Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit II Overhauling of OLCTC System Pump LHS and RHS Inspection and Cleaning of Condenser CW box steam side Hot well and OLCTC System Ball collecting Screen Overhauling of 200 mm condenser air release cum vacuum breaking valve and Conden
2021_EB_202391_1
SE / M-I / MTPS-I / TM/OT. 89 / 2021-22
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,600
Yes
24 Jun 2021
9 Jun 2021
16 Jun 2021
9 Jun 2021
15 Jun 2021
9 Jun 2021
Amount
Overhauling of OLCTC system pump.Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump.
Dismantling of the Bearing Covers, Bearing Bracket, Dismantling of shaft sleeve and dismantling of the casing etc.,
Dismantling the impeller Assembly from the Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably inclusive of consumables and T&P charges.
Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the sleeve, Bearing Bracket Bearings, Bearing Covers and assembling the coupling in shaft including of consumables and T&P charges.
Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings, and painting of the pump base concrete structure, with Oil Distemper including the charges for T&Ps and consumables.(Paint under Contractor’s Scope)
Closing of front & Rear manhole doors of 16 Nos for Condenser LHS & RHS. Manhole doors after renewing all the manhole door rubber chords and Providing and removing condenser jack pipes during vacuum tightness test.
Inspection of OLCTC System Ball collecting screen a) Opening of OLCTC System Ball collecting screen manhole doors LHS & RHS-2Nos. and cleaning the debris and closing of manhole doors with renewal of gaskets.
Cleaning and painting works including cost of paintings. Cleaning and painting of CW Inlet & outlet pipe lines and CW Box of condenser(LHS & RHS) with double coat including cost of enamel paint Two Coat of painting of CW Inlet & outlet pipe lines of condenser in outer side (LHS & RHS) (Supply of Enamel paint is contractors scope).
Overhauling of 200mm condenser air release cum vacuum breaking valve and its isolation gate valves and gear mechanism Dismantling the isolation valve, air release cum vacuum breaking valve of size 200mm,Cleaning all the parts, lapping the seating surface like valve seat and gates, checking blue contact, changing the internals if necessary and reassembling the valves with new gland packing’s, “O” Rings etc.(Including Cost of A.C. Black paint)
Inspection and cleaning of Hot well and steam side of condenser (LHS & RHS)Opening/Closing the Condenser Steam side & Hot well manhole doors of 6 Nos., Cleaning inside the hot well to remove the dust and impurities, inspection the steam side area, cleaning of spray nozzle, cleaning the rubber chord seating groove and surface area of the manhole and closing after renewing all the manhole door rubber chords.(Rubber chord contractor scope)
Dismantling the valve, cleaning all the parts, checking the seating surfaces of Gate/seat. Lapping the seating surfaces of gate/ seat for perfect blue matching. Reassembling the valve with new gland packing rings and bonnet gaskets without any leak.
Renewal of worn out drain lines in condenser Hot well drain lines by Non IBR welder. Labour charges for IBR welding for Replacing the defective drain line valves or equivalent in Cooling water lines and ACW lines by Non IBR welder.( ERW pipe, reduce & bends)Rate for Two number Non IBR cutting and welding.
Material Charges for item Sl.No.3,5,8,9,10 &12
Charges for Consumables and T&P’s
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .