Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.3 L+₹3,494.40 (2.73%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.4 L+₹9,318.40 (7.28%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Not Admitted-Fee/PreQual/Technical D 203 SUPERTECH GREEN VILLAGE PARTAPUR HAPUR BY PASS ROAD MEERUT MEERUT UTTAR PRADESH 250002 | MEERUT | UTTAR PRADESH | 250002 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Gupta Elect and Engg Works L1 | Perfect Power Transformer Associates L2 | Meena Elect & Engg. Works L3 |
|---|---|---|---|---|---|---|
| 1.00Stoppage of oil leakage from top cover, Tank Periphery, turret, and other flanges with the application of cold welding product of High Epoxy (USA make) consisting of Steel fast, Titan Band, Great cleaner & Silicon Sealant installed at below mentioned primary sub-stations. | ||||||
| 2.00 | 40 MVA ECE make Transformer installed at 132 KV Sub-Station Ganga Nagar | 5.75 | RMT | 15,380 ₹88,435 Lowest | 15,800 ₹90,850 | 16,500 ₹94,875 |
| 3.00 | 200 MVA Aditya make Transformer installed at 220 KV Sub-Station Shatabdinagar | 2.57 | RMT | 15,380 ₹39,526.6 Lowest | 15,800 ₹40,606 | 16,500 ₹42,405 |
Tender Value
₹1.3 L
EMD Value
₹1,600
Closing Date
25 Oct 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ETD MEERUT
EXECUTIVE ENGINEER PARESHAN BHAWAN 130D VICTORIA PARK MEERUT
Stoppage of oil leakage from various Transformers at different Primary SubStations under ETD Meerut
2025_UPTCL_1082440_1
ETD/MT/T-04/2025-26
Open Tender
Electrical Works
Item Rate
90 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD MEERUT
₹1,600
6 Nov 2025
13 Oct 2025
25 Oct 2025
13 Oct 2025
25 Oct 2025
13 Oct 2025
Stoppage of oil leakage from top cover, Tank Periphery, turret, and other flanges with the application of cold welding product of High Epoxy (USA make) consisting of Steel fast, Titan Band, Great cleaner & Silicon Sealant installed at below mentioned primary sub-stations.
40 MVA ECE make Transformer installed at 132 KV Sub-Station Ganga Nagar
200 MVA Aditya make Transformer installed at 220 KV Sub-Station Shatabdinagar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tenderdoc04.pdf
Tender Documents • 0.94 MB
BOQ_1982213.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .