis.
Bid Indent NO: HESCOM/2025-26/EL/WORK_INDENT1112
Bidder’s Name and Address (Sole Bidder) : To:
Superintendent Engineer El, Project Monitoring Cell, Corporate Office, HESCOM, Hubli. - 580025
We declare that the ratings, performance figures and availability of the system furnished by us for subject Package covered under this specification are guaranteed by us. We further declare that in the event of any deficiencies in meeting the guarantees in respect of the characteristics mentioned below as established after conducting the factory test, you may at your discretion, reject or accept the equipment after assessing the liquidated damages as specified in the relevant clauses of Bid document.
Equipment Guaranteed losses at rated output (KW per unit)
Copper/Aluminium Loss at 75 degree C at rated current Iron loss at rated voltage and frequency
Distribution Transformers:
8 MVA, 33/11 KV, 3ph.Power transformer
Date : (Signature)
Place : (Printed Name)
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis.
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST)
2 Labour charges+ Decommissioning (Exclusive of GST)
3 Civil Engineering Charges (Exclusive of GST)
5 Specila Locality Allowance @ 12% on SI No 4
6 GST @ 18% on Si no 4 & 5
7 Cost of the Estimate /APT (Without GST)
% age of tender compenents included
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
Executive Engineer,Elecl, Superintending Engineer,Elecl, Chief Engineer,Elecl,
33 KV S & L Division, O & M Division, HESCOM. O & M Zone,
HESCOM, Belagavi Chikkodi HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District.
Sl. No Particulars Amount
1 Materials cost 18448912
2 Labour charges (Erection & Dismantaling) 667105.8
3 Electrical Civil works & Civil Engineering Charges 3021737.016
4 Sub Total Estimate cost in Rs.(1)+(2)+(3) 22137754.816
5 Specila Locality Allowance @ 12% Sl No.(4) 2656530.57792
6 Sub Total Estimate cost in Rs. (4)+(5) 24794285.39392
8 Statutory charges as per actual (Inspectorate charges, civic body charges etc.,) 35000
9 Sub Total Estimate cost in Rs. (6)+(7)+(8) 29292256.7648256
10 CESS at the rate of 1% on the cost of construction. 292922.567648256
11 Total Cost in Rs. (Sum of item N. (9) to (10) 29585179.332473855
Report: This estimate amounting to Rs.2,95,85,179( Two Crore Ninty Five lakhs Eighty Five thousand One Hundred and Seventy Nine Only) is prepared for providing additional 2X 8 MVA, 33/11 KV Power Transformer at 33/11 KV Sub-station Hebale in Bhatkal Taluk. uttar kannada District. The existing 110/33/11kV S/S Murdeswar is fed from 110/33/11kV S/S Honnavar with peak load of 19MW, on 110kV Honnavar-Murdeswar SC line on SC tower. 110/33/11kV S/S Honnavar is fed from 110/33/11kV S/S Kumata by LILO arrangement. 110/33/11kV S/S Kumata is fed from 2X100MVA, 220kV R/S Karwar on 110kV Karwar- Kumata SC line on SC tower with peak load of 57MW. During the contingence, the existing 110/33/11kV S/S Kumata is also fed from 110/11kV S/S Sirsi on 110kV Sirsi- Kumata DC line. Uttar Kannada district geographically comprises of thick forests, rivers & Sea belt. There are 2 No.s of Sub-station namely 33/11kV S/S Bhatkal & 110/33/11kV S/S Murdeswar in Bhatkal Taluk. The 33/11kV S/S Bhatkal having capacity of 4x5MVA transformer with a peak load of 13.5MW. It is fed from 110/33/11kV S/S Murdeswar on 33kV SC line for a distance of 16.536km. Bhatkal taluk and surrounding villages are fed from 33/11kV S/S Bhatkal by 10 Nos. of 11kV feeders namely 11kV Urban, 11kV Semi Urban, 11kV Marukeri, 11kV Belke, 11kV Tengingundi, 11kV Sagar Road,11kV Jali, 11kV Nirkantha, 11kV Sarpankatte & 11kV kamakshi with a peak load of 110Amps, 170Amp, 100 Amps, 120Amps, 52Amp, 120Amps, 50Amps, 20Amps, 87Amps &35Amps, respectively. Bifurcation of existing feeders/ Drawing express line from 33/11kV S/S Bhatkal cannot be possible, due to space constraint for augmentation of associated 11kV & 33kV lines, because of existing residential buildings, Mosque, Schools around the existing 33kV Sub-station. Hence there is no alternative arrangement for augmentation. Further all 11kV feeders are reconductored by rabbit conductor. Since Bhatkal is one of most sensitive area in Karnataka state.
4th 5MVA, 33/11kV Transformer was commissioned in the month og March-2025. because of overloading of existing transformer. Since the load is drastically increasing day by day. It is not managabe even by existing 4 no. of 5MVA, 33/11kV Transformers.Whenever main supply fails or Maintenance work scheduled in the 33/11 kV Bhatkal sub-station , load shedding on few 11kV lines shall be imposed till the normalcy of load on all 4 No. 5 MVA, 33/11kV Transformer achieved. Further, construction of 2X10MVA, 110/11kV sub-station is under progress at Bhatkal. Due to some constarint like forest , private land through which proposed 110kV line pases , the work has been slown down. Even , 110kV Bhatkal Sub-station come inforse, the existing 33/11kV Sub-station shall be retained to cater the future load growth of Bhatkal taluk. At present load can not be cattered effectively by existing 4 no. of 5MVA, 33/11kV Transformers, it is necessary to replace the 2 No. of 5MVA, 33/11kV Transformers by 2 No. of 8MVA, 33/11kV Transformers. All the necessary provisions for materials & labour, Civil works, fencing and leveling of land and transportation are made in this estimate. This work is to be included in the annual capital budget-2025-26. Hence this estimate may kindly be sanctioned at an early date.
Certificate:- Certified that I have personally visited the site and prepared the estimate by using current MWSR/HESCOM SR/KPWD SR and market rates for most economical and safe way of ecxecutiing the work.
Asst. Executive Engineer, (El) Junior Engineer, (EL)
33KV S & L Division. HESCOM, Karwar. 33/11KV MUSS Hebale
Executive Engineer(E)
33KV S & L Division. HESCOM, Karwar.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis.
Part : A Material Portion
Sl. No. Particulars Unit Qty Rate Amount
1 Power Transformer: 33/11KV, 8 MVA, DELT/STAR, DY 11, 3Ph, 50Hz,Core type winding with OLTC, RTTC panel etc., complete filled with Transil Oil and 10% spare Oil in Non Returnable Drums. (KPTCL SCHEDULE OF RATES 2023-24, Page No:499 SL No:1.1.01.) Nos 2
2 Current Transformer:
a) 33kV class CT with 0.2 accuracy class, 400-200/1-1-1A for Line. (KPTCL SCHEDULE OF RATES 2023-24, Page No:31 SL No:5.2.15.) Nos 6
b) 11kV NCTs 600-300/1-1-1A (KPTCL SCHEDULE OF RATES 2023-24, Page No:31 SL No:5.2.19.) Nos 2
Coyote ACSR Conductor with 1.5% Sag [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 44 Sl No.20.6] km 0.2
a) 33/11kV Transformer Panel (Simplex) ( KPTCL SCHEDULE OF RATES 2023-24, Pg No. 41, 16.1.7) Note: Rate is not given in the CSR 2023-24 hence rate given to 33/0.433 kV Transformer Panel is considered for this) Nos 2
b) AC Distribution Box Single front (Outdoor type)6 Terminal, one I/C of 100A MCCB 20kA + 6 O/GMCB 16A + 1 O/G of 100A, HRC fuse, complete as per technical specification..(KPTCL SR 2023-24, Page No:39, SL No: 11.2.1 ) Nos 1
c) DC distribution panel (Indoor) as per technical specification comprising of earth fault indicator, indication circuti for AC mains failure, 1 No 100A SFU for 1/C + 12 Nos 32A SFU of O/G. (KPTCL SCHEDULE OF RATES 2023-24, Page No:39, SL No: 11.2.3 ) Nos 1
5 33 KV Station Structure
Fabrication, Galvinisation and Supply of Station Structures: 3T1 33kV ODS As per KPTCL SR-Material portion, PG No 43 Sl.No:.18.1 (0.599X4=2.396MT) MT 0
Fabrication, Galvinisation and Supply of Station Structures: 3B1 for 33kV ODS As per KPTCL SR-23-24Material portion, PG No 43 Sl.No:.18.1(1.936X8=1.936MT) MT 0
6 33KV SF-6/ Breakers:
66 kV, 40 kA class, SF-6 Circuit Breaker with terminal connector suitable for Al. tube/conductor with spring/semi-pneumatic/pneumatic type operating mechanism and mounting structure etc., as per technical specification. Nos 2
7 a) Control Cable with Accessories: (With glands/lugs/ferruels)
i) 19 Core 2.5 Sq.mm. [KPTCL SCHEDULE OF RATES 2023-24, Pg. No.40, Sl No. 13.16] Mtrs 400
ii) 4 Core 6 Sq.mm [KPTCL SCHEDULE OF RATES 2023-24, Pg. No.40, Sl No. 13.8] Mtrs 200
iii) 4 core 2.5 Sq.mm [KPTCL SCHEDULE OF RATES 2023-24, Pg. No.40, Sl No. 13.6] Mtrs 200
iv) 2 core 2.5 Sq.mm [KPTCL SCHEDULE OF RATES 2023-24, Pg. No.40, Sl No. 13.1] Mtrs 500
8 Supplying and Erection (as per approved design and drawing)
a) Caution/Danger Board. Nos 5
b) Name Plates for equipment/Earth Pit Nos 4
Total Rs. Station (Materials)
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis.
Part : B Electrical Erection Portion
Sl. No. Particulars Unit Qty Labour Cost Total Labour Cost
1 ERRECTION OF POWER TRANSFORMERS:
a a) Moving the transformers on to the plinth to a (Maximum allowable distance is 50 mtrs.) more than 50 mtrs. approval of the CEE, O&M Zone has to be obtained) (16.0 MT X 80 Mtr=640 MT/Mtr). As per KPTCL SR-Labour Portion, PG No 116 Sl.No:9 a Mt/mtr 1280
b b) i) Assembly of 5 MVA. Power transformers parts like bushing, radiators, conservators, tank, filling oil into transformer for total weight of the transformer. As per KPTCL SR-Labour Portion, PG No 116 Sl.No:9 b MT 32
c ii) Filtration of oil using filter set of the contactor to bring the insulation value to IE specifications. As per KPTCL SR-Part-I, PG No 116 Sl.No:9 d Ltr 10000
d C) Wiring of transformer marshalling box, Bucholtz relay, fixing thermometer, OLTC upto control panel and assisting in testing and commissioning by RT/MT/firm Engineers. As per KPTCL SR-Labour Portion, PG No 116 Sl.No:9 F i Per Transformer 2
2 a) ERECTION OF CIRCUIT BREAKERS
a) Erection, assembly, alignment and inter pole wiring of breakers with its inter connected equipments including movement from the point of unloading to the point of erection i) 33KV Circuit Breakers. As per KPTCL SR-Labour Portion, PG No 117 Sl.No:13 a Per Set 2
Assisting in testing and commissioning i) 33KV Circuit Breakers. As per KPTCL SR-Labour Portion, PG No 117 Sl.No:13 b Per Set 2
Wiring:Identification, ferruling, crimpingand termination of wires inBreaker limbs, marshalling box& wiring up to controlpanel/relay panels, extension of earth mat etc.,As per KPTCL SR-Part-I, PG No 116 Sl.No:13 c Per Set 2
3 Current Transformer:
a a) Erection of CTs and wiring including movement from the point of unloading to the point of erection. As per KPTCL SR-Part-I, PG No 118 Sl.No:14 a Set 2
b) Assisting in Testing and Commissioning i) 33KV CT PTs . As per KPTCL SR-Part-I, PG No 118 Sl.No:14 a Set 2
b c)Wiring:Inspection of wiring, ferruling,crimping of lugs, connections inCT PT, marshalling box & controlpanel, extension of earth matetc.,As per KPTCL SR-Labour Portion, PG No 118 Sl.No:14 c Set 2
4 a Erection of NCT
a) Erection of NCT with grounding connections including movement from point of unloading to the point of erection. As per KPTCL SR-Labour Portion, PG No 118 Sl.No:15 a Nos 2
b) Assisting in Testing and Commissioning. As per KPTCL SR-Labour Portion, PG No 118 Sl.No:15 c Nos 2
c) Testing and Commissioning ofNCTs: Insulation Resistance,Polarity, Ratio, Excitation, CoreIdentification, Tan-Delta and Capacitance Test) As per KPTCL SR-Labour Portion, PG No 118 Sl.No:15b Nos 2
Bus Bar formation: Formation of Main/cross bus in each individual bay using Lynx/Coyote - Single/Double conductor with fixing of insulators, spacers, levelling the strung conductors to the required height above the equipment including providing jumps to inter-connect different segments of the main bus.As per KPTCL SR-Labour Portion, PG No 122 Sl.No:25 Per Bay 0
6 a Errection of Mounting Structures:
Erection, alignment & assemblyof fabricated steel latticestructure, pedestal structures &mounting structures for GOS,CTs, PTs, LAs etc.,As per KPTCL SR-Labour Portion, PG No 116 Sl.No:8 b MT 5723
7 Control Panels
a) a) Erection of control panels, auxilary panels, carrier cabinets etc., alignment and fixing properly to foundation base including movement from the point of unloading to the point of erection. i) 5MVA, 33/11KV transformer. KPTCL SR-Labour Portion, PG No 120 Sl.No:23 a Panel 2
b) b) Assisting in testing andcommissioning of panel i) 8MVA, 33/11KV transformer. KPTCL SR-Labour, PG No 120 Sl.No:23 b Panel 2
c) c) Wiring & assisting in testing & commissioning of Panels i)8MVA, 33/11KV transformer. KPTCL SR-Labour P No 121 S.No:23 c Panel 8510
d)Testing of C&R panels:Testing for insulation level,testing of relays, controloperations for closing trippingetc., interlock. Alarmannunciation & indicationchecks. KPTCL SR-Labour Portion, PG No 120 Sl.No:23 d Panel 36425
e) ACDB KPTCL SR-Labour Portion, PG No 121 Sl.No:23 h Panel 1
f) DCDB KPTCL SR-Labour Portion, PG No 121 Sl.No:23 h Panel 1
8 Laying of Control Cables:
a) Laying of control cables from equipments to control panels/Annunciation desk, Necessary termination at both ends with ferrules, lugs etc., as per the instructions of Engineer incharge of work KPTCL SR-Labour Portion, PG No 120 Sl.No:22 b. Rmts 1050
Total Rs. Station (Erection Labour)
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis.
PART- B-( CIVIL ELECTRICAL WORKS)
Sl No Description of work Unit Qty Rates Amount
1 Earth mat formation :
i) Excavation, formation ,refilling :KSRB 2.2.6 : Excavation for foundation of buildings, water supply & sanitary lines & electrical conduits etc., either in pits or in trenches 1.50m & above in width hard rock by chiselling and / or wedging where blasting is prohibited. not excluding 150m in depth including stacking the excavated stuff clear from edges of excavation with lead upto 50m including cost of labour, HOM complete as per specifications.(2018-19 PWD Dharwad Circle SR : OM: "HESCOM/SEE(PMC)/EE-P1/2021-222/CYS-6052" issued by HESCOM ) Cmtr 299
2 i) i) Supplying and laying of MS flats of 75X12mm , welding and applying ACB paint to welded portion and covering withsodium bentonite clay, as per thedrawing/standard specifications andconsolidation. (KPTCL SR-LABOUR, PG No 123 Sl.No:26 b) Mtrs 800
ii) ii) G.I. Flats 50x6 mm for earth connection, KPTCL SR-23-24, P,No: 197, Sl,No; 26 (f) i Mtrs 200
iii) iii) Cast Iron pipes electrode of 100 mm internal dia. 13 mm thick 2.75 Mtr. long including RCC collars of 450 mm height and 450mm dia. 1.5 t0 2.0 inch thick, etc. as per specification. KPTCL SR-23-24, P,No: 189, Sl,No; 6 (c) I Material Cost=12792+ Labour Cost 3491= Rs, 16283 Nos. 10
iv) iv) MS Rod of 25mm dia and 1 Mtr long, KPTCL SR-23-24, P,No: 197, Sl,No; 26 (g) i Nos 25
v v)Supplying & providing 450 dia, 450 MM height 1.5" to 2" thick hume pipe collar (non pr type) for earthpits including lead & lift Nos 10
3 i) Transformer foundation and associated rail track:
Desighn, Engineering, supply of material / equipment, labour and construction of Tr. Foundation by providing all associated works, rail tracks jacking pads, anchor block RCC, PCC misscellaneous structure steel including MS, grounting gravel filling pylon support system and other items not mentioned herein, but required for the completion of the work as per the technical specification and drawings.
8MVA, 33/11KV Transformer. (3.0*3.0*1.5*1.0=13.5CMT)* 338.00 Hard soil Rate =4563 + Concreting 13.5CMT*5441=73453.50 ( Excavation Rs,4563+ Conctreting 73453.50= Total Rs,78016.50 Nos. 2
8MVA, 33/11kV Power Transformer foundation bed Steel Reinforcement, PWD SR-23-24 P,No, 90, Item No; 2.11a Kgs 240
4 i) SF-6 Breaker foundation, 33KV SF-6 Breaker foundation as per approved desighn and drawing including supply of material and labour. (3.0*2.0*1.5*1.0=6.5CMT)* 338.00 Hard soil Rate =2197 + Concreting 6.5CMT*5441=35366.50 ( Excavation Rs,2197+ Conctreting 35366.50= Total Rs,37563.50 Nos. 4
5 i) Providing Deep Bore earthing:"Sinking bore of 150 mm clear dia usingfast rig including fixing of 40 mm dia MSrod, including jointing the pipes as per KPTCL standard and providing sodiumbentonite treatment in the annular space, including transportation of rig and othersupporting vehicles etc., complete, as perthe directions of engineer in charge,including cost of MS rod & sodium bentonite".
ii) Drilling 150 mm dia bore KPTCL SR-LABOUR, PG No 124 Sl.No:27 a Rmtr 120
iii) 40 mm dia MS Rod KPTCL SR-LABOUR, PG No 124 Sl.No:27 b Rmtr 120
vi) Bentonite Clay KPTCL SR-LABOUR, PG No 124 Sl.No:27 c Kg 1325
v) Cost of GI flat for joining two rods by welding to obtain continuous length KPTCL SR-LABOUR, PNo 124 Sl.No:27 d Per Joint 12
6 i) BAFFLE WALL : Design engineering and construction of baffle wall (in between transformer) with the RCC columns of 30 cmX 30 cm at ends of wall in RCC M20 concrete and connecting beams (3 No) at ground ,middle and top of wall of 23X 45 cms in M20 concrete with reinforcement as per design and foundation for colum (minimum)of 1.5 mtr depth in natural soil and upto hard ground and M20 concrete RCC footing above cc bed of 10 cms including constructing laterite masory 23 cm thick for wall (infill) up to required height and length as per site conditions including plastering,finishing painting external emulsion antifungal paint etc complete as per direction of Engineer-in-charge. ( This rate consider 33/11KV MUSS Manki Honnavar) Nos 1
7 i) BACK FILLING: Refilling available excavated earth around pipe lines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with lead upto 1.5 m including cost of all labour complete as per specifications. (KPWDSR I. No:2.11) Cum 160
8 i) INSPECTION CHAMBERS: Constructing brick masonry inspection chamber 600x850mm, and 450mm depth. (clear inside dimension for single pipe line, using table molded bricks of class designation 50 in cement mortar 1:5, C.I cover with frame (light duty) 455x610mm internal dimension, total weight of cover with frame to be not less then 38Kg (weight of cover 23kg, weight off the frame 15 kg) R.C.C top slabs with cement concrete 1:2:4 mix 20mm and down size granite metal inside pestering 12mm thick with cement mortar 1:3 finish smooth with a floating coat of cement on walls and bed concrete complete as per standard design including cost of materials, labour, curing complete as per specification (KPWDSR I.No: 11.54 Pg NO:76). No 8
9 i) Cable Trenches including road crossing :
a) Providing and constructing RCC cable ducts with slabs using cement concrete (1:2:4) including cost of excavation cable tray supports and cable trays etc., complete as per technical specificationand enclosed drawing etc., including cost of all materials, labour, etc., complete. Rmtrs 30
10 i) Road Works :
Providing and forming 5 mtr wide RCC Road including providing walk ways, fixing RCC kerb stones within sub-station as per technical specification, layout and sectional detailed drawing etc., complete in all respect. Rmtrs 25
11 i) Jelly Spreading (20-25 mm) : Supplying and providing jelly in the station yard of uniform thickness of 100 mm including the cost of materials, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer-in-charge of works as per the standard procedure. cum 120 2343.1968
Total Rs. Civil Portion
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis.
Sl No Description of work Unit Qty Rate Amount
1 Dismantaling of exisiting 2X5 MVA Power transformer
a) Releasing of Wiring Transformer marshalling box, bucholtz relay, MOG, OLTC upto control panel. (Common SR 2018-19 33KV labour Page No:16 SL No:227 It.No 49i.) Considering 90% of errection Nos 2 5363 ereection rate
b) Dismantling ofTransformer parts like bushings, radiators, oil from Tr. etc., (for the total wt. of the Tr.) ( 14.2+16=30.2 )(Common SR 2018-19 33KV labour Page No:16 SL No:227 It.No 49i.) MT 30.2
c) Moving the Transformer from Tr. Bed to safest point. 30.2 MT X 25 Mtr= 755MT/Mtr) (Common SR 2018-19 33KV labour Page No:16 SL No:227 It.No 49i.) MT/Mtr 755
d) Releasing of oil at 33/11kV S/s Bhatkal to the power Tr., Conservator and radiator.up to Top lid level as per actual drain in the transformer at site. (Common SR 2018-19 33KV labour Page No:16 SL No:214 It.No 46a.) Ltr 1600 2.49
e) Loading of Power Trs, CT's. PT's Breakers, C&R Panels, 11KV Switchgears from station premises(Common SR 2018-19 33KV labour Page No:15 SL No:230 It.No 49iv.) MT 30.2
f) transporation of relesed transil oil barrels from station premises to to karwar stores L/s
e) Unloading of power Transformers, CT's PT's Breakers, C&R Panels, 11 KV Switchgears, from station premises to store premises as per direction of Store keeper(Common SR 2018-19 33KV labour Page No:15 SL No:215 It.No 46 b) MT 30.2
2 Releasing OF CIRCUIT BREAKERS
a) a)Releasing, assembly, alignment and inter pole wiring of breakers with its inter connected equipments including movement from the point of unloading to the point of erection i) 33KV Circuit Breakers. As per KPTCL SR-Labour Portion, PG No 117 Sl.No:13 a Per Set 2
2 Releasing OF C&R PANEL
a) Releasing of control panels, auxilary panels, carrier cabinets etc., alignment and fixing properly to foundation base including movement from the point of unloading to the point of erection(4191*90%=3771.9) Per Set 2
3 Releasing OF 33 KV ODS
a) a)Erection, assembly, alignment and inter pole Erection, alignment & assemblyof fabricated steel latticestructure, pedestal structures &mounting structures for GOS,CTs, PTs, LAs etc.,As per KPTCL SR-Labour Portion, PG No 116 Sl.No:8 b(5723*90%=51 MT 4
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District.
Sl.No Specification Unit Qty. Rate Amount
1 Earth work in surface excavation for stripping, seating of bund, Road way by manual means for lowering & levelling the ground for all works other than foundation & depth in Ordinary rock and soft rock upto 300mm depth as per drawing and technical specifications, including setting out, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. KPWD Uni SR 2023-24, Vol-1, Pg-5, I-1.2. 80.00 x 1.70 x 1.00 = 136.00 Cum 136
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates KPWD Uni SR 2023-24, Vol-1, Pg-15, I-2.1.2. Cable Duct :80 x 1.35 x 0.10 = 10.80 Cum 10.8
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (KPWD Uni SR 2023-24, Vol-1, Pg-16, I-2.4.2) for Cement Concrete Cable duct Form work Add 35%. RCC cover slab 80 x 1.20 x 0.05 = 4.80 Raft 1 x 80.00 x 1.20 x 0.15 = 14.40 Side wall 2 x 80.00 x 1.00 x 0.15 = 24.00 Total = 43.20 Cum 43.2
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (KPWD Uni SR 2023-24, Vol-1, Pg-7, I-1.9) Duct side : 80 x 2 x 0.20 x 1.00 = 32.00 Cum 32
5 Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/ stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.42, I.No.8.6.2) Sqm 448
Slab covers 2 x 80.00 x 1.20 = 192.00
6 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Vol.1, P.No.18, I.No.2.11.h) Concrete Qty as per I. No.3 , 43.20cmt steel at 40kg /cmt = 43.20 x 40.00 = 1728 kg Tonne 1.73
9 Providing and fixing MS angles and plates and bars including welding wherever required, finishing etc. complite with two coats of enamel paint over one coat of primer including cleaning the surfece of all dirt, dust and foreign mater sand papering including cost of material labour etc.complete as per the directions of Engineer incharge. Kgs. 1144
MS angle 50x50x 6mm
MS flat 25 x 6 mm 2 x 2 x 80 @ 1.20 kg / rmt = 384 kg
10 mm dia MS rod @ 250mm c/c 2 x 320 x0.60 @ 0.62 kg / mtr = 238.08Kg
Insert plate 75 x 6mm = 54 x 0.75 x 3.80 = 153.90
Total : 1144.04
Vol-1, Pg-A40, I.No.72 SR 56 + 16.80 (30% Labour) = 72.8
Rate/Rmt of cable duct = 954170.44/80 = Rs. 11927.13
Assistant Engineer (Civil) Asst. Executive Engineer (Civil)
O & M Division, HESCOM, Sirsi Circle, HESCOM,
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District.
Sl. No. Specification Unit Qty. Rate Amount
1 Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. KPWD Uni SR 2023-24, Vol-1, Pg-5, I-1.1 Cum 150
2 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. KPWD Uni SR 2023-24, Vol-3, Pg-26, I-4.17 Cum 28.75 211050
3 Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. KPWD Uni SR 2023-24, Vol-1, Pg-7, I.no-1.8 Cum 9.59
4 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates KPWD Uni SR 2023-24, Vol-1, Pg-15, I-2.1.2 Sqm 12.5
5 Construction of M40 grade reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with Cement at 420 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. KPWD Uni SR 2023-24, Vol-3, Pg-49, I.no-6.2.1. for Cement Concrete Road Form work Add 5% Cum 18.75
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (KPWD Uni SR 2023-24, Vol.1, P.No.18, I.No.2.11.h) Tonne 1
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409. KPWD Uni SR 2023-24, Vol-3, Pg-62, I.no-8.2.b Rmt 50
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. KPWD Uni SR 2023-24, Vol-3, Pg-66, I.no-8.10 Sqm 22.5
SINGLE LINE DIAGRAM OF 33/11KV AUGUMENTATION OF 2*5MVA BY 2*8MVA OF 33/11KV SUB-STATION BHATKAL
Incoming 110KV Honnavar line
110/33/11kv SUB STATION MURDESWAR
110KV BKR 110KV BKR
PEAK LOAD IN :- 283A/14.2MW
13Kms 12Kms 33KV Kasarkod 33KV Bhatkal Idle Bay-1 Idle Bay-2
33KV Murdeswar-Bhatkal S/c line 16Kms Coyote Conductor
33/11kv SUB STATION BHATKAL
Length of 33KV Murdeswar-Bhatkal S/c line = 16Kms Coyote Conductor
Capacity of Coyote ACSR = 367 Amps ( 20.95 MVA)
Existing Transformer Capacity = 4X 5MVA (20MVA)
Capacity when 2X 5MVA is replaced by 2x8MVA = 26MVA
Capacity when 80% loading is done on Transformers 26MVA x 80%=20.8 MVA
Present loading on33KV Murdeswar Bhatkal line 278 Amps/ (15.87MVA)
Capacity when 4X 5MVA is replaced by4x8MVA 32 MVA
Capacity when 80% loading is done on Transformers 32MVA x 80%=25.6 MVA
This is not feasible on existing line
PEAK LOAD IN AMPS:217 PEAK LOAD IN AMPS:220 PEAK LOAD IN AMPS:210 PEAK LOAD IN AMPS:218
PEAK LOAD IN MW:4.2 PEAK LOAD IN MW:4.2 PEAK LOAD IN MW:4.0 PEAK LOAD IN MW:4.2
Proposed to Replace 2x5MVA by 2x8 MVA
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2025-26/EL/WORK_INDENT1112 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms 11 KV & above in R.Kms Others Cost of the work/project Rs.in Lakhs
Note:Works completed during the period from (i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24) shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
8 technical specification 1112.doc
Others - 8 technical specification 1112 • 0.58 MB
9 tender capacity.xlsx
Others - 9 tender capacity • 0.02 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
16 loss declaration 1112.xlsx
Others - 16 loss declaration 1112 • 0.01 MB
11 2x8 MVA Bhatkal Estimate 1112.xls
Others - ESTIMATE • 0.80 MB
5 section iv ECC INDENT 1112.doc
Others - 5 section iv ECC INDENT 1112 • 0.09 MB
7 Annexures.doc
Others - 7 Annexures • 0.16 MB
13 FD417EXP.pdf
Others - 13 FD417EXP • 0.12 MB
10-format-i- work done.xls
Others - 10-format-i- work done • 0.03 MB
3 section ii ITB 1112.doc
Others - 3 section ii ITB 1112 • 0.11 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
1 NIT INDENT 1112.doc
Others - 1 NIT INDENT 1112 • 0.14 MB
4 section iii GCC INDENT 1112.doc
Others - 4 section iii GCC INDENT 1112 • 0.14 MB
2 section 1 IFB 1112.doc
Others - 2 section 1 IFB 1112 • 1.41 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
6 section v SCC INDENT 1112.doc
Others - 6 section v SCC INDENT 1112 • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .