SCPAR -2020-21 Package No.09/2020-21 Yercaud Block in Salem District No of Works -01
2021_RDTN_192382_42
Roc.No.08/2021/A6
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per tender schedule
3 documents required · 3 mandatory
₹0
₹50,000
DRDA, SALEM
22 Feb 2021
2 Feb 2021
17 Feb 2021
2 Feb 2021
17 Feb 2021
2 Feb 2021
3 Feb 2021
Amount
1.) Upgradation to the Road from Arangam Pelakadu road to Malayankadu Km 0/0 - 0/450
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-0/450
Blasting to the Hard Rock Requiring Blasting & Stacking Hard Granite Surface for Hard Solid Measured inculding all Charges etc Complete.., Km 0/0-0/450
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction . Km 0/0-0/450
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .Km 0/0-0/450
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.Km 0/0-0/450
Providing and laying Prime coat over the WMM surface using 7.00 Kg of bituminous emulsion) for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0- 0/450
Providing and laying Tack coat over thePrime WMM surface using 2.50 Kg of bituminous emulsion) for 10 sqm. Including cost of bituminous emulsion( RS-1) including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. .Km 0/0- 0/450
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete . Km 0/0- 0/450
Hectametre Stone
Sign Board
1.A) Hard Bed @ Km 0/030
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc (Below Sill)
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for
1.B) Protection Wall @ Km 0/380
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Random Rubble masonry in cement mortar 1:5. with simultaneous pointing using new stones from approved sources including cost and conveyance rough stones and bond stones including cost of cement which will be supplied departmentally at the departmental sec
Plastering with cement mortar 1:5 20 mm thick including cost and conveyance of all materials to site including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at departmental section stores and th
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V THANGARAJ
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .