| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.6 L+₹1.2 L (4.84%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹25.8 L+₹1.4 L (5.82%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M S DHERENDRA KUMAR PANDEY L2 | M/S ANAND CONSTRUCTION COMPANY L1 | M/S RADHIKA CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|
| 1.00 | E/W excavation of foundation including backfilling in all type of soil with all lead,lift,dressing & manual compaction etc. complete. | 1,077.37 | M3 | 70 ₹75,415.9 | 69 ₹74,338.53 | 65 ₹70,029.05 Lowest |
| 2.00 | Laying C.C. 1:3:6 in foundation with coarse sand & stone aggregate 20 to 40 mm. including cost of all material, labour and T&P etc. complete for completion of work. | 86.23 | M3 | 6,500 ₹5,60,495 Lowest | 6,600 ₹5,69,118 | 7,300 ₹6,29,479 |
| 3.00 | 1st class Brick work in 1:4 C.M. with Hamirpur coarse sand including cost of bricks. labour and T&P etc. complete for completion of work. | 197.68 | M3 | 5,550 ₹10,97,124 | 4,731 ₹9,35,224.08 Lowest | 5,400 ₹10,67,472 |
| 4.00 | Centering and shuttering for C.C. work including cost of all materials. | 167.41 | M2 | 350 ₹58,593.5 | 320 ₹53,571.2 Lowest | 340 ₹56,919.4 |
| 5.00 | Laying and fixing in position and alinement 1200 mm Dia NP-3 pipe excluding excavation back filling and cost of material | 50 | R.M. | 8,000 ₹4,00,000 | 6,010 ₹3,00,500 Lowest | 6,300 ₹3,15,000 |
| 6.00 | Laying C.C. 1:1.5:3 with Hamirpur coarse sand & crushed coarse aggregate 4.75 to 20 mm. in bearing coat including cost of all material, labour and T&P etc. complete for completion of work. | 28.92 | M3 | 8,000 ₹2,31,360 | 7,474 ₹2,16,148.08 Lowest | 8,600 ₹2,48,712 |
| 7.00 | Struck deep cement pointing with 1:2 (1part of cement and 2 part of coarse sand) cement mortar, including cost of all material, labour and T&P etc. | 101.44 | M2 | 100 ₹10,144 | 79.57 ₹8,071.58 Lowest | 85 ₹8,622.4 |
| 8.00 | Boring with 15 cm.casing pipe including lowering of assembly and extracting casing pipe with contractors T&Pand equipment upto 30 M. | 90 | R.M. | 300 ₹27,000 Lowest | 550 ₹49,500 | 400 ₹36,000 |
| 9.00 | Hiring charges of 5H.P.Diesel pump including operator and P.O.L.for running hours | 1,440 | Per Hour | 30 ₹43,200 Lowest | 125 ₹1,80,000 | 90 ₹1,29,600 |
| 10.00 | Supply and laying of Sand filling including cost of all material labour T&P etc | 57.87 | M3 | 1,000 ₹57,870 | 975 ₹56,423.25 | 400 ₹23,148 Lowest |
Tender Value
₹33.5 L
EMD Value
₹67,000
Closing Date
15 Feb 2024, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
E.E. Rapti Nahar Nirman Khand-2, Shohratgarh Siddharthnagar
Construction of Syphon at km. 19.425 of Itwa branch.
2024_UPIDC_892403_1
06/EE/2023-24
Open Tender
Civil Works
Item Rate
90 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹67,000
Yes
7 Aug 2025
9 Feb 2024
15 Feb 2024
9 Feb 2024
15 Feb 2024
9 Feb 2024
Amount
E/W excavation of foundation including backfilling in all type of soil with all lead,lift,dressing & manual compaction etc. complete.
Laying C.C. 1:3:6 in foundation with coarse sand & stone aggregate 20 to 40 mm. including cost of all material, labour and T&P etc. complete for completion of work.
1st class Brick work in 1:4 C.M. with Hamirpur coarse sand including cost of bricks. labour and T&P etc. complete for completion of work.
Centering and shuttering for C.C. work including cost of all materials.
Laying and fixing in position and alinement 1200 mm Dia NP-3 pipe excluding excavation back filling and cost of material
Laying C.C. 1:1.5:3 with Hamirpur coarse sand & crushed coarse aggregate 4.75 to 20 mm. in bearing coat including cost of all material, labour and T&P etc. complete for completion of work.
Struck deep cement pointing with 1:2 (1part of cement and 2 part of coarse sand) cement mortar, including cost of all material, labour and T&P etc.
Boring with 15 cm.casing pipe including lowering of assembly and extracting casing pipe with contractors T&Pand equipment upto 30 M.
Hiring charges of 5H.P.Diesel pump including operator and P.O.L.for running hours
Supply and laying of Sand filling including cost of all material labour T&P etc
M S DHERENDRA KUMAR PANDEY
M/S RADHIKA CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .