| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.2 LAccepted-AOC | L1 | Accepted-AOC Award of Contract | |
| 2 | Rejected-Technical | - | Rejected-Technical BQR conditions not satisfied | |
| 3 | Rejected-Technical | - | Rejected-Technical BQR conditions not satisfied | |
| 4 | Rejected-Technical | - | Rejected-Technical BQR conditions not satisfied |
| Sl No | Description | Qty | Unit | S.VIGNESH L1 |
|---|---|---|---|---|
| 1.00 | A1.
Chipping the existing damaged Concrete, roughening & Cleaning the surface, disposed from the site as per the direction of site engineer including cost of all labour, lead, lift etc., complete | 315 | M2 | 160 ₹50,400 Lowest |
| 2.00 | Earthwork excavation for foundation with an initial lead, lift etc., complete.
2a. Earthwork excavation in hard stiff clay stiff black cotton, hard red earthm shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation. | 2.5 | M3 | 270 ₹675 Lowest |
| 3.00 | Earthwork excavation for foundation with an initial lead, lift etc., complete.
2b. SDR not requiring blasting in earthwork excavation. | 2.5 | M3 | 400 ₹1,000 Lowest |
| 4.00 | Providing two legged scaffolding using 15cm diameter blue-gum posts or casuarina posts of best quality bamboo posts of 4m over all length (3m + 0.5m projection + 0.5m into the ground) the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platfom with country wood planks of 40mm thick and 1m width etc., in a complete form using coir and nails 1m run. (For a length of 15m & height of 12m) | 2 | Nos | 1,00,000 ₹2,00,000 Lowest |
| 5.00 | RCC 1:1.5:3 using 12-20mm (M20) graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete upto 4.5m height. | 37 | M3 | 20,000 ₹7,40,000 Lowest |
| 6.00 | RCC 1:1.5:3 using 12-20mm (M20) graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete upto 4.5m to 12m height. | 69 | M3 | 27,000 ₹18,63,000 Lowest |
| 7.00 | RCC 1:1.5:3 using 12-20mm (M20) graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. For Beam concrete. | 42 | M3 | 24,000 ₹10,08,000 Lowest |
| 8.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in position of the steel reinforcement all materials, lead, and lift etc., complete. | 11,900 | Kg | 80 ₹9,52,000 Lowest |
| 9.00 | Plastering with CM 1:3, 12mm thick for columns, beams, including cost of cement, all materials, curing, labour, lead and lift etc., complete. | 620 | M2 | 350 ₹2,17,000 Lowest |
| 10.00 | Colour washing two coats with approved quality of ASIAN ULTIMA paint over one coat of white cement including cost of all materials, labour, lead, lift etc., complete. | 620 | M2 | 290 ₹1,79,800 Lowest |
Tender Value
Refer Docs
EMD Value
₹47,700
Closing Date
19 Aug 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC/Madurai
SE/GCC/Madurai
Replacement damaged RCC Gantry Structures between 230KV N.M.Patty Amuthapuram 230KV Checkkanoorani
2025_EB_589821_1
SE/GCC/Madurai F. Specn. No.023/2025-26
Open Tender
Civil Works - Others
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹47,700
9 Oct 2025
7 Aug 2025
20 Aug 2025
7 Aug 2025
19 Aug 2025
7 Aug 2025
Amount
A1. Chipping the existing damaged Concrete, roughening & Cleaning the surface, disposed from the site as per the direction of site engineer including cost of all labour, lead, lift etc., complete
Earthwork excavation for foundation with an initial lead, lift etc., complete. 2a. Earthwork excavation in hard stiff clay stiff black cotton, hard red earthm shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation.
Earthwork excavation for foundation with an initial lead, lift etc., complete. 2b. SDR not requiring blasting in earthwork excavation.
Providing two legged scaffolding using 15cm diameter blue-gum posts or casuarina posts of best quality bamboo posts of 4m over all length (3m + 0.5m projection + 0.5m into the ground) the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platfom with country wood planks of 40mm thick and 1m width etc., in a complete form using coir and nails 1m run. (For a length of 15m & height of 12m)
RCC 1:1.5:3 using 12-20mm (M20) graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete upto 4.5m height.
RCC 1:1.5:3 using 12-20mm (M20) graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete upto 4.5m to 12m height.
RCC 1:1.5:3 using 12-20mm (M20) graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. For Beam concrete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in position of the steel reinforcement all materials, lead, and lift etc., complete.
Plastering with CM 1:3, 12mm thick for columns, beams, including cost of cement, all materials, curing, labour, lead and lift etc., complete.
Colour washing two coats with approved quality of ASIAN ULTIMA paint over one coat of white cement including cost of all materials, labour, lead, lift etc., complete.
Releasing and lowering and restringing of existing 3 Nos. Zebra Conductor inside SS including all labour, lead, lifts, T&P etc., complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .