| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAdmitted-Finance | ₹42.6 L | L1 | Admitted-Finance |
| 2 | L2₹55.8 L+₹13.2 L (30.9%)Admitted-Finance | ₹55.8 L+₹13.2 L (30.9%) | L2 | Admitted-Finance |
| 3 | L3₹56.4 L+₹13.7 L (32.2%)Admitted-Finance | ₹56.4 L+₹13.7 L (32.2%) | L3 | Admitted-Finance |
| 4 | L4₹59.6 L+₹16.9 L (39.7%)Admitted-Finance | ₹59.6 L+₹16.9 L (39.7%) | L4 | Admitted-Finance |
| 5 | L5₹60.3 L+₹17.6 L (41.4%)Admitted-Finance | ₹60.3 L+₹17.6 L (41.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Harihar Nayak L1 | Meer Construction L7 | M/S BHAIRAB CHARAN SWAIN L2 | Manas Ranjan Pal L3 | BIBEKANANDA MOHAPATRA L4 | M/S. BIKRAM KUMAR SAMAL L5 | LAXMIDHAR ROUT L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of RCC works by Jack hammer or any approved method along with box cutting the edges in square/rectangle shape with a concrete cutter machine and disposing the same with supply of all labour, engagement, hire & running charges of all equipments, T&P, all taxes, Port entry fees, providing safety arrangements for workmen, cleaning the site, all transportation etc all complete but excluding GST and as directed by the Engineer in charge. | 680 | Each Cum | 20 ₹13,600 Lowest | 400 ₹2,72,000 | 380 ₹2,58,400 | 300 ₹2,04,000 | 350 ₹2,38,000 | 300 ₹2,04,000 | 1,008 ₹6,85,440 |
| 2.00 | Drilling of 300 mm deep holes on concrete surface for fixing 12mm dia reinforcement bars by any approved method, cleaning the hole by blow out pump, grouting the reinforcement bars with approved anchoring adhesive resins, transporting, cutting, placing, proper fixing of reinforcement bars with cost & expenses of all materials, tools and plants, machineries, taxes, tollages, Port entry fees including providing barricades to the working area, all safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge. | 500 | Each No. | 10 ₹5,000 Lowest | 600 ₹3,00,000 | 95 ₹47,500 | 200 ₹1,00,000 | 220 ₹1,10,000 | 50 ₹25,000 | 180 ₹90,000 |
| 3.00 | Earth work in excavation in all kinds of soil which may include ordinary soil, sand, silt, slusy soil with all leads, lifts and de-lifts, loading, unloading, handling, re-handling with cost of all labour, transportation, dewatering (if required) & subsequent removal at appropriate time including site illumination, mobilization, demobilization, approach road, engagement, hire & running charges of all machineries, fuel & lubricants with all taxes, T&P, Port entry fees, all safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge. | 500 | Each Cum | 10 ₹5,000 Lowest | 400 ₹2,00,000 | 85 ₹42,500 | 90 ₹45,000 | 100 ₹50,000 | 40 ₹20,000 | 180 ₹90,000 |
| 4.00 | Providing Rigid and smooth leak proof centering and shuttering for RCC works in slabs including dismantling them after setting with cost of all material, labour, T&P, taxes, tollage, gate entry fees etc all complete excluding GST and as per direction of Engineer in charge.
Foundation and plinth. | 1,050 | Each Sqm | 10 ₹10,500 Lowest | 450 ₹4,72,500 | 72 ₹75,600 | 70 ₹73,500 | 75 ₹78,750 | 90 ₹94,500 | 270 ₹2,83,500 |
| 5.00 | Cement concrete of M-30 grade (using Crusher broken hard granite chips of 12 mm to 20.0 mm size of approved quality for R.C.C work), mixing in a Batching Plant of required capacity, transporting the concrete by any approved means including admixture in recommended proportion as per IS-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with hoisting, laying, compacting by mechanical Vibrator, curing etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries, operator expences etc. all complete excluding GST and as directed by Engineer in charge.
N.B: The item is excluding cost of form work, cost of binding wire, cost of Steel & labour charges for bending & binding of steel. | 748 | Each Cum | 5,000 ₹37,40,000 | 9,000 ₹67,32,000 | 4,700 ₹35,15,600 Lowest | 4,700 ₹35,15,600 Lowest | 5,100 ₹38,14,800 | 5,700 ₹42,63,600 | 5,040 ₹37,69,920 |
| 6.00 | Supply Tor/TMT from Greenfield Steel Manufacture Integrated Steel Plant of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge.
NB: No payment shall be made for extra weight than theoretical co-efficient. | 65 | Each Qntl | 5,000 ₹3,25,000 | 800 ₹52,000 Lowest | 5,300 ₹3,44,500 | 5,500 ₹3,57,500 | 6,000 ₹3,90,000 | 5,000 ₹3,25,000 | 6,300 ₹4,09,500 |
| 7.00 | Supplying and forming 12mm wide x 60mm deep contraction joints by fixing 25mm dia 450mm long Mild Steel round bars @ 300C/C including painting two third of the bars with anticorrosive paint & covering the same with 1.25mm thick tough & durable plastic sheathing, providing & fixing bitumen paper, painting one side of concrete surface with bitumastic black paint and sealing the grooves with bitumastic filler including cost of all materials, T&P, labour, all taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. | 280 | Each Running Meter | 200 ₹56,000 | 100 ₹28,000 Lowest | 650 ₹1,82,000 | 300 ₹84,000 | 300 ₹84,000 | 550 ₹1,54,000 | 900 ₹2,52,000 |
| 8.00 | Modified all weather bitumen paste in liquid asphalt wih chemicals anti stripping agents graded aggregate and additives (25 Kg./ Packet) including cost of all materials, T&P, labour, all taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. | 4,000 | Each Kg. | 5 ₹20,000 Lowest | 150 ₹6,00,000 | 20 ₹80,000 | 70 ₹2,80,000 | 75 ₹3,00,000 | 23 ₹92,000 | 225 ₹9,00,000 |
| 9.00 | Two component, polysulphide polymer based UV resistant flexible, tear resistant, rubbery, self-levelling, pourable non-staining sealant (16 Kg./ Pack) including cost of all materials, T&P, labour, all taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. | 1,000 | Each Kg. | 10 ₹10,000 Lowest | 200 ₹2,00,000 | 110 ₹1,10,000 | 800 ₹8,00,000 | 700 ₹7,00,000 | 128 ₹1,28,000 | 450 ₹4,50,000 |
| 10.00 | Supply of all labour & materials for repairing of the concrete surface at different locations, barricading the affecting area using big concrete blocks, cleaning, drying, chipping the edges and sides to required depth, providing cement based flowable, two stage expanding grout of any approved make with selected aggregate, providing resinous adhesive of approved brand suitable for bonding between old concrete surface and new cementious grouting material, providing high quality & high strength cementious grout in 2:1 proportion (2 - Grout powder of approved brand : 1 - 10mm down chips) over the prepared surface, vibrating, leveling with the existing road surface, proper protection of the newly prepared surface with curing, disposing the debrises at suitable place, providing all T&P and machineries required for the work with all taxes, tollage, Port entry fees, hire & running charges of machineries, all transportation, providing watchman round the clock, executing the work to the satisfaction of the Department etc. all complete excluding GST and as directed by Engineer in charge.
(Over deteriorated concrete surface) | 14 | Each Cum | 5,000 ₹70,000 | 3,000 ₹42,000 Lowest | 58,000 ₹8,12,000 | 5,500 ₹77,000 | 6,000 ₹84,000 | 45,000 ₹6,30,000 | 7,200 ₹1,00,800 |
Tender Value
₹76.1 L
EMD Value
₹1.5 L
Closing Date
5 Aug 2026, 5:15 pmClosed
EE,HWD-I,PPA
Office of the Harbour Works Division No.I, Engineering Department, Paradip Port Authority, First Floor, Administrative Building, Mob-9777660851
Annual repair to Concrete Roads inside Harbour area.
2026_MoS_917606_1
CE/HWDI/ACCTS-22/25/210
Open Tender
Civil Works
Works
365 days
paradip
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Yes
As mentioned in eTCN and TD
₹1.5 L
Yes
10 Sept 2026
15 Jul 2026
6 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of RCC works by Jack hammer or any approved method along with box cutting the edges in square/rectangle shape with a concrete cutter machine and disposing the same with supply of all labour, engagement, hire & running charges of all equipments, T&P, all taxes, Port entry fees, providing safety arrangements for workmen, cleaning the site, all transportation etc all complete but excluding GST and as directed by the Engineer in charge. | 680 | Each Cum | - | - |
| 2 | Drilling of 300 mm deep holes on concrete surface for fixing 12mm dia reinforcement bars by any approved method, cleaning the hole by blow out pump, grouting the reinforcement bars with approved anchoring adhesive resins, transporting, cutting, placing, proper fixing of reinforcement bars with cost & expenses of all materials, tools and plants, machineries, taxes, tollages, Port entry fees including providing barricades to the working area, all safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge. | 500 | Each No. | - | - |
| 3 | Earth work in excavation in all kinds of soil which may include ordinary soil, sand, silt, slusy soil with all leads, lifts and de-lifts, loading, unloading, handling, re-handling with cost of all labour, transportation, dewatering (if required) & subsequent removal at appropriate time including site illumination, mobilization, demobilization, approach road, engagement, hire & running charges of all machineries, fuel & lubricants with all taxes, T&P, Port entry fees, all safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge. | 500 | Each Cum | - | - |
| 4 | Providing Rigid and smooth leak proof centering and shuttering for RCC works in slabs including dismantling them after setting with cost of all material, labour, T&P, taxes, tollage, gate entry fees etc all complete excluding GST and as per direction of Engineer in charge.
Foundation and plinth. | 1,050 | Each Sqm | - | - |
| 5 | Cement concrete of M-30 grade (using Crusher broken hard granite chips of 12 mm to 20.0 mm size of approved quality for R.C.C work), mixing in a Batching Plant of required capacity, transporting the concrete by any approved means including admixture in recommended proportion as per IS-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with hoisting, laying, compacting by mechanical Vibrator, curing etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries, operator expences etc. all complete excluding GST and as directed by Engineer in charge.
N.B: The item is excluding cost of form work, cost of binding wire, cost of Steel & labour charges for bending & binding of steel. | 748 | Each Cum | - | - |
| 6 | Supply Tor/TMT from Greenfield Steel Manufacture Integrated Steel Plant of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge.
NB: No payment shall be made for extra weight than theoretical co-efficient. | 65 | Each Qntl | - | - |
| 7 | Supplying and forming 12mm wide x 60mm deep contraction joints by fixing 25mm dia 450mm long Mild Steel round bars @ 300C/C including painting two third of the bars with anticorrosive paint & covering the same with 1.25mm thick tough & durable plastic sheathing, providing & fixing bitumen paper, painting one side of concrete surface with bitumastic black paint and sealing the grooves with bitumastic filler including cost of all materials, T&P, labour, all taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. | 280 | Each Running Meter | - | - |
| 8 | Modified all weather bitumen paste in liquid asphalt wih chemicals anti stripping agents graded aggregate and additives (25 Kg./ Packet) including cost of all materials, T&P, labour, all taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. | 4,000 | Each Kg. | - | - |
| 9 | Two component, polysulphide polymer based UV resistant flexible, tear resistant, rubbery, self-levelling, pourable non-staining sealant (16 Kg./ Pack) including cost of all materials, T&P, labour, all taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. | 1,000 | Each Kg. | - | - |
| 10 | Supply of all labour & materials for repairing of the concrete surface at different locations, barricading the affecting area using big concrete blocks, cleaning, drying, chipping the edges and sides to required depth, providing cement based flowable, two stage expanding grout of any approved make with selected aggregate, providing resinous adhesive of approved brand suitable for bonding between old concrete surface and new cementious grouting material, providing high quality & high strength cementious grout in 2:1 proportion (2 - Grout powder of approved brand : 1 - 10mm down chips) over the prepared surface, vibrating, leveling with the existing road surface, proper protection of the newly prepared surface with curing, disposing the debrises at suitable place, providing all T&P and machineries required for the work with all taxes, tollage, Port entry fees, hire & running charges of machineries, all transportation, providing watchman round the clock, executing the work to the satisfaction of the Department etc. all complete excluding GST and as directed by Engineer in charge.
(Over deteriorated concrete surface) | 14 | Each Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_964304.xls
BOQ • 0.28 MB
ConcreteRd26TD.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .