Loading…
Loading…
Tender Value
₹4.7 Cr
EMD Value
₹5.4 L
Closing Date
28 Aug 2026, 6:55 pmDue today
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
PROVISION OF SINGLE LIVING ACCOMMODATION AND MESS FOR DSC PERSONNEL AT RNDE ENGRS DIGHI, PUNE UNDER GE I RND GIRINAGAR, PUNE
2026_MES_766157_1
85339
Open Tender
Civil Works
Lump-sum
365 days
GIRINAGAR PUNE
Class A
category a(i)
8 documents required · 8 mandatory
₹2,000
GARRISON ENGINEER I RND GIRINAGAR PUNE
₹5.4 L
Yes
28 Aug 2026
18 May 2026
31 Aug 2026
18 Jun 2026
28 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Schedule 'A' Part - I
BUILDINGS & STRUCTURES
Contruction of Single living Accommodation for DSC personnel with cook house,Dinning halland stilt parking with RCC framed Construction using M-25 (Design Mix) complete all as specified and as shown on drawings. | 1 | EACH | - | - |
| 2 | Lumpsum price worked out by the Contractor for "SITE CLEARANCE AND DEVELOPMENT” as listed in Schedule ‘A’ Part - II representing _______% ___________ percent Above / Below the lumpsum price of `4,51,431.85 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 4,51,431.85 | ₹4,51,431.85 |
| - | Lumpsum price worked out by the Contractor for “INTERNAL WATER SUPPLY ” as listed in Schedule ‘A’ Part - III representing _______% ____________ percent Above / Below the lumpsum price of ` 9768.30 inserted by the MES in Schedule 'A' Part - III | 1 | LUMPSUM | 9,768.3 | ₹9,768.3 |
| - | Lumpsum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - IV representing __________ % ___________________ percent Above / Below the lumpsum price of `13,57,246.00 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 13,57,246 | ₹13,57,246 |
| - | Lumpsum price worked out by the Contractor for “ROAD / PATH / CULVERT” as listed in Schedule ‘A’ Part - V representing _______ % _______________ percent Above / Below the lumpsum price of `10,785.94 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 10,785.94 | ₹10,785.94 |
| - | Lumpsum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VI representing ______% _____________ percent Above / Below the lumpsum price of `1,95,048.20 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 1,95,048.2 | ₹1,95,048.2 |
| 7 | Lumpsum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VII representing ______ % _________________ percent Above / Below the lumpsum price of `27,822.50 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 27,822.5 | ₹27,822.5 |
| - | Lumpsum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - VIII representing ______ % _________________ percent Above / Below the lumpsum price of `27,248.00 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | LUMPSUM | 27,248 | ₹27,248 |
| - | Lumpsum price worked out by the Contractor for “COMPOUND WALL / GATE” as listed in Schedule ‘A’ Part - IX representing ______ % _________________ percent Above / Below the lumpsum price of `37,53,300.09 inserted by the MES in Schedule ‘A’ Part - IX | 1 | LUMPSUM | 37,53,300.09 | ₹37,53,300.09 |
| - | Lumpsum price worked out by the Contractor for “FENCING” as listed in Schedule ‘A’ Part - X representing ______ % _________________ percent Above / Below the lumpsum price of `3,00,005.93 inserted by the MES in Schedule ‘A’ Part - X | 1 | LUMPSUM | 3,00,005.93 | ₹3,00,005.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
85339Tender.pdf
Tender Documents • 2.04 MB
BOQ_858060.xls
BOQ • 0.56 MB
85339Pre_Priced_Schedules.pdf
Additional Documents • 0.26 MB
Drawings_Drawing_Soak_Well.pdf
Additional Documents • 5.21 MB
Drawings_LD_PN_56_2025 Sht No 01 of 01.pdf
Additional Documents • 0.24 MB
Drawings_SP_PN_1513_2025 Sht No 01 of 03.pdf
Additional Documents • 0.15 MB
Drawings_SP_PN_1513_2025 Sht No 02 of 03.pdf
Additional Documents • 0.16 MB
Drawings_SP_PN_1513_2025 Sht No 03 of 03.pdf
Additional Documents • 0.14 MB
Drawings_WD_PN_AR_551_2025 Sht No 01 of 09.pdf
Additional Documents • 0.42 MB
Drawings_WD_PN_AR_551_2025 Sht No 02 of 09.pdf
Additional Documents • 0.42 MB
Drawings_WD_PN_AR_551_2025 Sht No 03 of 09.pdf
Additional Documents • 0.40 MB
Drawings_WD_PN_AR_551_2025 Sht No 04 of 09.pdf
Additional Documents • 0.35 MB
Drawings_WD_PN_AR_551_2025 Sht No 05 of 09.pdf
Additional Documents • 0.32 MB
Drawings_WD_PN_AR_551_2025 Sht No 06 of 09.pdf
Additional Documents • 0.47 MB
Drawings_WD_PN_AR_551_2025 Sht No 07 of 09.pdf
Additional Documents • 0.27 MB
Drawings_WD_PN_AR_551_2025 Sht No 08 of 09.pdf
Additional Documents • 0.31 MB
Drawings_WD_PN_AR_551_2025 Sht No 09 of 09.pdf
Additional Documents • 0.44 MB
Drawings_WD_PN_STR_551_2025 Sht No 01 of 06.pdf
Additional Documents • 0.40 MB
Drawings_WD_PN_STR_551_2025 Sht No 02 of 06.pdf
Additional Documents • 0.29 MB
Drawings_WD_PN_STR_551_2025 Sht No 03 of 06.pdf
Additional Documents • 0.23 MB
Drawings_WD_PN_STR_551_2025 Sht No 04 of 06.pdf
Additional Documents • 0.35 MB
Drawings_WD_PN_STR_551_2025 Sht No 05 of 06.pdf
Additional Documents • 0.36 MB
Drawings_WD_PN_STR_551_2025 Sht No 06 of 06.pdf
Additional Documents • 0.35 MB
85339Amendment1.pdf
PDF • 0.25 MB
85339Postponement.pdf
PDF • 0.18 MB
Revised_Prepriced_Schedules.pdf
PDF • 0.29 MB
Revised drawings_LD-PN-56-2025 Sht No 1 OF 1.pdf
PDF • 0.25 MB
Revised drawings_TD drawings_TD_td 291.pdf
PDF • 0.99 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 2 of 9.pdf
PDF • 0.07 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 3 of 9.pdf
PDF • 0.05 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 4 of 9.pdf
PDF • 0.08 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 6 of 9.pdf
PDF • 0.06 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 8 of 9.pdf
PDF • 0.06 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 9 of 9.pdf
PDF • 0.14 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 1 of 9pvc windows.pdf
PDF • 0.10 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 5 of 9.pdf
PDF • 0.07 MB
Revised drawings_TD drawings_TD_TD-414R Sht 1 of 9_TD 414 - R Sht 7 of 9.pdf
PDF • 0.09 MB
Revised drawings_TD drawings_TD_TD-431,-1-2.lnk
PDF • 0.00 MB
Revised drawings_TD drawings_TD_TD-431,-2-2.PDF
PDF • 0.09 MB
Revised drawings_TD drawings_TD_TD-AR-18-19-95-.lnk
PDF • 0.01 MB
Revised drawings_TD drawings_TD_TD-AR-35-99 Sht 1-12 to 8-12.......... 9,10,11,12 not clear.lnk
PDF • 0.01 MB
Revised drawings_TD drawings_TD_TD-AR-37-2000 Sht 1-1.pdf
PDF • 0.08 MB
Revised drawings_TD drawings_TD_TD_382_2005 Sht no- 1_1.PDF
PDF • 0.18 MB
Revised drawings_WD-PN-AR-551-2025 Sht No 3R OF 9.pdf
PDF • 0.34 MB
Revised drawings_WD-PN-AR-551-2025 Sht No 9 OF 9.pdf
PDF • 0.38 MB
Revised drawings_WD_PN_AR_551_2025 Sht 1R of 9.pdf
PDF • 0.36 MB
Revised drawings_WD_PN_AR_551_2025 Sht No 2R of 9.pdf
PDF • 0.35 MB
Revised drawings_WD_PN_AR_551_2025 Sht No 4R of 9.pdf
PDF • 0.31 MB
Revised drawings_WD_PN_AR_551_2025 Sht No 5R of 9.pdf
PDF • 0.26 MB
Revised drawings_WD_PN_AR_551_2025 Sht No 6R of 9.pdf
PDF • 0.38 MB
85339Amendment.pdf
PDF • 0.44 MB
85339Postponement.pdf
PDF • 0.18 MB
85339Postponement.pdf
PDF • 0.18 MB
85339Postponement.pdf
PDF • 0.18 MB
85339Postponement.pdf
PDF • 0.18 MB
85339Postponement.pdf
PDF • 0.18 MB
85339Postponement.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].