Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-AOC | ₹18.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.7 L+₹14,723.23 (0.79%)Rejected-AOC SOUTH MADA STREET | CHENNAI | TAMIL NADU | 600001 | ₹18.7 L+₹14,723.23 (0.79%) | L2 | Rejected-AOC REJECTED |
| 3 | L3₹20.9 L+₹2.3 L (12.5%)Rejected-AOC | ₹20.9 L+₹2.3 L (12.5%) | L3 | Rejected-AOC REJECTED |
| 4 | L4₹20.9 L+₹2.3 L (12.7%)Rejected-AOC | ₹20.9 L+₹2.3 L (12.7%) | L4 | Rejected-AOC REJECTED |
| 5 | L5₹20.9 L+₹2.3 L (12.7%)Rejected-AOC | ₹20.9 L+₹2.3 L (12.7%) | L5 | Rejected-AOC REJECTED |
Tender Value
₹22.0 L
EMD Value
₹22,000
Closing Date
25 Jun 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
DESILTING OF STORM WATER DRAINS AND MINOR REPAIR WORKS AT VARIOUS STREETS IN DN-97 AND 104, UNIT-21 ZONE-8
2026_CoC_681933_1
Z.O.VIII.C.NO.E1/4826/1/2026
Open Tender
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹22,000
11 Aug 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting of Storm Water Drain | 4,753.54 | CUM | 162.71 | ₹7,73,448.49 |
| 2 | Carting away the surplus earth and debris to a lea...Corporation Land as directed during the execution. | 783.41 | CUM | 216.48 | ₹1,69,592.6 |
| 3 | Supplying and fixing of 24" FRC manhole cover with...ll be painted with anti corrosive bitumastic paint | 20 | EACH | 4,434.3 | ₹88,686 |
| 4 | Supplying and fixing of 24" FRC manhole cover with...ll be painted with anti corrosive bitumastic paint | 18 | EACH | 4,962.22 | ₹89,319.96 |
| 5 | Conveyance by roads in plains 0 to 10 km including Loading unloading and transportation charges | 2,597 | CUM | 225 | ₹5,84,325 |
| 6 | Construction of cast -in- situ Silt Catch Pit of i... x 450mm -25 MT -completing the finishing work etc | 20 | EACH | 17,562.84 | ₹3,51,256.8 |
| 7 | Dismantling R.C.C.works carefully clearing away the debris as directed during execution. | 1.09 | CUM | 4,739.57 | ₹5,166.13 |
| 8 | Supplying and erecting shuttering including necess...dia spaced at 75cmcentre to centre etc. complete.. | 8.4 | SQM | 836.55 | ₹7,027.02 |
| 9 | Supplying, fabricating and placing in position Rib...ngements for the supply of steel and binding wire) | 161 | KGS | 94 | ₹15,134 |
| 10 | Providing And Laying In Position, Standarded Concr...The Department For The Excess Usage of Materials). | 1.8 | CUM | 9,398.08 | ₹16,916.54 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_819567.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .